Data
Free data centre datasets
Download our records as open JSON and CSV: data centre projects, operators, suppliers, cloud regions, policy and country indicators. Every number keeps its definition, date and source. Unknown values stay unknown, never zero.
At a glance
12
open datasets you can download as JSON, free, with stable ids
717
published records across those files, counted at the last build
20
country indicators below, each with its publisher, period and link
7
countries with at least one sourced indicator
These counts describe our own coverage, not the size of any market. Records are added only when a dated public source supports them.
Tap or hover a bar for the file to download. Counted from the published records at build time; draft records are never exported.
Source: CoolPower Index published records, catalogue at /data/v1/index.json (generated 11 Nov 2026).
Show the data as a table
| Dataset | Records | File |
|---|---|---|
| Every published numeric claim with value kind, scale, normalised value, qualification and roll-up eligibility | 178 | /data/v1/claims.json |
| Data centre project, campus and phase records with metric claims | 122 | /data/v1/projects.json |
| Supplier listings with researched evidence where available | 103 | /data/v1/suppliers.json |
| Canonical events: one entry per event with linked entities and its source group | 97 | /data/v1/events.json |
| Cloud regions (service areas, no MW figures) | 67 | /data/v1/cloud-regions.json |
| Operator, hyperscaler and developer profiles | 59 | /data/v1/operators.json |
| Country market profiles | 32 | /data/v1/countries.json |
| Policy records with status, dates and deadlines | 21 | /data/v1/policies.json |
| Corrections and revisions with before and after summaries and sources | 18 | /data/v1/revisions.json |
| Technology guides | 10 | /data/v1/technologies.json |
| Guides and checklists | 5 | /data/v1/resources.json |
| Capacity roll-up rows with contributing records and exclusions (tracked public coverage, not national totals) | 5 | /data/v1/totals.json |
Indicators come from different publishers and methods, so a longer bar means more coverage on this site, not a bigger market. Read each indicator's note in the table below before comparing countries.
Source: the indicator records in the table below, each linked to its publisher.
Show the data as a table
| Country | Indicators |
|---|---|
| Malaysia | 6 |
| Germany | 3 |
| Ireland | 3 |
| United Kingdom | 3 |
| Singapore | 2 |
| United States | 2 |
| Saudi Arabia | 1 |
Malaysia
Germany
Ireland
United Kingdom
Singapore
United States
Saudi Arabia
Global and regional figures for electricity, PUE, rack density, liquid cooling, vacancy, capex, grid queues and water are on the statistics hub, with charts and CSV downloads.
Country indicators
| Country | Indicator | Value | Period | Source |
|---|---|---|---|---|
| Germany | Data centre IT connected load (Borderstep estimate) Third-party estimate cited in federal strategy. | 2,980 MW Modelled estimate | 2025 | bmftr.bund.de (opens in a new tab) |
| Germany | Data centre electricity consumption About 4% of gross electricity consumption. | 21 TWh Official source | 2025 | bmftr.bund.de (opens in a new tab) |
| Germany | Projected IT connected load (Borderstep) Projection, not a target. | 5,000 MW Modelled estimate | 2030 | bmftr.bund.de (opens in a new tab) |
| Ireland | Data centre share of metered electricity consumption | 23% Official source | 2025 | cso.ie (opens in a new tab) |
| Ireland | Data centre metered electricity consumption 2024 restated as 6,973 GWh in the 2025 release (6,969 GWh in the 2024 release). | 7,663 GWh Official source | 2025 | cso.ie (opens in a new tab) |
| Ireland | Forecast data centre electricity demand EirGrid forecast cited by CRU, from 9.4 TWh in 2025. | 14.6 TWh Modelled estimate | 2034 | cru.ie (opens in a new tab) |
| Malaysia | Actual electricity use of 20 operating data centres, Johor | 919.97 MW Official source | March 2026 | mediadigitaljohor.gov.my (opens in a new tab) |
| Malaysia | Approved data centre capacity, 28 projects, Johor Approvals, not built capacity. | 5,628 MW Official source | May 2026 | mediadigitaljohor.gov.my (opens in a new tab) |
| Malaysia | Investment in projects approved by Data Centre Task Force 27 projects: 16 Johor, 10 Selangor, 1 Negeri Sembilan. | MYR 225.97 billion Third-party reported | to July 2026 | thestar.com.my (opens in a new tab) |
| Malaysia | Operational data centre capacity, Johor (third-party estimate) Data centre capacity, IT or facility basis not stated by the source | 1,110 MW Modelled estimate | 2026 | theguardian.com (opens in a new tab) |
| Malaysia | Data centre capacity under construction or planned, Johor (third-party estimate) Data centre capacity, IT or facility basis not stated by the source | 3,088 MW Modelled estimate | 2026 | theguardian.com (opens in a new tab) |
| Malaysia | Data centres' share of Johor's total power consumption (third-party estimate) Share of the state's total electricity consumption | 24% Modelled estimate | 2026 | theguardian.com (opens in a new tab) |
| Saudi Arabia | Operational data centre capacity Basis not defined. 440 MW in 2025, 68 MW in 2021. | 467 MW Official source | 2026-Q1 | mcit.gov.sa (opens in a new tab) |
| Singapore | Data centre capacity "Over 1.4 gigawatts", basis not stated. | at least 1.4 GW Official source | 2024-05 | imda.gov.sg (opens in a new tab) |
| Singapore | DC-CFA2 provisional allocation Four operators, 50 MW each. | 200 MW Official source | 2026-08 | edb.gov.sg (opens in a new tab) |
| United Kingdom | Colocation IT capacity (maximum rated IT load), Great Britain Modelled estimate, colocation only, excludes enterprise data centres. | 1.6 GW Modelled estimate | autumn 2024 | gov.uk (opens in a new tab) |
| United Kingdom | Colocation IT capacity, London (ITL1) Same DSIT estimate. | 1,048 MW Modelled estimate | autumn 2024 | gov.uk (opens in a new tab) |
| United Kingdom | Demand connection applications in GB queue Up from 41 GW in under a year, all demand types, largely data centres. | 125 GW Official source | mid 2025 | ofgem.gov.uk (opens in a new tab) |
| United States | Data centre electricity consumption About 4.4% of total US electricity. | 176 TWh Official source | 2023 | energy.gov (opens in a new tab) |
| United States | Projected data centre electricity consumption (range) Range of 325 to 580 TWh, 6.7% to 12% of US electricity. Projection. | 325 to 580 TWh Modelled estimate | 2028 | energy.gov (opens in a new tab) |
Indicators come from different publishers and methods. Do not compare them across countries without reading each note.
Capacity in tracked public coverage
Tracked public coverage, not a national total. Sums of reported, project-level figures from 9 of the 122 published project records we track for all published project records. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.
| Metric | Delivery class | Sum of tracked records | Contributing records |
|---|---|---|---|
| Investment | Reported project investment Project-level investment in one currency. Components of a total are not added again. Company-wide programmes are excluded. | USD 92 million |
|
| IT power | Provisional capacity allocation Capacity provisionally allocated by an authority. This is not planning permission and not built capacity. | 200 MW | |
| IT power | Announced or design capacity (not delivered) Ultimate, design or announced capacity. Not delivered capacity. Never added to confirmed figures. | at least 420 MW Includes a lower-bound figure, so the sum is a minimum. |
|
| IT power | Delayed or on hold (current stage) Projects currently delayed or on hold, with the capacity they were reported to deliver. | 52 MW | |
| Total facility power | Announced or design capacity (not delivered) Ultimate, design or announced capacity. Not delivered capacity. Never added to confirmed figures. | 1,200 MW |
Figures not counted (136) and why
- Abilene AI campus at Lancium Clean Campus (Stargate Abilene, Texas)
- Floor or land area about 4,000,000 sq ft: Area figures describe different things (site, floor or data hall area). Shown per record, never summed.
- Abilene AI campus phase 1 (two buildings)
- Total facility power at least 200 MW: Marked not summable by research: Phase power capacity, lower bound ("200+"). Parent campus figure includes this phase, so not eligible for roll-up.
- Africa Data Centres Egypt (Vodafone Business, Elsewedy Electric, Cassava Technologies)
- Other 20 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other up to 200 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- AirTrunk JHB1 (Johor Bahru)
- Floor or land area 21,900 sq m: Area figures describe different things (site, floor or data hall area). Shown per record, never summed.
- AirTrunk JHB2 (Iskandar Puteri, Johor)
- Investment at least MYR 9.7 billion: Scope is company, not one physical project. Not attributable to this asset.
- Amazon Falls Township innovation campus (Bucks County, Pennsylvania)
- Investment at least USD 20 billion: Marked not summable by research: Statewide programme in USD billions, lower bound, not this site alone
- Aruba Hyper Cloud Data Center campus (Tecnopolo Tiburtino, Rome)
- IT power 30 MW: Marked not summable by research: IT power at full build of five data centres
- Atman WAW-3 data centre campus (Warsaw)
- IT power 14.4 MW: Marked not summable by research: IT power of the first facility
- AWS data centre complexes (Madison County, Mississippi)
- Investment USD 10 billion: Marked not summable by research: Planned investment in USD billions
- AWS data centre land option at Tnuvot (near Netanya)
- Other 35 to 40 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- AWS Europe (Milan) Region expansion (investment programme)
- Investment at least EUR 1.2 billion: Marked not summable by research: EUR billions over five years, lower bound
- AWS Europe (Spain) Region data centres in Aragón (investment programme)
- Investment EUR 33.7 billion: Marked not summable by research: Total planned investment in EUR billions, including EUR 15.7 billion announced in 2024
- AWS innovation campus (Richmond County, North Carolina)
- Investment USD 10 billion: Marked not summable by research: Planned investment in USD billions
- AWS Middle East (Saudi Arabia) Region data centres
- Investment at least USD 5.3 billion: Marked not summable by research: Planned investment in USD billions, lower bound
- AWS Project Rainier campus (New Carlisle, Indiana)
- Investment USD 11 billion: Marked not summable by research: Planned investment in USD billions
- Bell AI data centre with Thompson Rivers University (Kamloops)
- Other 26 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Bell AI Fabric and Groq inference facility (Kamloops, British Columbia)
- Other 7 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Brookfield AI data centre campus (Strängnäs)
- Other 750 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment up to SEK 95 billion: Upper bound only ("up to"). Not added to totals.
- Campus IA (Fouju, Seine-et-Marne)
- Grid connection 240 MW: Marked not summable by research: Grid connection power from RTE, first step
- Grid connection 700 MW: Marked not summable by research: Grid connection power from RTE, second step as stated (not added to the first)
- Culham AI Growth Zone data centre (Oxfordshire)
- Other about 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other up to 500 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Data4 and Brookfield e-Valley AI campus (Cambrai, former Air Base 103)
- Other at least 300 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other up to 1,000 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment about EUR 10 billion: Marked not summable by research: EUR billions over five to ten years as described in June 2026
- Data4 MIL02 campus (Vittuone, Milan)
- Other 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 15 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment EUR 500 million: Marked not summable by research: Investment in EUR millions
- Data4 Warsaw campus (Jawczyce, Ożarów Mazowiecki)
- Other 10 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- IT power up to 60 MW: Upper bound only ("up to"). Not added to totals.
- DataVita and CoreWeave Lanarkshire AI Growth Zone (Airdrie)
- Other at least 500 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- DataVolt Oxagon AI data centre campus (NEOM)
- Other 1.5 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- DataVolt Oxagon phase 1 (360 MW, incl. 100 MW with HUMAIN)
- Other 360 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Drax Power Station data centre campus (North Yorkshire)
- Other up to 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other up to 500 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment at least GBP 20 billion: Modelled estimate. Totals use reported figures only.
- Investment GBP 2.5 billion: Marked not summable by research: Initial phase backing in GBP millions, part of the total above (not additional)
- Echelon DUB20 data centre (Arklow, Co Wicklow)
- Investment EUR 4.2 billion: Marked not summable by research: EUR billions across DUB20 and DUB30 together
- EcoDataCenter 2 campus (Kvarnsveden, Borlänge)
- Grid connection 250 MW: Marked not summable by research: Power access at launch
- Grid connection up to 600 MW: Upper bound only ("up to"). Not added to totals.
- Equinix DB7x (Blanchardstown, Dublin)
- Floor or land area 1,322 sq m: Area figures describe different things (site, floor or data hall area). Shown per record, never summed.
- Investment USD 78 million: Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.
- Investment USD 14 million: Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.
- Equinix LG3 (Lagos)
- Investment USD 22 million: Marked not summable by research: USD millions
- Eshkol data centre site (north of Ashdod Port)
- Total facility power up to 250 MW: Upper bound only ("up to"). Not added to totals.
- Investment USD 4.5 billion: Marked not summable by research: Investment in USD billions as reported, up from 1.5
- Google AI hub (Visakhapatnam)
- Investment about USD 15 billion: Marked not summable by research: USD billions over 2026 to 2030
- Google Cloud and PIF AI hub (Dammam region expansion)
- Investment USD 10 billion: Marked not summable by research: Partnership value in USD billions, not data centre capex alone
- Google Dietzenbach data centre (Hesse)
- Investment EUR 5.5 billion: Scope is company, not one physical project. Not attributable to this asset.
- Google Dorchester County data centre sites (South Carolina)
- Investment USD 9 billion: Marked not summable by research: USD billions through 2027, statewide
- Google Eemshaven data centre campus (Groningen)
- Investment EUR 600 million: Marked not summable by research: Initial investment in EUR millions announced in 2014
- Google Elmina data centre (Selangor)
- Investment USD 2 billion: Scope is company, not one physical project. Not attributable to this asset.
- Google Farciennes data centre campus (Hainaut)
- Investment USD 1 billion: Marked not summable by research: Investment in USD billions as reported
- Google Fredericia data centre (Jutland)
- Investment EUR 600 million: Marked not summable by research: Investment in EUR millions
- Google Grange Castle data centre extension (phase 3, Dublin)
- Floor or land area 72,400 sq m: Area figures describe different things (site, floor or data hall area). Shown per record, never summed.
- Google Groningen Westpoort data centre (fourth Dutch site)
- Investment at least EUR 600 million: Marked not summable by research: Investment in EUR millions, lower bound
- Google Hamina data centre campus
- Investment EUR 1 billion: Marked not summable by research: Expansion investment in EUR billions announced May 2024
- Google Middenmeer data centre
- Investment EUR 500 million: Marked not summable by research: Cumulative investment in EUR millions, date not stated
- Google Saint-Ghislain data centre campus
- Investment EUR 5 billion: Marked not summable by research: EUR billions over 2026 and 2027
- Google Skien data centre (Gromstul, Telemark)
- Grid connection 240 MW: Marked not summable by research: Power allocated for phase one. Not IT load
- Investment EUR 600 million: Marked not summable by research: Investment in EUR millions
- Google Stillwater data centre campus (Oklahoma)
- Investment USD 9 billion: Marked not summable by research: USD billions over two years, statewide
- Google Waltham Cross data centre (Hertfordshire)
- Investment GBP 5 billion: Scope is company, not one physical project. Not attributable to this asset.
- Google West Memphis data centre (Crittenden County, Arkansas)
- Investment USD 4 billion: Marked not summable by research: USD billions through 2027, state programme
- Investment about USD 600 million: Scope is programme, not one physical project. Not attributable to this asset.
- Google Winschoten data centre (third Dutch site)
- Investment EUR 600 million: Marked not summable by research: Investment in EUR millions, 2024
- iXAfrica NBOX1 campus (Nairobi)
- IT power 4.5 MW: Marked not summable by research: IT power of NBOX1.1, live
- IT power 22.5 MW: Marked not summable by research: Campus IT power at full build
- Kasi LOS1 data centre (Lagos)
- Other 32 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Khazna and Benya data centre (Maadi Technology Park, Cairo)
- IT power 25 MW: Marked not summable by research: Planned IT load
- Investment USD 250 million: Marked not summable by research: Total investment in USD millions
- Khazna AUH4 data centre (Mafraq, Abu Dhabi)
- Other 60 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Khazna AUH8 data centre (Masdar City, Abu Dhabi)
- Other 30 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment USD 300 million: Marked not summable by research: Project budget in USD millions as reported
- Khazna QAJ1 AI data centre (Ajman)
- Other 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Lambda AI factory (Kansas City, Missouri)
- Other 24 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other at least 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Meta data centre campus (Talavera de la Reina)
- Investment EUR 750 million: Marked not summable by research: Planned private investment in EUR millions
- Meta Odense data centre (Funen)
- Investment at least DKK 10 billion: Marked not summable by research: Cumulative investment in DKK billions, lower bound
- Meta Richland Parish data center (Hyperion, Louisiana)
- Other 5 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment at least USD 50 billion: Marked not summable by research: USD billions, lower bound, regional investment by Meta. Period not stated.
- Meta Rosemount data center (Minnesota)
- Investment at least USD 800 million: Marked not summable by research: Investment in USD millions, lower bound
- Meta Zeewolde data centre (cancelled)
- Other 200 MW: Project cancelled.
- Microsoft and G42 geothermal data centre (Olkaria)
- Other 100 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 1 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Microsoft Austria cloud region data centres (Schwechat, Achau, Vösendorf area)
- Investment EUR 1 billion: Marked not summable by research: Investment in EUR billions as reported by Kurier
- Microsoft Canada Central and Canada East region expansion
- Investment CAD 19 billion: Marked not summable by research: CAD billions over 2023 to 2027, covers more than data centres
- Microsoft data centre campuses in Aragón (La Muela, Villamayor de Gállego, Zaragoza)
- Investment at least EUR 5.3 billion: Marked not summable by research: Investment in EUR millions, lower bound
- Microsoft Fairwater 1 (Mount Pleasant, Wisconsin)
- Floor or land area 1,200,000 sq ft: Area figures describe different things (site, floor or data hall area). Shown per record, never summed.
- Microsoft Mount Pleasant campus (Fairwater, Wisconsin)
- Investment USD 4.7 billion: Modelled estimate. Totals use reported figures only.
- Microsoft Poland data centre expansion (Poland Central region)
- Investment about PLN 3 billion: Marked not summable by research: Almost PLN 3 billion
- Microsoft Rhenish mining area data centre cluster (Bergheim, Bedburg, Elsdorf)
- Investment EUR 3.2 billion: Scope is company, not one physical project. Not attributable to this asset.
- Microsoft South Africa cloud and AI infrastructure expansion
- Investment ZAR 5.4 billion: Marked not summable by research: ZAR billions by end of 2027
- Microsoft Sweden Central data centres (Gävle, Sandviken, Staffanstorp)
- Investment SEK 33.7 billion: Marked not summable by research: SEK billions over two years, covers more than the data centres
- Mistral AI compute cluster at Eclairion (Bruyères-le-Châtel, Essonne)
- Other 44 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Nebius and DataOne AI data centre (Vineland, New Jersey)
- Other up to 300 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Nebius Mäntsälä data centre (first site)
- Other 75 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Nebius second Mäntsälä data centre
- Other up to 70 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Grid connection 70 MW: Marked not summable by research: Substation rating
- NED Netanya I data centre
- IT power 10.5 MW: Marked not summable by research: IT power, first phase
- NEXTDC S7 data centre (Eastern Creek, Sydney)
- Other 612 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Nscale Loughton AI data centre (Essex)
- Grid connection up to 90 MW: Upper bound only ("up to"). Not added to totals.
- OADC LOS1 (Lagos)
- Other 24 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 6 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- ODATA QR03 (Querétaro)
- IT power 72 MW: Marked not summable by research: IT power of the first building
- IT power up to 300 MW: Upper bound only ("up to"). Not added to totals.
- Other 200 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Omnia data centre at the Pecém complex (Caucaia, Ceará)
- Other 300 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- QTS Cambois data centre campus (Blyth, Northumberland)
- Investment GBP 10 billion: Marked not summable by research: Headline development value for the whole campus as reported. Period not stated.
- Floor or land area at least 540,000 sq m: Area figures describe different things (site, floor or data hall area). Shown per record, never summed.
- QTS Proyecto Rhodes data centre campus (Calatorao, Zaragoza)
- Investment up to EUR 13.47 billion: Upper bound only ("up to"). Not added to totals.
- Total facility power 650 MW: Marked not summable by research: Planned electrical capacity of the first phase as reported. Not IT load
- Rack Centre LGS2 (Lagos)
- Other 12 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Scala AI City (Eldorado do Sul)
- Other up to 4.75 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 54 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Schwarz Digits AI data centre (Lübbenau, Brandenburg)
- Grid connection about 200 MW: Marked not summable by research: Grid connection capacity as stated by the company
- Investment EUR 11 billion: Marked not summable by research: Investment in EUR billions
- SoftBank AI data centre at the former Sharp Sakai plant (Osaka)
- Other at least 150 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other at least 400 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Stargate campus, Saline Township (Michigan)
- Other at least 1 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Stargate Norway (Kvandal, Narvik)
- Other 230 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 290 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Stargate UAE AI infrastructure cluster (1 GW)
- Other 1 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment USD 30 billion: Marked not summable by research: USD billions as reported by Reuters. Not confirmed by G42 in sources reviewed.
- Stargate UAE first 200 MW
- Other 200 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Syntys (Q Data) data centres hosting Ooredoo sovereign AI cloud
- Other 5 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other 7.5 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Teraco CT2 (Cape Town)
- IT power 50 MW: Marked not summable by research: Critical IT load after expansion
- Teraco JB7 (Isando campus, Ekurhuleni)
- IT power 40 MW: Marked not summable by research: Critical power load (IT) of JB7
- UAE-US AI Campus (Abu Dhabi)
- Other 5 GW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Vantage Data Centers Warsaw campus (WAW1)
- IT power 48 MW: Marked not summable by research: Critical IT at full build
- Vantage DUB11 Profile Park campus (Clondalkin, Dublin)
- Investment EUR 972.2 million: Marked not summable by research: Accumulated cost to end 2025 before impairment, EUR millions. Project described as a €1 billion development.
- xAI Colossus supercomputer (Memphis, Tennessee)
- Grid connection 150 MW: Marked not summable by research: Substation rating for one grid connection. Not total facility load
Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.
Capacity rules in short
- IT power, total facility power, grid connection, thermal duty, storage power and storage energy are separate classes and never added together.
- Announced, permitted, under construction and operating figures are shown separately.
- A campus figure and its phases are never both counted. Leased capacity is one physical asset.
- Figures with an unclear basis are classed "other" and never summed. Cloud regions have no MW figure.
- Company-wide investment and third-party market estimates are not added to project sums.
Full method: methodology and the capacity definitions guide.
Open JSON exports (v1)
Read-only, versioned files of published records with stable ids. Rebuilt on every release, last research import 4 Nov 2026. Field definitions are in the JSON schemas. Please attribute CoolPower Index and link back.
| Dataset | Records | File |
|---|---|---|
| Catalogue of datasets | 12 | /data/v1/index.json |
| Country market profiles | 32 | /data/v1/countries.json |
| Data centre project, campus and phase records with metric claims | 122 | /data/v1/projects.json |
| Operator, hyperscaler and developer profiles | 59 | /data/v1/operators.json |
| Cloud regions (service areas, no MW figures) | 67 | /data/v1/cloud-regions.json |
| Policy records with status, dates and deadlines | 21 | /data/v1/policies.json |
| Technology guides | 10 | /data/v1/technologies.json |
| Guides and checklists | 5 | /data/v1/resources.json |
| Supplier listings with researched evidence where available | 103 | /data/v1/suppliers.json |
| Every published numeric claim with value kind, scale, normalised value, qualification and roll-up eligibility | 178 | /data/v1/claims.json |
| Canonical events: one entry per event with linked entities and its source group | 97 | /data/v1/events.json |
| Corrections and revisions with before and after summaries and sources | 18 | /data/v1/revisions.json |
| Capacity roll-up rows with contributing records and exclusions (tracked public coverage, not national totals) | 5 | /data/v1/totals.json |
| Search index | all public pages | /data/v1/search-index.json |
Breaking changes get a new version path. v1 stays available. Draft records, private booking data and contact details are never exported. Charts and CSV files for global figures (electricity, PUE, rack density, water) are on the statistics hub; company financials are on Markets and Investment.