Vantage Data Centers Warsaw campus (WAW1)
Vantage Data Centers runs a Warsaw campus on 5 hectares with two data centres and 48 MW of critical IT capacity at full build, according to its campus page. The page does not date the figures or say how much is live. Vantage gives 36,000 square metres in two four-storey buildings, an average density of 3.23 kW per square metre and N+1 redundancy across all systems.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 48 MW Official source | IT power Critical IT at full build Source wording: "48mw of critical IT load" | Planned Stage stated in source: Planned | campus date not given, seen 19 Oct 2026 | No. Marked not summable by research: Critical IT at full build | vantage-dc.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Sources (1), last checked 19 Oct 2026
- Warsaw, Poland Data Center Campus (WAW1) (opens in a new tab), Vantage Data Centers, accessed 19 Oct 2026