Market profile
Poland
In Poland the government announced in February 2025 a Microsoft investment of almost PLN 3 billion, and Atman opened its WAW-3 campus with 14.4 MW of IT power in September 2025. Atman expects national IT capacity to exceed 500 MW by 2030.
- Tracked project records
- 4
- Policy records
- 0
- Cloud regions
- 0
- Last checked
- 19 Oct 2026
Overview
Around Warsaw, Vantage Data Centers lists a 48 MW critical IT campus with two data centres, and Data4 opened a second 10 MW building at Jawczyce in April 2026 on a campus planned for up to 60 MW. Data4 says it plans about EUR 600 million of investment in Poland by 2030.
Grid context
No official grid or demand forecast for data centres was found for Poland.
Latest changes
- Project 9 Apr 2026 Data4 Warsaw campus (Jawczyce, Ożarów Mazowiecki)Second data centre inaugurated Related: Data4 Warsaw campus (Jawczyce, Ożarów Mazowiecki). data4group.com (opens in a new tab)
Tracked projects
| Project | Level | Stage | Operator or developer | Latest change |
|---|---|---|---|---|
| Atman WAW-3 data centre campus (Warsaw) | campus | Operating | Atman | not disclosed |
| Data4 Warsaw campus (Jawczyce, Ożarów Mazowiecki) | campus | Operating | Data4 | 9 Apr 2026: Second data centre inaugurated |
| Microsoft Poland data centre expansion (Poland Central region) | project | Announced | Microsoft | not disclosed |
| Vantage Data Centers Warsaw campus (WAW1) | campus | Operating | Vantage Data Centers | not disclosed |
Capacity in tracked public coverage
Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 4 published project records we track for Poland. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.
None of the tracked project records for Poland has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.
Figures not counted (5) and why
- Atman WAW-3 data centre campus (Warsaw)
- IT power 14.4 MW: Marked not summable by research: IT power of the first facility
- Data4 Warsaw campus (Jawczyce, Ożarów Mazowiecki)
- Other 10 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- IT power up to 60 MW: Upper bound only ("up to"). Not added to totals.
- Microsoft Poland data centre expansion (Poland Central region)
- Investment about PLN 3 billion: Marked not summable by research: Almost PLN 3 billion
- Vantage Data Centers Warsaw campus (WAW1)
- IT power 48 MW: Marked not summable by research: Critical IT at full build
Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.
Hyperscaler and AI cloud activity in Poland
4 tracked projects in Poland, of which 1 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Europe, Middle East and Africa (EMEA) region on the hyperscaler and cloud hub.
| Project | Stage | Operator, developer or owner | Hyperscaler or AI tenant | Announced | Expected |
|---|---|---|---|---|---|
| Microsoft Poland data centre expansion (Poland Central region) Masovia | Announced | Microsoft | not stated | 2025-02-17 | 2026 |
Capacity, forecasts and market share: Poland
Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.
Current capacity and pipeline
Operational, under construction and planned capacity: not publicly reported in a source we could check.
Forecasts and scenarios
| Figure | What it measures | Period or as of | Source |
|---|---|---|---|
| more than 500 MW Forecast | IT power Total IT power capacity in Polish data centres expected to more than triple, as stated by the operator Atman (forecast author not named in the release) Source statement (paraphrased): "expected to more than triple, exceeding 500 MW by 2030" | 2030 | Atman (opens in a new tab) Published 18 Sept 2025. Accessed 19 Oct 2026. |
Cloud market share
Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.
Cloud regions in Poland
A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.
No cloud regions recorded.
Policy timeline
No policy records published.
Operators and developers
- Microsoft Hyperscaler, Developer, Occupier
- Atman Colocation owner, Colocation operator
- Vantage Data Centers Colocation owner, Colocation operator, Developer
- Data4 Colocation owner, Colocation operator, Developer
Sources (5), last checked 19 Oct 2026
- Microsoft wybuduje w Polsce centrum danych za 3 mld zł (opens in a new tab), Chancellery of the Prime Minister of Poland (gov.pl), published 17 Feb 2025, accessed 19 Oct 2026
- Atman opens flagship data center WAW-3 (opens in a new tab), Atman, published 18 Sept 2025, accessed 19 Oct 2026
- Warsaw, Poland Data Center Campus (WAW1) (opens in a new tab), Vantage Data Centers, accessed 19 Oct 2026
- Data4 expands in Poland with second data center near Warsaw (opens in a new tab), Data4, published 9 Apr 2026, accessed 19 Oct 2026
- Our Data Center Campus in Poland (opens in a new tab), Data4, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.