Atman WAW-3 data centre campus (Warsaw)

OperatingPolandMasovia

Atman opened WAW-3 in September 2025. The first facility on the campus has 6,324 sq m of data hall space and 14.4 MW of IT power with liquid cooling, and uses technical water in a closed loop. Atman calls it the first stage of a larger campus. Atman says the WAW-3 campus sits on a 5.5 hectare site just outside Warsaw and was designed for AI and cloud workloads.

Reported figures

Reported figures for Atman WAW-3 data centre campus (Warsaw)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
14.4 MW
Official source
IT power
IT power of the first facility
Source wording: "first facility provides 14.4 MW of IT power capacity"
Operating
Stage stated in source: Operating
building
18 Sept 2025
No. Marked not summable by research: IT power of the first facilityatman.pl (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Cooling

Liquid cooling, technical water in a closed-loop system. atman.pl (opens in a new tab)

Sources (1), last checked 19 Oct 2026
  1. Atman opens flagship data center WAW-3 (opens in a new tab), Atman, published 18 Sept 2025, accessed 19 Oct 2026