<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
<title>CoolPower Index: news and the CoolPower Briefing</title>
<link>https://coolpowerindex.com/</link>
<atom:link href="https://coolpowerindex.com/feed.xml" rel="self" type="application/rss+xml" />
<description>Data centre power and cooling news with sourced analysis, and every sent issue of the CoolPower Briefing.</description>
<language>en-gb</language>
<lastBuildDate>Mon, 19 Oct 2026 07:00:00 GMT</lastBuildDate>
<item>
<title>The CoolPower Briefing #1: megawatt CDUs, 800 V DC and the next five events</title>
<link>https://coolpowerindex.com/briefing/issue-1/</link>
<guid isPermaLink="true">https://coolpowerindex.com/briefing/issue-1/</guid>
<pubDate>Mon, 19 Oct 2026 07:00:00 GMT</pubDate>
<category>The CoolPower Briefing</category>
<description>Five power and cooling stories from the last two weeks, three R&amp;D items to watch, and what's new on CoolPower Index.</description>
</item>
<item>
<title>Accelsius upgrades Austin lab for multi-megawatt two-phase liquid cooling tests</title>
<link>https://coolpowerindex.com/news/accelsius-springdale-lab-multi-megawatt-two-phase-testing/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/accelsius-springdale-lab-multi-megawatt-two-phase-testing/</guid>
<pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
<category>CDUs &amp; Direct Liquid Cooling</category>
<description>Accelsius said it has raised the power capacity of its Springdale lab in Austin, Texas, to multi-megawatt levels so it can test its NeuCool two-phase direct-to-chip cooling at megawatt-class rack loads and on warm facility water. It plans to add 18,000 square feet to its lease at the site in January 2027. The company also repeated earlier benchmark claims against single-phase cooling and said a 375 kW-capable multi-rack unit will follow the MR250, with details still to come. The benchmark and energy figures are vendor claims. Original reporting: The Data Center Engineer.</description>
<source url="https://thedatacenterengineer.com/news/accelsius-upgrades-austin-lab-to-multi-megawatt-two-phase-liquid-cooling-testing/">thedatacenterengineer.com</source>
</item>
<item>
<title>Clivet unveils magnetic-bearing centrifugal compressor and liquid cooling architecture for AI data centres</title>
<link>https://coolpowerindex.com/news/clivet-magnetic-bearing-compressor-ocp-2026/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/clivet-magnetic-bearing-compressor-ocp-2026/</guid>
<pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
<category>Chillers &amp; Precision Cooling</category>
<description>Clivet, a Midea Group brand, used OCP Global Summit 2026 to present a dual-shaft magnetic-bearing centrifugal compressor together with a liquid cooling architecture aimed at AI data centres. The company's own release claims up to 40% lower compressor power at the same cooling capacity. That figure is a manufacturer claim and the release does not state the rating conditions behind it. Original reporting: PR Newswire APAC.</description>
<source url="https://en.prnasia.com/releases/global/breakthrough-cooling-solutions-for-the-ai-computing-surge-clivet-showcases-next-gen-magnetic-bearing-centrifugal-compressor-at-ocp-global-summit-551971.shtml">en.prnasia.com</source>
</item>
<item>
<title>Cooler Master unveils 2,500 kW liquid-to-liquid in-row CDU</title>
<link>https://coolpowerindex.com/news/cooler-master-2500kw-in-row-cdu/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/cooler-master-2500kw-in-row-cdu/</guid>
<pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
<category>CDUs &amp; Direct Liquid Cooling</category>
<description>Cooler Master showed a liquid-to-liquid in-row coolant distribution unit rated at 2,500 kW at OCP Global Summit 2026. The reported specification includes a 990 GPM flow rating and networking of up to 32 CDUs, with mass production targeted for Q4 2026. Original reporting: Data Centre Magazine.</description>
<source url="https://datacentremagazine.com/news/cooler-master-unveils-2-500kw-cdu-for-ai-data-centres">datacentremagazine.com</source>
</item>
<item>
<title>NiSource signs 20-year deal to serve Microsoft's Indiana campus with about 1,100 MW of new generation and 600 MW of contracted battery storage</title>
<link>https://coolpowerindex.com/news/nisource-microsoft-indiana-1100mw-generation-600mw-storage/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/nisource-microsoft-indiana-1100mw-generation-600mw-storage/</guid>
<pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
<category>BESS &amp; Energy Storage</category>
<description>NiSource announced a 20-year energy agreement with Microsoft for Microsoft's previously announced northwest Indiana data centre campus, with service expected to start in 2028. NiSource's generation company will add about 1,100 MW of new generation resources, and Microsoft funds the generation and transmission needed to serve its load. In connection with the deal, the generation company has contracted 600 MW of battery storage under a long-term tolling agreement, to be built by an AGP Group affiliate. NiSource says the structure raises expected savings for existing NIPSCO electric customers to about 1.75 billion USD over the life of its data centre contracts. That savings figure is the utility's own estimate. Original reporting: NiSource (Business Wire).</description>
<source url="https://investors.nisource.com/financial-news/news-details/2026/NiSource-announces-long-term-agreement-with-Microsoft-expected-to-increase-customer-savings-and-support-Indianas-economic-growth/default.aspx">investors.nisource.com</source>
</item>
<item>
<title>Nscale's Glomfjord AI data centre reported six months late after cooling leaks and a transformer fire</title>
<link>https://coolpowerindex.com/news/nscale-glomfjord-delay-cooling-leaks-transformer-fire/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/nscale-glomfjord-delay-cooling-leaks-transformer-fire/</guid>
<pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate>
<category>Switchgear &amp; Transformers</category>
<description>DCD, citing Bloomberg, reported on 16 October 2026 that Nscale's Glomfjord data centre in Norway is running about six months behind schedule, with construction delays, local regulations, leaks in the cooling system and a transformer fire among the reported hurdles. DCD later added an account from a source familiar with the project: the transformer fire was in December 2025 and destroyed switchgear, temporary generators kept the cooling running, the leak was fixed within weeks and the cooling system was completed more than three months ago. That source accepted there was an overall delay. DCD reports 6.4 MW of a planned 30 MW is operating. Nscale had not commented to DCD at the time of publication. Original reporting: DCD.</description>
<source url="https://www.datacenterdynamics.com/en/news/nscales-glomfjord-data-center-delayed-site-suffers-leaks-in-cooling-system-and-a-fire/">www.datacenterdynamics.com</source>
</item>
<item>
<title>Venture Global signs framework with GE Vernova and Baker Hughes for up to 16 power islands</title>
<link>https://coolpowerindex.com/news/venture-global-ge-vernova-baker-hughes-power-islands/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/venture-global-ge-vernova-baker-hughes-power-islands/</guid>
<pubDate>Thu, 15 Oct 2026 00:00:00 GMT</pubDate>
<category>Gensets &amp; On-site Power</category>
<description>Venture Global signed a framework with GE Vernova and Baker Hughes covering up to 16 power islands. According to Baker Hughes, the scope includes gas and steam turbines, E-house and controls for LNG operations and potential adjacent data centres. Deliveries are scheduled between 2028 and 2034, with a first order expected by the end of 2026. Original reporting: Baker Hughes.</description>
<source url="https://investors.bakerhughes.com/news/press-releases/news-details/2026/Baker-Hughes-and-Venture-Global-Expand-Strategic-Long-Term-Power-Generation-Partnership/default.aspx">investors.bakerhughes.com</source>
</item>
<item>
<title>DCX builds coolant chemistry control into its 8 MW facility distribution unit</title>
<link>https://coolpowerindex.com/news/dcx-coolant-chemistry-control-8mw-fdu/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/dcx-coolant-chemistry-control-8mw-fdu/</guid>
<pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate>
<category>CDUs &amp; Direct Liquid Cooling</category>
<description>DCX says it has built coolant chemistry control into its 8 MW facility distribution unit (FDU) family, using inline sensors and automatic dosing for coolant treatment. Original reporting: DCX.</description>
<source url="https://www.dcx.eu/blog/first-cdu-with-built-in-coolant-quality-control-and-treatment">www.dcx.eu</source>
</item>
<item>
<title>Flex completes acquisition of EPC Power</title>
<link>https://coolpowerindex.com/news/flex-completes-epc-power-acquisition/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/flex-completes-epc-power-acquisition/</guid>
<pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate>
<category>UPS &amp; Power Distribution</category>
<description>Flex completed its acquisition of EPC Power. EPC Power now sits in Flex's Cloud and Power Infrastructure segment and brings grid-forming and 800V data centre power conversion technology. Original reporting: Flex.</description>
<source url="https://investors.flex.com/news/news-details/2026/Flex-Completes-Acquisition-of-EPC-Power-Expanding-Power-Conversion-Capabilities-for-AI-Data-Centers-and-Grid-Applications/default.aspx">investors.flex.com</source>
</item>
<item>
<title>LS Electric wins $138.5m order to supply switchgear for Bloom Energy fuel cells at a Pennsylvania data centre</title>
<link>https://coolpowerindex.com/news/ls-electric-switchgear-bloom-energy-pennsylvania/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/ls-electric-switchgear-bloom-energy-pennsylvania/</guid>
<pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate>
<category>Switchgear &amp; Transformers</category>
<description>LS Electric won an order reported at $138.5m to supply switchgear for Bloom Energy fuel cells at a data centre in Pennsylvania. The scope covers 38kV switchgear and distribution transformers, with deliveries expected between April and July 2027. Original reporting: DCD.</description>
<source url="https://www.datacenterdynamics.com/en/news/ls-electric-secures-138m-order-to-supply-switchgear-for-bloom-fuel-cells-at-pennsylvania-data-center/">www.datacenterdynamics.com</source>
</item>
<item>
<title>Nidec unveils NIR3.0 prototype: 3.2 MW, 800 VDC-compatible in-row CDU</title>
<link>https://coolpowerindex.com/news/nidec-nir3-prototype-800vdc-cdu/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/nidec-nir3-prototype-800vdc-cdu/</guid>
<pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate>
<category>CDUs &amp; Direct Liquid Cooling</category>
<description>Nidec presented the NIR3.0, a prototype in-row CDU rated at 3.2 MW and described as compatible with 800 VDC power. It was shown at OCP Global Summit 2026 and Nidec targets mass production in the first half of 2027. Original reporting: Nidec.</description>
<source url="https://www.nidec.com/files/user/www-nidec-com/corporate/news/2026/1014-02/261014-02en.pdf">www.nidec.com</source>
</item>
<item>
<title>Endure Critical Solutions acquires Precise Power's UPS services division</title>
<link>https://coolpowerindex.com/news/endure-acquires-precise-power-ups-services/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/endure-acquires-precise-power-ups-services/</guid>
<pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate>
<category>UPS &amp; Power Distribution</category>
<description>Endure Critical Solutions acquired the UPS services division of Precise Power. The deal expands its vendor-neutral UPS and battery service coverage in the US Southeast for data centres and other critical facilities. Original reporting: PR Newswire.</description>
<source url="https://www.prnewswire.com/news-releases/endure-critical-solutions-expands-southeast-ups-and-battery-service-capacity-with-precise-power-302907237.html">www.prnewswire.com</source>
</item>
<item>
<title>Schneider Electric launches Motivair WCDU combining liquid and air cooling</title>
<link>https://coolpowerindex.com/news/schneider-motivair-wcdu-hybrid-cooling/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/schneider-motivair-wcdu-hybrid-cooling/</guid>
<pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate>
<category>CDUs &amp; Direct Liquid Cooling</category>
<description>Schneider Electric launched the Motivair WCDU, a coolant distribution unit designed to work with fan walls in halls that combine liquid and air cooling for AI workloads. Original reporting: ClubIT&amp;C.</description>
<source url="https://www.clubitc.eu/2026/10/13/schneider-electric-launches-new-motivair-coolant-distribution-unit-integrating-liquid-and-air-cooling-for-more-flexible-data-center-deployments/">www.clubitc.eu</source>
</item>
<item>
<title>Trane launches LiquidStack CDU 2.X for AI data centres</title>
<link>https://coolpowerindex.com/news/trane-liquidstack-cdu-2x/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/trane-liquidstack-cdu-2x/</guid>
<pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate>
<category>CDUs &amp; Direct Liquid Cooling</category>
<description>Trane launched the LiquidStack CDU 2.X for AI data centres. Trane gives a flow capability of up to 3,750 litres per minute at 3.5 bar and facility inlet temperatures up to 45 °C. Neither the launch report nor Trane's release states a thermal capacity in MW. Pre-orders are open and shipments are expected from Q2 2027. Original reporting: datacenter.news.</description>
<source url="https://datacenter.news/story/trane-launches-liquidstack-cdu-2-x-for-ai-data-centres">datacenter.news</source>
</item>
<item>
<title>nVent completes $1.75bn acquisition of Maverick Power</title>
<link>https://coolpowerindex.com/news/nvent-completes-maverick-power-acquisition/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/nvent-completes-maverick-power-acquisition/</guid>
<pubDate>Thu, 01 Oct 2026 00:00:00 GMT</pubDate>
<category>UPS &amp; Power Distribution</category>
<description>nVent completed its acquisition of Maverick Power, reported at $1.75bn. The deal adds an engineered power distribution platform for data centres to nVent's portfolio. Original reporting: nVent.</description>
<source url="https://investors.nvent.com/press-releases/press-release-details/2026/nVent-Completes-Acquisition-of-Maverick-Power/default.aspx">investors.nvent.com</source>
</item>
<item>
<title>Flex to acquire EPC Power for $4.4bn</title>
<link>https://coolpowerindex.com/news/flex-to-acquire-epc-power/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/flex-to-acquire-epc-power/</guid>
<pubDate>Thu, 03 Sep 2026 00:00:00 GMT</pubDate>
<category>UPS &amp; Power Distribution</category>
<description>Flex announced an agreement to acquire EPC Power for a reported $4.4bn. EPC Power makes power conversion equipment for 800V data centre architectures and grid applications. Completion was later announced in October 2026. Original reporting: Flex.</description>
<source url="https://investors.flex.com/news/news-details/2026/Flex-to-Acquire-EPC-Power-Adding-Leading-Power-Conversion-Capabilities-for-AI-Data-Centers-and-Grid-Applications/default.aspx">investors.flex.com</source>
</item>
<item>
<title>Vertiv agrees to acquire UtilityInnovation Group (~$1.45bn)</title>
<link>https://coolpowerindex.com/news/vertiv-to-acquire-utilityinnovation-group/</link>
<guid isPermaLink="true">https://coolpowerindex.com/news/vertiv-to-acquire-utilityinnovation-group/</guid>
<pubDate>Wed, 02 Sep 2026 00:00:00 GMT</pubDate>
<category>Gensets &amp; On-site Power</category>
<description>Vertiv agreed to acquire UtilityInnovation Group for about $1.45bn. UtilityInnovation Group works on microgrid controls, on-site generation and storage orchestration for AI data centres. Original reporting: Vertiv.</description>
<source url="https://www.vertiv.com/en-us/about/news-and-events/corporate-news/2026/vertiv-announces-agreement-to-acquire-utilityinnovation-group-to-accelerate-time-to-power-for-ai-data-centers/">www.vertiv.com</source>
</item>
</channel>
</rss>
