Project record, campus

Khazna AUH4 data centre (Mafraq, Abu Dhabi)

Under constructionUnited Arab EmiratesAbu Dhabi

Khazna announced in April 2025 two Abu Dhabi data centres, AUH4 in Mafraq and AUH8 in Masdar City, with 60 MW combined. AUH4 was due in December 2026. A per-site MW figure for AUH4 is not given in the Khazna release. Khazna said it is using a modular design architecture for AUH4 and AUH8 to improve efficiency during the build, with minimal waste and faster construction timelines.

Reported figures

Reported figures for Khazna AUH4 data centre (Mafraq, Abu Dhabi)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
60 MW
Official source
Otherbasis unclear
AUH4 and AUH8 together. MW basis not stated
Source wording: "a combined 60MW of capacity"
Planned
Stage stated in source: Planned
campus
21 Apr 2025
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.khaznadatacenters.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Sources (1), last checked 19 Oct 2026
  1. Khazna Expands Infrastructure to Accelerate UAE’s Leadership in Artificial Intelligence (opens in a new tab), Khazna Data Centers, published 21 Apr 2025, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.