Khazna announced in April 2025 two Abu Dhabi data centres, AUH4 in Mafraq and AUH8 in Masdar City, with 60 MW combined. AUH4 was due in December 2026. A per-site MW figure for AUH4 is not given in the Khazna release. Khazna said it is using a modular design architecture for AUH4 and AUH8 to improve efficiency during the build, with minimal waste and faster construction timelines.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 60 MW Official source | Otherbasis unclear AUH4 and AUH8 together. MW basis not stated Source wording: "a combined 60MW of capacity" | Planned Stage stated in source: Planned | campus 21 Apr 2025 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | khaznadatacenters.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Sources (1), last checked 19 Oct 2026
- Khazna Expands Infrastructure to Accelerate UAE’s Leadership in Artificial Intelligence (opens in a new tab), Khazna Data Centers, published 21 Apr 2025, accessed 19 Oct 2026