Abilene AI campus at Lancium Clean Campus (Stargate Abilene, Texas)

Under constructionUnited StatesTexas

AI data centre campus designed and built by Crusoe on the Lancium Clean Campus in Abilene, Texas, widely referred to as Stargate Abilene with Oracle and OpenAI as the compute users. Crusoe said in March 2025 that phase two adds six buildings, bringing the campus to eight buildings, about 4 million sq ft and 1.2 GW of total power capacity, with phase two expected to complete in mid 2026. Lancium describes a 1.2 GW grid interconnection plus behind-the-meter battery storage and solar, with natural gas turbines for backup. Cooling is direct-to-chip liquid with a closed-loop, zero-water-evaporation design.

Reported figures

Reported figures for Abilene AI campus at Lancium Clean Campus (Stargate Abilene, Texas)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
1.2 GW
Official source
Total facility power
Total campus power capacity at eight buildings. Crusoe/Lancium describe a 1.2 GW grid interconnection. Not stated as IT load.
Source wording: "total power capacity of 1.2 gigawatts (GW)"
Announced
Stage stated in source: Announced
campus
18 Mar 2025
Yes: Announced or design capacity (not delivered)crusoe.ai (opens in a new tab)
about 4,000,000 sq ft
Official source
Approximate
Floor or land area
Total floor area at eight buildings.
Source wording: "approximately 4 million square feet"
Announced
Stage stated in source: Announced
campus
18 Mar 2025
No. Area figures describe different things (site, floor or data hall area). Shown per record, never summed.crusoe.ai (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Cooling

Direct-to-chip liquid cooling with a closed-loop zero-water-evaporation system. crusoe.ai (opens in a new tab)

Power and grid

1.2 GW grid interconnection plus behind-the-meter battery storage and solar. Natural gas turbines for backup power. crusoe.ai (opens in a new tab)

What changed

  1. 18 Mar 2025 Phase two construction started (six buildings) Related: Abilene AI campus phase 1 (two buildings). crusoe.ai (opens in a new tab)

Notes

Occupier roles (Oracle, OpenAI) are widely reported but are not stated in the cited Crusoe release. Later delivery progress reported by trackers was not verified against a primary source, so stage remains under construction. Grid status contracted reflects Lancium's described interconnection, energisation of later phases not confirmed.

Phases and buildings

Technologies

Sources (1), last checked 18 Oct 2026
  1. Crusoe expands AI data center campus in Abilene to 1.2 gigawatts (opens in a new tab), Crusoe, published 18 Mar 2025, accessed 18 Oct 2026