Project record, campus
Aruba Hyper Cloud Data Center campus (Tecnopolo Tiburtino, Rome)
Aruba inaugurated its Rome data centre campus at the Tecnopolo Tiburtino in October 2024. The campus covers 74,000 square metres and is planned as five data centres with 30 MW of IT power in total at full build. Aruba says power is delivered with 2N or higher redundancy, and that the first building, DC-A, holds ANSI/TIA-942-C Rating 4 Constructed Facility certification.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 30 MW Official source | IT power IT power at full build of five data centres Source wording: "30 MW IT" | Planned Stage stated in source: Planned | campus 2 Oct 2024 | No. Marked not summable by research: IT power at full build of five data centres | aruba.it (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Sources (1), last checked 19 Oct 2026
- Inaugurato il Data Center Campus di Aruba a Roma (opens in a new tab), Aruba, published 2 Oct 2024, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.