Project record, campus
Campus IA (Fouju, Seine-et-Marne)
AI data centre campus planned at Fouju in Seine-et-Marne by Campus IA. RTE signed an accelerated grid connection contract in January 2026 that provides a first step of 240 MW by the end of 2027 and a second step of 700 MW before the end of 2029. RTE says the electrical works are designed to allow growth to 1,400 MW in time, and that this is the first use of its fast-track connection procedure. Campus IA is backed by MGX, Bpifrance, Mistral AI and NVIDIA.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 240 MW Official source | Grid connection Grid connection power from RTE, first step Source wording: "first power step of 240 MW by end 2027" | Planned Stage stated in source: Planned | campus 22 Jan 2026 | No. Marked not summable by research: Grid connection power from RTE, first step | assets.rte-france.com (opens in a new tab) |
| 700 MW Official source | Grid connection Grid connection power from RTE, second step as stated (not added to the first) Source wording: "second step of 700 MW before end 2029" | Planned Stage stated in source: Planned | campus 22 Jan 2026 | No. Marked not summable by research: Grid connection power from RTE, second step as stated (not added to the first) | assets.rte-france.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Power and grid
RTE accelerated connection: 240 MW step by end 2027, 700 MW step before end 2029. assets.rte-france.com (opens in a new tab)
Sources (1), last checked 19 Oct 2026
- Campus IA et RTE: contrat de raccordement accéléré (press release) (opens in a new tab), RTE, published 22 Jan 2026, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.