Culham AI Growth Zone data centre (Oxfordshire)
UKAEA invited expressions of interest in August 2025 from partners to build a mission-led AI data centre at its Culham campus, part of the first UK AI Growth Zone. The invitation describes about 100 MW initially with the potential to grow towards 500 MW. No partner was named in the source checked. UKAEA would first release at least 10 acres of land and its reconfigured power connections.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| about 100 MW Official source Approximate | Otherbasis unclear Initial power, steady state and dual resilient as described. Not stated as IT load Source wording: "approximately 100MW of steady state, dual resilient power" | Planned Stage stated in source: Planned | campus 12 Aug 2025 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | culham.org.uk (opens in a new tab) |
| up to 500 MW Official source Upper bound | Otherbasis unclear Possible later scale, upper bound Source wording: "potentially up to a maximum limit of 500MW" | Planned Stage stated in source: Target | campus 12 Aug 2025 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | culham.org.uk (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Sources (1), last checked 19 Oct 2026