Project record, campus
DataVolt Oxagon AI data centre campus (NEOM)
AI data centre campus planned by Saudi developer DataVolt at Oxagon, NEOM's industrial city on the Red Sea coast, with a planned total of 1.5 GW. Construction of the 360 MW first phase began with a groundbreaking announced on 31 August 2026 at LEAP. DataVolt gives first-phase ready-for-service as 2028.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 1.5 GW Official source | Otherbasis unclear Planned campus total, basis not defined. Source wording: "wider planned 1.5GW Oxagon campus" | Announced Stage stated in source: Announced | campus 31 Aug 2026 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | data-volt.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
What changed
- 31 Aug 2026 Construction started on first phase Related: DataVolt Oxagon phase 1 (360 MW, incl. 100 MW with HUMAIN). data-volt.com (opens in a new tab)
Phases and buildings
- DataVolt Oxagon phase 1 (360 MW, incl. 100 MW with HUMAIN) Under construction
Sources (1), last checked 18 Oct 2026
- HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM (opens in a new tab), DataVolt, published 31 Aug 2026, accessed 18 Oct 2026