DataVolt Oxagon AI data centre campus (NEOM)

Under constructionSaudi ArabiaTabuk Province (NEOM)

AI data centre campus planned by Saudi developer DataVolt at Oxagon, NEOM's industrial city on the Red Sea coast, with a planned total of 1.5 GW. Construction of the 360 MW first phase began with a groundbreaking announced on 31 August 2026 at LEAP. DataVolt gives first-phase ready-for-service as 2028.

Reported figures

Reported figures for DataVolt Oxagon AI data centre campus (NEOM)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
1.5 GW
Official source
Otherbasis unclear
Planned campus total, basis not defined.
Source wording: "wider planned 1.5GW Oxagon campus"
Announced
Stage stated in source: Announced
campus
31 Aug 2026
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.data-volt.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

What changed

  1. 31 Aug 2026 Construction started on first phase Related: DataVolt Oxagon phase 1 (360 MW, incl. 100 MW with HUMAIN). data-volt.com (opens in a new tab)

Phases and buildings

Sources (1), last checked 18 Oct 2026
  1. HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM (opens in a new tab), DataVolt, published 31 Aug 2026, accessed 18 Oct 2026

Last checked 18 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.