Project record, building

Equinix DB7x (Blanchardstown, Dublin)

Under constructionIrelandFingal, Dublin

Equinix began construction of DB7x in Blanchardstown, Dublin, on 20 March 2026, next to two existing Equinix sites. The building covers 1,322 sq m. Equinix states an investment of $78 million in the facility plus $14 million for retail IBX fit-out, with retail capacity due from early 2028. Equinix says the building needs no additional grid power because it uses power already allocated to the existing site, and that it will be 100% flexible to support the national grid.

Reported figures

Reported figures for Equinix DB7x (Blanchardstown, Dublin)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
USD 92 million
Official source
92,000,000 USD
Investment
Total stated by Equinix. Components: USD 78 million facility and USD 14 million retail IBX fit-out.
Source wording: "represents a $92 million investment"
Announced
Stage stated in source: Announced
building
20 Mar 2026
Yes: Reported project investmentnewsroom.equinix.com (opens in a new tab)
1,322 sq m
Official source
Floor or land area
Building area as stated by Equinix.
Source wording: "will cover 1,322m²"
Under construction
Stage stated in source: Under construction
building
20 Mar 2026
No. Area figures describe different things (site, floor or data hall area). Shown per record, never summed.newsroom.equinix.com (opens in a new tab)
USD 78 millioncomponent
Official source
78,000,000 USD
Investment
Facility component of the USD 92 million total.
Source wording: "an investment of $78 million into the new high-performance data center facility"
Announced
Stage stated in source: Announced
building
20 Mar 2026
No. Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.newsroom.equinix.com (opens in a new tab)
USD 14 millioncomponent
Official source
14,000,000 USD
Investment
Retail IBX fit-out component of the USD 92 million total.
Source wording: "an additional $14 million to support a retail IBX buildout"
Announced
Stage stated in source: Announced
building
20 Mar 2026
No. Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.newsroom.equinix.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Power and grid

Uses existing allocated power at the Equinix site, no new grid connection. Described as 100% flexible to support the national grid. newsroom.equinix.com (opens in a new tab)

What changed

  1. 20 Mar 2026 Construction started Related: Equinix. newsroom.equinix.com (opens in a new tab)

Notes

Uses power already allocated to the existing Equinix site, no new grid connection.

Revision history

  1. 18 Oct 2026: Investment figure normalised to USD 92,000,000 (shown as USD 92 million). Equinix states USD 78 million for the facility plus USD 14 million for the retail IBX fit-out. These are kept as components of the total and never added again. Commercial availability corrected from available to scheduled (early 2028). Grid status reworded: the building uses power already allocated to the existing site.
    Before: Investment shown as 92 with the million scale only in the note. Commercial availability shown as available.
    newsroom.equinix.com (opens in a new tab)
Sources (1), last checked 18 Oct 2026
  1. Equinix begins construction on new data center in Dublin (opens in a new tab), Equinix, published 20 Mar 2026, accessed 18 Oct 2026

Last checked 18 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.