AWS data centre land option at Tnuvot (near Netanya)
Globes reported in November 2025 that AWS leased land near Netanya under a letter of intent with Rotshtein Real Estate and partners, where it could build a 60,000 sq m data centre of 35 to 40 MW. AWS can still abandon the land and pay an exit penalty during a five year option period. Globes says AWS had opened a 12 MW data centre on nearby land two years earlier.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 35 to 40 MW Third-party reported Range | Otherbasis unclear Possible capacity if built, MW basis not stated Source wording: "energy capacity of 35-40 megawatts" | Planned Stage stated in source: Announced | campus 13 Nov 2025 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | en.globes.co.il (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Sources (1), last checked 19 Oct 2026