Market profile

Israel

In Israel, Globes reported in November 2025 that AWS leased land near Netanya for a possible 35 to 40 MW data centre that could double its Israeli capacity, probably by 2030. No national capacity figure is published.

Tracked project records
3
Policy records
0
Cloud regions
0
Last checked
19 Oct 2026

Projects in Israel Policy timeline

Overview

North of Ashdod Port, Serverfarm, the IIF fund and Dalia Energy plan a data centre of up to 250 MW of electrical capacity, with investment raised to USD 4.5 billion, while the Electricity Authority suspended new data centre licences for 140 days. In Netanya, NED Data Centers lists Netanya I with 10.5 MW of IT for service in Q4 2026.

Grid context

No public data centre grid or demand figure was found.

Latest changes

  1. Project 25 Aug 2026 Eshkol data centre site (north of Ashdod Port)Dalia Energy takes 50%, licence freeze of 140 days reported Third-party reported Related: Eshkol data centre site (north of Ashdod Port). en.globes.co.il (opens in a new tab)

All changes

Tracked projects

ProjectLevelStageOperator or developerLatest change
AWS data centre land option at Tnuvot (near Netanya)campusAnnouncedAmazon Web Services (AWS)not disclosed
Eshkol data centre site (north of Ashdod Port)campusPlanningServerfarm, Dalia Energy25 Aug 2026: Dalia Energy takes 50%, licence freeze of 140 days reported
NED Netanya I data centrecampusUnder constructionNED Data Centersnot disclosed

Filter all projects by Israel

Capacity in tracked public coverage

Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 3 published project records we track for Israel. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.

None of the tracked project records for Israel has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.

Figures not counted (4) and why

Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.

Hyperscaler and AI cloud activity in Israel

3 tracked projects in Israel, of which 1 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Europe, Middle East and Africa (EMEA) region on the hyperscaler and cloud hub.

Hyperscaler and AI cloud projects in Israel
ProjectStageOperator, developer or ownerHyperscaler or AI tenantAnnouncedExpected
AWS data centre land option at Tnuvot (near Netanya)
Central District
AnnouncedAmazon Web Services (AWS)not statednot statednot stated

Capacity, forecasts and market share: Israel

Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.

Current capacity and pipeline

Operational, under construction and planned capacity: not publicly reported in a source we could check.

Forecasts and scenarios

Forecast: not publicly reported by a named publisher in a source we could check.

Cloud market share

Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.

No figures to download yet. All market figures (CSV)

Cloud regions in Israel

A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.

No cloud regions recorded.

Policy timeline

No policy records published.

Operators and developers

Sources (3), last checked 19 Oct 2026
  1. AWS to double data center capacity in Israel (opens in a new tab), Globes, published 13 Nov 2025, accessed 19 Oct 2026
  2. Dalia Energy ups stake in Ashdod data center to 50% (opens in a new tab), Globes, published 25 Aug 2026, accessed 19 Oct 2026
  3. Project Netanya I (opens in a new tab), NED Data Centers, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.