NED Netanya I data centre

Under constructionIsraelCentral District

NED Data Centers lists Netanya I with 16 MVA of a planned 60 MVA in the first phase, 10.5 MW of IT and ready for service in Q4 2026. NED lists 3,600 square metres of white space, a floor load of 1,500 kg per square metre, direct liquid cooling with dedicated piping for CDUs and a backup utility feed of 16 MVA. It describes a fortified underground facility 400 m from an IEC substation, about 20 km from Tel Aviv, with 72 hours of autonomous operation and a LEED Gold target.

Reported figures

Reported figures for NED Netanya I data centre
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
10.5 MW
Official source
IT power
IT power, first phase
Source wording: "10.5 MW IT"
Planned
Stage stated in source: Under construction
campus
date not given, seen 19 Oct 2026
No. Marked not summable by research: IT power, first phasened-dc.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Sources (1), last checked 19 Oct 2026
  1. Project Netanya I (opens in a new tab), NED Data Centers, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.