{"api_version":"v1","schema_version":"1.1","dataset":"projects","title":"Data centre project, campus and phase records with metric claims","generated":"2026-10-18","research_imported":"2026-10-18","licence":"Editorial summaries and structured fields by CoolPower Index. Reuse with attribution and a link. Source documents remain the property of their publishers.","coverage":"Published records only. Draft records, private booking data and contacts are never included. Capacity figures are tracked public coverage, not national totals.","schema":"https://coolpowerindex.com/data/v1/schema/","count":27,"records":[{"id":"us-abilene-lancium-clean-campus","status":"published","name":"Abilene AI campus at Lancium Clean Campus (Stargate Abilene, Texas)","aliases":["Stargate Abilene"],"level":"campus","country_id":"united-states","state_region":"Texas","developer_ids":["crusoe","lancium"],"operator_ids":["crusoe"],"occupier_ids":["oracle","openai"],"stage":"under-construction","grid_status":"contracted","summary":"AI data centre campus designed and built by Crusoe on the Lancium Clean Campus in Abilene, Texas, widely referred to as Stargate Abilene with Oracle and OpenAI as the compute users. Crusoe said in March 2025 that phase two adds six buildings, bringing the campus to eight buildings, about 4 million sq ft and 1.2 GW of total power capacity, with phase two expected to complete in mid 2026. Lancium describes a 1.2 GW grid interconnection plus behind-the-meter battery storage and solar, with natural gas turbines for backup. Cooling is direct-to-chip liquid with a closed-loop, zero-water-evaporation design.","expected_operating_date":{"value":"2026","confidence":"announced","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts"},"metric_claims":[{"value":1.2,"unit":"GW","original_wording":"total power capacity of 1.2 gigawatts (GW)","metric_class":"total-facility-power","stage":"announced","scope":"campus","as_of":"2025-03-18","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","claim_type":"reported","aggregation_eligible":true,"basis":"Total campus power capacity at eight buildings. Crusoe/Lancium describe a 1.2 GW grid interconnection. Not stated as IT load.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"},{"value":4000000,"unit":"sqft","original_wording":"approximately 4 million square feet","metric_class":"area","stage":"announced","scope":"campus","as_of":"2025-03-18","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","claim_type":"reported","aggregation_eligible":true,"basis":"Total floor area at eight buildings.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"cooling_architecture":{"summary":"Direct-to-chip liquid cooling with a closed-loop zero-water-evaporation system.","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts"},"power_architecture":{"summary":"1.2 GW grid interconnection plus behind-the-meter battery storage and solar. Natural gas turbines for backup power.","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts"},"latest_change":{"date":"2025-03-18","summary":"Phase two construction started (six buildings)","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts"},"notes":"Occupier roles (Oracle, OpenAI) are widely reported but are not stated in the cited Crusoe release. Later delivery progress reported by trackers was not verified against a primary source, so stage remains under construction. Grid status contracted reflects Lancium's described interconnection, energisation of later phases not confirmed.","technology_ids":["direct-liquid-cooling"],"sources":[{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","title":"Crusoe expands AI data center campus in Abilene to 1.2 gigawatts","publisher":"Crusoe","date_published":"2025-03-18","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"owner_ids":[],"investor_ids":[],"policy_ids":[],"cloud_region_ids":[],"country_ids":["united-states"],"provenance":{"stage":{"source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","as_of":"2025-03-18","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"us-abilene-lancium-clean-campus--total-facility-power-1","record_id":"us-abilene-lancium-clean-campus","record_type":"project","metric":"total-facility-power","label":null,"metric_class":"total-facility-power","metric_type":"power","value_kind":"exact","value":1.2,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"total power capacity of 1.2 gigawatts (GW)","scope":"campus","geography":null,"period":null,"asset_id":"us-abilene-lancium-clean-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-03-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","source_publisher":"Crusoe","source_published":"2025-03-18","last_checked":"2026-10-18","interpretation":"Total campus power capacity at eight buildings. Crusoe/Lancium describe a 1.2 GW grid interconnection. Not stated as IT load.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1200,"min":null,"max":null,"unit":"MW"},"rollup_class":"announced-design","rollup_eligible":true,"exclusion_reason":null,"display_value":"1.2 GW"},{"claim_id":"us-abilene-lancium-clean-campus--area-2","record_id":"us-abilene-lancium-clean-campus","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"approximate","value":4000000,"value_min":null,"value_max":null,"unit":"sqft","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"approximately 4 million square feet","scope":"campus","geography":null,"period":null,"asset_id":"us-abilene-lancium-clean-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-03-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","source_publisher":"Crusoe","source_published":"2025-03-18","last_checked":"2026-10-18","interpretation":"Total floor area at eight buildings.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":4000000,"min":null,"max":null,"unit":"sqft"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"about 4,000,000 sq ft"}],"dates":{"published":"2025-03-18","effective":null,"event":"2025-03-18","expected_operation":"2026","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/us-abilene-lancium-clean-campus/"},{"id":"us-abilene-phase-1","status":"published","name":"Abilene AI campus phase 1 (two buildings)","level":"phase","parent_id":"us-abilene-lancium-clean-campus","country_id":"united-states","state_region":"Texas","developer_ids":["crusoe"],"operator_ids":["crusoe"],"stage":"under-construction","summary":"Initial phase of the Crusoe-built Abilene campus: two buildings totalling 980,000 sq ft and more than 200 MW, construction started June 2024 and energisation expected in the first half of 2025 (Crusoe, March 2025). Each building is designed for up to 50,000 NVIDIA GB200 NVL72 on a single network fabric. Operating status after energisation is not confirmed in a primary source reviewed here, so stage stays under construction.","expected_operating_date":{"value":"2025-H1","confidence":"announced","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts"},"metric_claims":[{"value":200,"unit":"MW","original_wording":"two buildings at 980,000 square feet and 200+ megawatts","metric_class":"total-facility-power","stage":"under-construction","scope":"phase","as_of":"2025-03-18","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","claim_type":"reported","aggregation_eligible":false,"basis":"Phase power capacity, lower bound (\"200+\"). Parent campus figure includes this phase, so not eligible for roll-up.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"latest_change":{"date":"2025-03-18","summary":"Energisation expected H1 2025","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts"},"sources":[{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","title":"Crusoe expands AI data center campus in Abilene to 1.2 gigawatts","publisher":"Crusoe","date_published":"2025-03-18","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-states"],"provenance":{"stage":{"source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","as_of":"2025-03-18","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"us-abilene-phase-1--total-facility-power-1","record_id":"us-abilene-phase-1","record_type":"project","metric":"total-facility-power","label":null,"metric_class":"total-facility-power","metric_type":"power","value_kind":"lower_bound","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"two buildings at 980,000 square feet and 200+ megawatts","scope":"phase","geography":null,"period":null,"asset_id":"us-abilene-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2025-03-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","source_publisher":"Crusoe","source_published":"2025-03-18","last_checked":"2026-10-18","interpretation":"Phase power capacity, lower bound (\"200+\"). Parent campus figure includes this phase, so not eligible for roll-up.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: Phase power capacity, lower bound (\"200+\"). Parent campus figure includes this phase, so not eligible for roll-up.","display_value":"at least 200 MW"}],"dates":{"published":"2025-03-18","effective":null,"event":"2025-03-18","expected_operation":"2025-H1","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/us-abilene-phase-1/"},{"id":"my-airtrunk-jhb1","status":"published","name":"AirTrunk JHB1 (Johor Bahru)","level":"campus","country_id":"malaysia","state_region":"Johor","metro_id":"johor","owner_ids":["airtrunk"],"operator_ids":["airtrunk"],"developer_ids":["airtrunk"],"stage":"operating","grid_status":"energised","summary":"AirTrunk's first Malaysian hyperscale campus in Johor Bahru, opened in July 2024. AirTrunk lists a total capacity of 150+ MW on a 10.3 ha site with 21,900 sq m of technical data hall area in 20 data halls, 132 kV diverse high-voltage feeds and a design PUE of 1.15. AirTrunk states 20 MW+ of liquid cooling is already in flight at JHB1.","expected_operating_date":{"value":"2024-07","confidence":"announced","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/"},"metric_claims":[{"value":150,"unit":"MW","original_wording":"a total capacity of 150+MW","metric_class":"it-power","stage":"operating","scope":"campus","as_of":"2026-10-18","source_url":"https://airtrunk.com/location/jhb1-johor/","claim_type":"reported","aggregation_eligible":true,"basis":"Total campus capacity as listed by AirTrunk. Treated as IT load because AirTrunk describes JHB1 plus JHB2 as more than 420 MW of IT load. Lower bound.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","value_kind":"lower_bound","delivery_state":"design","delivery_note":"AirTrunk lists 150+ MW as the total campus capacity. The campus is open, but the operating share is not disclosed."},{"value":21900,"unit":"m2","original_wording":"21,900m2 of technical data hall area","metric_class":"area","stage":"operating","scope":"campus","as_of":"2026-10-18","source_url":"https://airtrunk.com/location/jhb1-johor/","claim_type":"reported","aggregation_eligible":true,"basis":"Technical data hall area of the campus as listed by AirTrunk.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","delivery_state":"design"}],"power_architecture":{"summary":"132 kV diverse high-voltage power feeds.","source_url":"https://airtrunk.com/location/jhb1-johor/"},"cooling_architecture":{"summary":"Design PUE 1.15. Liquid cooling deployment of 20 MW+ in progress.","source_url":"https://airtrunk.com/location/jhb1-johor/"},"latest_change":{"date":"2024-07","summary":"Opened","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/"},"notes":"The campus opened in July 2024 (AirTrunk, 12 February 2025). Delivered share of the 150+ MW campus capacity not disclosed.","technology_ids":["direct-liquid-cooling"],"policy_ids":["my-mida-sustainable-data-centre-guideline"],"sources":[{"url":"https://airtrunk.com/location/jhb1-johor/","title":"JHB1 Johor Bahru","publisher":"AirTrunk","date_published":null,"date_accessed":"2026-10-18","authority_type":"company"},{"url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","title":"AirTrunk grows Malaysia platform with second cloud and AI-ready data centre in Johor (JHB2)","publisher":"AirTrunk","date_published":"2025-02-12","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["malaysia"],"provenance":{"stage":{"source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","as_of":"2024-07","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","revisions":[{"id":"corr-2026-10-18-jhb1-delivery-state","date":"2026-10-18","summary":"The 150+ MW figure is AirTrunk's total campus capacity. The campus opened in July 2024, but the share of the 150+ MW that is built and operating is not disclosed. The figure is now a lower bound of design capacity and is excluded from confirmed operating totals. The technical data hall area is also campus design area.","before":"150 MW shown as Operating and included in operating totals.","source_url":"https://airtrunk.com/location/jhb1-johor/","source_date":null}],"claims":[{"claim_id":"my-airtrunk-jhb1--it-power-1","record_id":"my-airtrunk-jhb1","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":150,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"a total capacity of 150+MW","scope":"campus","geography":null,"period":null,"asset_id":"my-airtrunk-jhb1","claim_stage":"operating","delivery_state":"design","delivery_evidence":null,"claim_date":null,"date_basis":"observed-only","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://airtrunk.com/location/jhb1-johor/","source_publisher":"AirTrunk","source_published":null,"last_checked":"2026-10-18","interpretation":"Total campus capacity as listed by AirTrunk. Treated as IT load because AirTrunk describes JHB1 plus JHB2 as more than 420 MW of IT load. Lower bound.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":150,"min":null,"max":null,"unit":"MW"},"rollup_class":"announced-design","rollup_eligible":true,"exclusion_reason":null,"display_value":"at least 150 MW"},{"claim_id":"my-airtrunk-jhb1--area-2","record_id":"my-airtrunk-jhb1","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":21900,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"21,900m2 of technical data hall area","scope":"campus","geography":null,"period":null,"asset_id":"my-airtrunk-jhb1","claim_stage":"operating","delivery_state":"design","delivery_evidence":null,"claim_date":null,"date_basis":"observed-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://airtrunk.com/location/jhb1-johor/","source_publisher":"AirTrunk","source_published":null,"last_checked":"2026-10-18","interpretation":"Technical data hall area of the campus as listed by AirTrunk.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":21900,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"21,900 sq m"}],"dates":{"published":"2025-02-12","effective":null,"event":"2024-07","expected_operation":"2024-07","last_checked":"2026-10-18","next_review":"2026-11-17","review_cadence_days":30},"url":"https://coolpowerindex.com/projects/my-airtrunk-jhb1/"},{"id":"my-airtrunk-jhb2","status":"published","name":"AirTrunk JHB2 (Iskandar Puteri, Johor)","level":"campus","country_id":"malaysia","state_region":"Johor","metro_id":"johor","owner_ids":["airtrunk"],"operator_ids":["airtrunk"],"developer_ids":["airtrunk"],"stage":"announced","summary":"Second AirTrunk hyperscale campus in Malaysia, at Iskandar Puteri, Johor, scalable to more than 270 MW for public cloud and technology customers. AirTrunk says JHB1 and JHB2 together provide more than 420 MW of IT load and a combined investment of over RM9.7 billion (A$3.5 billion). JHB2 will use liquid cooling, and AirTrunk is scoping treated greywater as a recycled water supply. Two different design PUE values are published by AirTrunk (see conflict note).","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/"},"metric_claims":[{"value":270,"unit":"MW","original_wording":"Scalable to over 270 megawatts (MW)","metric_class":"it-power","stage":"announced","scope":"campus","as_of":"2025-02-12","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","claim_type":"reported","aggregation_eligible":true,"basis":"Ultimate campus IT load, lower bound.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","value_kind":"lower_bound"},{"value":9.7,"unit":"currency","original_wording":"investing over RM 9.7 billion / A$3.5 billion in Malaysia","metric_class":"investment","stage":"announced","scope":"company","as_of":"2025-02-12","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","claim_type":"reported","aggregation_eligible":false,"basis":"Combined JHB1 and JHB2 investment, MYR billions. Not attributable to JHB2 alone.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"MYR","value_kind":"lower_bound","scale_word":"billion","multiplier":1000000000}],"cooling_architecture":{"summary":"Liquid cooling. Design PUE stated as 1.25 in the JHB2 announcement and 1.37 on the JHB2 location page.","source_url":"https://airtrunk.com/location/jhb2-johor/"},"latest_change":{"date":"2025-02-12","summary":"Announced by AirTrunk","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/"},"notes":"PUE conflict: 1.25 (announcement) vs 1.37 (location page), both AirTrunk, checked 18 October 2026.","technology_ids":["direct-liquid-cooling"],"policy_ids":["my-mida-sustainable-data-centre-guideline"],"sources":[{"url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","title":"AirTrunk grows Malaysia platform with second cloud and AI-ready data centre in Johor (JHB2)","publisher":"AirTrunk","date_published":"2025-02-12","date_accessed":"2026-10-18","authority_type":"company"},{"url":"https://airtrunk.com/location/jhb2-johor/","title":"JHB2 Johor Bahru","publisher":"AirTrunk","date_published":null,"date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","power_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["malaysia"],"provenance":{"stage":{"source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","as_of":"2025-02-12","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","revisions":[{"id":"corr-2026-10-18-jhb2-event-date","date":"2026-10-18","summary":"Announcement date corrected to 12 February 2025, the date of the AirTrunk release. 18 October 2026 was the date the page was checked, not an event.","before":"Shown as announced on 18 October 2026.","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","source_date":"2025-02-12"}],"claims":[{"claim_id":"my-airtrunk-jhb2--it-power-1","record_id":"my-airtrunk-jhb2","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":270,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"Scalable to over 270 megawatts (MW)","scope":"campus","geography":null,"period":null,"asset_id":"my-airtrunk-jhb2","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-02-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","source_publisher":"AirTrunk","source_published":"2025-02-12","last_checked":"2026-10-18","interpretation":"Ultimate campus IT load, lower bound.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":270,"min":null,"max":null,"unit":"MW"},"rollup_class":"announced-design","rollup_eligible":true,"exclusion_reason":null,"display_value":"at least 270 MW"},{"claim_id":"my-airtrunk-jhb2--investment-2","record_id":"my-airtrunk-jhb2","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"lower_bound","value":9.7,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"MYR","original_wording":"investing over RM 9.7 billion / A$3.5 billion in Malaysia","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-02-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","source_publisher":"AirTrunk","source_published":"2025-02-12","last_checked":"2026-10-18","interpretation":"Combined JHB1 and JHB2 investment, MYR billions. Not attributable to JHB2 alone.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":9700000000,"min":null,"max":null,"unit":"MYR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"at least MYR 9.7 billion"}],"dates":{"published":"2025-02-12","effective":null,"event":"2025-02-12","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/my-airtrunk-jhb2/"},{"id":"sa-datavolt-oxagon-campus","status":"published","name":"DataVolt Oxagon AI data centre campus (NEOM)","level":"campus","country_id":"saudi-arabia","state_region":"Tabuk Province (NEOM)","developer_ids":["datavolt"],"operator_ids":["datavolt"],"stage":"under-construction","summary":"AI data centre campus planned by Saudi developer DataVolt at Oxagon, NEOM's industrial city on the Red Sea coast, with a planned total of 1.5 GW. Construction of the 360 MW first phase began with a groundbreaking announced on 31 August 2026 at LEAP. DataVolt gives first-phase ready-for-service as 2028.","metric_claims":[{"value":1.5,"unit":"GW","original_wording":"wider planned 1.5GW Oxagon campus","metric_class":"other","stage":"announced","scope":"campus","as_of":"2026-08-31","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","claim_type":"reported","aggregation_eligible":false,"basis":"Planned campus total, basis not defined.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"expected_operating_date":{"value":"2028","confidence":"announced","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/"},"latest_change":{"date":"2026-08-31","summary":"Construction started on first phase","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/"},"sources":[{"url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","title":"HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM","publisher":"DataVolt","date_published":"2026-08-31","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["saudi-arabia"],"provenance":{"stage":{"source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","as_of":"2026-08-31","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"sa-datavolt-oxagon-campus--other-1","record_id":"sa-datavolt-oxagon-campus","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":1.5,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"wider planned 1.5GW Oxagon campus","scope":"campus","geography":null,"period":null,"asset_id":"sa-datavolt-oxagon-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-08-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","source_publisher":"DataVolt","source_published":"2026-08-31","last_checked":"2026-10-18","interpretation":"Planned campus total, basis not defined.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1.5,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"1.5 GW"}],"dates":{"published":"2026-08-31","effective":null,"event":"2026-08-31","expected_operation":"2028","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/sa-datavolt-oxagon-campus/"},{"id":"sa-datavolt-oxagon-phase-1","status":"published","name":"DataVolt Oxagon phase 1 (360 MW, incl. 100 MW with HUMAIN)","level":"phase","parent_id":"sa-datavolt-oxagon-campus","country_id":"saudi-arabia","state_region":"Tabuk Province (NEOM)","developer_ids":["datavolt","humain"],"operator_ids":["datavolt"],"occupier_ids":["humain"],"stage":"under-construction","summary":"360 MW first phase of DataVolt's Oxagon campus. HUMAIN, a PIF company, and DataVolt announced on 31 August 2026 an expanded partnership to jointly develop 100 MW of this phase, with construction underway and the first 100 MW expected to be available in 2028. The release mentions renewable energy integration and innovative cooling without specifying the design.","expected_operating_date":{"value":"2028","confidence":"announced","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/"},"metric_claims":[{"value":360,"unit":"MW","original_wording":"360MW first phase","metric_class":"other","stage":"under-construction","scope":"phase","as_of":"2026-08-31","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","claim_type":"reported","aggregation_eligible":false,"basis":"Phase capacity, basis not defined. Part of 1.5 GW parent.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"},{"value":100,"unit":"MW","original_wording":"100MW of the first phase's 360MW currently under development","metric_class":"other","stage":"under-construction","scope":"phase","as_of":"2026-08-31","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","claim_type":"reported","aggregation_eligible":false,"basis":"HUMAIN share within the 360 MW phase. Never add to 360.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"latest_change":{"date":"2026-08-31","summary":"Groundbreaking and HUMAIN partnership for 100 MW","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/"},"sources":[{"url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","title":"HUMAIN partners with DataVolt to jointly develop 100MW of a 360MW AI data center project in NEOM","publisher":"DataVolt","date_published":"2026-08-31","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"owner_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["saudi-arabia"],"provenance":{"stage":{"source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","as_of":"2026-08-31","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"sa-datavolt-oxagon-phase-1--other-1","record_id":"sa-datavolt-oxagon-phase-1","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":360,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"360MW first phase","scope":"phase","geography":null,"period":null,"asset_id":"sa-datavolt-oxagon-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-08-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","source_publisher":"DataVolt","source_published":"2026-08-31","last_checked":"2026-10-18","interpretation":"Phase capacity, basis not defined. Part of 1.5 GW parent.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":360,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"360 MW"},{"claim_id":"sa-datavolt-oxagon-phase-1--other-2","record_id":"sa-datavolt-oxagon-phase-1","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":100,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"100MW of the first phase's 360MW currently under development","scope":"phase","geography":null,"period":null,"asset_id":"sa-datavolt-oxagon-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-08-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","source_publisher":"DataVolt","source_published":"2026-08-31","last_checked":"2026-10-18","interpretation":"HUMAIN share within the 360 MW phase. Never add to 360.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":100,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"100 MW"}],"dates":{"published":"2026-08-31","effective":null,"event":"2026-08-31","expected_operation":"2028","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/sa-datavolt-oxagon-phase-1/"},{"id":"sg-jurong-island-dc-cfa2-digital-realty","status":"published","name":"Digital Realty DC-CFA2 data centre (Jurong Island, Singapore)","level":"project","country_id":"singapore","state_region":"Jurong Island","metro_id":"singapore-metro","developer_ids":["digital-realty"],"operator_ids":["digital-realty"],"stage":"provisional-allocation","summary":"Digital Realty was one of four operators provisionally allocated 50 MW of data centre capacity by EDB and IMDA on 21 August 2026 under the second Data Centre Call for Application (DC-CFA2). DC-CFA2 data centres will be located on Jurong Island, where JTC is developing a low-carbon data centre park. Selected proposals committed to power at least 50% of capacity from green pathways such as biomethane, low-carbon ammonia or hydrogen, or building-integrated PV, to use liquid cooling and 100% energy-efficient IT equipment, and to meet Green Mark for Data Centres Platinum. Site, design and timing details for this project are not yet published.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"metric_claims":[{"value":50,"unit":"MW","original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","metric_class":"it-power","stage":"allocated-provisional","scope":"project","as_of":"2026-08-21","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","claim_type":"reported","aggregation_eligible":true,"basis":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","delivery_state":"allocated-provisional"}],"cooling_architecture":{"summary":"Liquid cooling committed as part of the DC-CFA2 award (programme-level requirement, design not published).","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"power_architecture":{"summary":"At least 50% of capacity to be powered via green energy pathways (programme commitment). Specific pathway for this project not disclosed.","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"policy_ids":["sg-dc-cfa2-allocation-2026","sg-green-data-centre-roadmap"],"technology_ids":["direct-liquid-cooling"],"latest_change":{"date":"2026-08-21","summary":"Provisional allocation of 50 MW","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"notes":"Stage \"permitted\" represents a provisional government capacity allocation, not a building permit.","sources":[{"url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","title":"Fact sheet: Four data centre proposals selected as part of DC-CFA2","publisher":"EDB and IMDA","date_published":"2026-08-21","date_accessed":"2026-10-18","authority_type":"government"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["singapore"],"provenance":{"stage":{"source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","as_of":"2026-08-21","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","planning_status":"not disclosed","revisions":[{"id":"corr-2026-10-18-dc-cfa2-provisional","date":"2026-10-18","summary":"Stage corrected from Permitted to Provisional capacity allocation. EDB and IMDA provisionally allocated 50 MW to each operator on 21 August 2026. A provisional allocation is not planning permission and not built capacity. Planning status is not disclosed.","before":"Stage shown as Permitted and the 50 MW counted as permitted capacity.","source_url":"https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html","source_date":"2026-08-21"}],"claims":[{"claim_id":"sg-jurong-island-dc-cfa2-digital-realty--it-power-1","record_id":"sg-jurong-island-dc-cfa2-digital-realty","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-digital-realty","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"}],"dates":{"published":"2026-08-21","effective":null,"event":"2026-08-21","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/sg-jurong-island-dc-cfa2-digital-realty/"},{"id":"ie-equinix-db7x-blanchardstown","status":"published","name":"Equinix DB7x (Blanchardstown, Dublin)","level":"building","country_id":"ireland","state_region":"Fingal, Dublin","metro_id":"dublin","owner_ids":["equinix"],"operator_ids":["equinix"],"developer_ids":["equinix"],"stage":"under-construction","grid_status":"existing-allocation","commercial_availability":"scheduled","summary":"Equinix began construction of DB7x in Blanchardstown, Dublin, on 20 March 2026, next to two existing Equinix sites. The building covers 1,322 sq m. Equinix states an investment of $78 million in the facility plus $14 million for retail IBX fit-out, with retail capacity due from early 2028. Equinix says the building needs no additional grid power because it uses power already allocated to the existing site, and that it will be 100% flexible to support the national grid.","expected_operating_date":{"value":"2028","confidence":"announced","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin"},"metric_claims":[{"value":92,"unit":"currency","original_wording":"represents a $92 million investment","metric_class":"investment","stage":"announced","scope":"building","as_of":"2026-03-20","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","claim_type":"reported","aggregation_eligible":true,"basis":"Total stated by Equinix. Components: USD 78 million facility and USD 14 million retail IBX fit-out.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"USD","claim_id":"ie-equinix-db7x-blanchardstown--investment-total","metric":"investment-total","scale_word":"million","multiplier":1000000,"value_kind":"exact","components":["ie-equinix-db7x-blanchardstown--investment-facility","ie-equinix-db7x-blanchardstown--investment-retail-fit-out"]},{"value":1322,"unit":"m2","original_wording":"will cover 1,322m²","metric_class":"area","stage":"under-construction","scope":"building","as_of":"2026-03-20","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","claim_type":"reported","aggregation_eligible":true,"basis":"Building area as stated by Equinix.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-facility","metric":"investment-component-facility","value":78,"scale_word":"million","multiplier":1000000,"unit":"currency","currency":"USD","original_wording":"an investment of $78 million into the new high-performance data center facility","metric_class":"investment","stage":"announced","scope":"building","as_of":"2026-03-20","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","claim_type":"reported","aggregation_eligible":false,"component_of":"ie-equinix-db7x-blanchardstown--investment-total","basis":"Facility component of the USD 92 million total.","last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-retail-fit-out","metric":"investment-component-retail-fit-out","value":14,"scale_word":"million","multiplier":1000000,"unit":"currency","currency":"USD","original_wording":"an additional $14 million to support a retail IBX buildout","metric_class":"investment","stage":"announced","scope":"building","as_of":"2026-03-20","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","claim_type":"reported","aggregation_eligible":false,"component_of":"ie-equinix-db7x-blanchardstown--investment-total","basis":"Retail IBX fit-out component of the USD 92 million total.","last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)"}],"power_architecture":{"summary":"Uses existing allocated power at the Equinix site, no new grid connection. Described as 100% flexible to support the national grid.","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin"},"latest_change":{"date":"2026-03-20","summary":"Construction started","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin"},"notes":"Uses power already allocated to the existing Equinix site, no new grid connection.","sources":[{"url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","title":"Equinix begins construction on new data center in Dublin","publisher":"Equinix","date_published":"2026-03-20","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","cooling_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["ireland"],"provenance":{"stage":{"source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","as_of":"2026-03-20","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","commercial_availability_note":"Retail capacity scheduled from early 2028 (Equinix, 20 March 2026)","revisions":[{"id":"corr-2026-10-18-db7x-money-scale","date":"2026-10-18","summary":"Investment figure normalised to USD 92,000,000 (shown as USD 92 million). Equinix states USD 78 million for the facility plus USD 14 million for the retail IBX fit-out. These are kept as components of the total and never added again. Commercial availability corrected from available to scheduled (early 2028). Grid status reworded: the building uses power already allocated to the existing site.","before":"Investment shown as 92 with the million scale only in the note. Commercial availability shown as available.","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_date":"2026-03-20"}],"claims":[{"claim_id":"ie-equinix-db7x-blanchardstown--investment-total","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"investment-total","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":92,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"USD","original_wording":"represents a $92 million investment","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Total stated by Equinix. Components: USD 78 million facility and USD 14 million retail IBX fit-out.","components":["ie-equinix-db7x-blanchardstown--investment-facility","ie-equinix-db7x-blanchardstown--investment-retail-fit-out"],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":92000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":true,"exclusion_reason":null,"display_value":"USD 92 million"},{"claim_id":"ie-equinix-db7x-blanchardstown--area-2","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":1322,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"will cover 1,322m²","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Building area as stated by Equinix.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1322,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"1,322 sq m"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-facility","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"investment-component-facility","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":78,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"USD","original_wording":"an investment of $78 million into the new high-performance data center facility","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Facility component of the USD 92 million total.","components":[],"component_of":"ie-equinix-db7x-blanchardstown--investment-total","source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":78000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.","display_value":"USD 78 million"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-retail-fit-out","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"investment-component-retail-fit-out","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":14,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"USD","original_wording":"an additional $14 million to support a retail IBX buildout","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Retail IBX fit-out component of the USD 92 million total.","components":[],"component_of":"ie-equinix-db7x-blanchardstown--investment-total","source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":14000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.","display_value":"USD 14 million"}],"dates":{"published":"2026-03-20","effective":null,"event":"2026-03-20","expected_operation":"2028","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/ie-equinix-db7x-blanchardstown/"},{"id":"sg-jurong-island-dc-cfa2-equinix","status":"published","name":"Equinix DC-CFA2 data centre (Jurong Island, Singapore)","level":"project","country_id":"singapore","state_region":"Jurong Island","metro_id":"singapore-metro","developer_ids":["equinix"],"operator_ids":["equinix"],"stage":"provisional-allocation","summary":"Equinix was one of four operators provisionally allocated 50 MW of data centre capacity by EDB and IMDA on 21 August 2026 under the second Data Centre Call for Application (DC-CFA2). DC-CFA2 data centres will be located on Jurong Island, where JTC is developing a low-carbon data centre park. Selected proposals committed to power at least 50% of capacity from green pathways such as biomethane, low-carbon ammonia or hydrogen, or building-integrated PV, to use liquid cooling and 100% energy-efficient IT equipment, and to meet Green Mark for Data Centres Platinum. Site, design and timing details for this project are not yet published.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"metric_claims":[{"value":50,"unit":"MW","original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","metric_class":"it-power","stage":"allocated-provisional","scope":"project","as_of":"2026-08-21","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","claim_type":"reported","aggregation_eligible":true,"basis":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","delivery_state":"allocated-provisional"}],"cooling_architecture":{"summary":"Liquid cooling committed as part of the DC-CFA2 award (programme-level requirement, design not published).","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"power_architecture":{"summary":"At least 50% of capacity to be powered via green energy pathways (programme commitment). Specific pathway for this project not disclosed.","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"policy_ids":["sg-dc-cfa2-allocation-2026","sg-green-data-centre-roadmap"],"technology_ids":["direct-liquid-cooling"],"latest_change":{"date":"2026-08-21","summary":"Provisional allocation of 50 MW","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"notes":"Stage \"permitted\" represents a provisional government capacity allocation, not a building permit.","sources":[{"url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","title":"Fact sheet: Four data centre proposals selected as part of DC-CFA2","publisher":"EDB and IMDA","date_published":"2026-08-21","date_accessed":"2026-10-18","authority_type":"government"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["singapore"],"provenance":{"stage":{"source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","as_of":"2026-08-21","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","planning_status":"not disclosed","revisions":[{"id":"corr-2026-10-18-dc-cfa2-provisional","date":"2026-10-18","summary":"Stage corrected from Permitted to Provisional capacity allocation. EDB and IMDA provisionally allocated 50 MW to each operator on 21 August 2026. A provisional allocation is not planning permission and not built capacity. Planning status is not disclosed.","before":"Stage shown as Permitted and the 50 MW counted as permitted capacity.","source_url":"https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html","source_date":"2026-08-21"}],"claims":[{"claim_id":"sg-jurong-island-dc-cfa2-equinix--it-power-1","record_id":"sg-jurong-island-dc-cfa2-equinix","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-equinix","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"}],"dates":{"published":"2026-08-21","effective":null,"event":"2026-08-21","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/sg-jurong-island-dc-cfa2-equinix/"},{"id":"de-google-dietzenbach","status":"published","name":"Google Dietzenbach data centre (Hesse)","level":"building","country_id":"germany","state_region":"Hesse","metro_id":"frankfurt-rhine-main","owner_ids":["google"],"developer_ids":["google"],"operator_ids":["google"],"stage":"announced","commercial_availability":"own-use","summary":"New Google data centre in Dietzenbach near Frankfurt, announced on 11 November 2025 as part of a €5.5 billion investment in Germany for 2026 to 2029. Google said the facility will strengthen its German cloud regions and detailed a collaboration with Energieversorgung Offenbach (EVO) so that excess heat can be fed into EVO's district heating network. The €5.5 billion covers infrastructure and offices nationwide and is not a project budget. Capacity and opening date not disclosed.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029"},"cooling_architecture":{"summary":"Heat recovery: excess heat planned to feed EVO district heating network (Google's first heat recovery project in Germany).","source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029"},"metric_claims":[{"value":5.5,"unit":"currency","original_wording":"€5.5 billion investment (2026-2029) in infrastructure and offices in Germany","metric_class":"investment","stage":"announced","scope":"company","as_of":"2025-11-11","source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029","claim_type":"reported","aggregation_eligible":false,"basis":"Company-wide Germany investment, EUR billions. Not a project budget.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"EUR","period":"2026-2029"}],"cloud_region_ids":["gcp-europe-west3","gcp-europe-west10"],"policy_ids":["de-enefg-section-11-data-centres"],"technology_ids":["heat-reuse"],"latest_change":{"date":"2025-11-11","summary":"Announced with heat recovery partnership","source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029"},"notes":"Cloud region link is stated by Google (\"strengthen the company's cloud regions in Germany\"), not a specific region code.","sources":[{"url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029","title":"Google announces €5.5 billion investment in Germany, including AI infrastructure, through 2029","publisher":"Google Cloud Press Corner","date_published":"2025-11-11","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","power_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"country_ids":["germany"],"provenance":{"stage":{"source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029","as_of":"2025-11-11","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"de-google-dietzenbach--investment-1","record_id":"de-google-dietzenbach","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":5.5,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"EUR","original_wording":"€5.5 billion investment (2026-2029) in infrastructure and offices in Germany","scope":"company","geography":null,"period":"2026-2029","asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-11-11","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029","source_publisher":"Google Cloud Press Corner","source_published":"2025-11-11","last_checked":"2026-10-18","interpretation":"Company-wide Germany investment, EUR billions. Not a project budget.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":5500000000,"min":null,"max":null,"unit":"EUR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"EUR 5.5 billion"}],"dates":{"published":"2025-11-11","effective":null,"event":"2025-11-11","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/de-google-dietzenbach/"},{"id":"my-google-elmina","status":"published","name":"Google Elmina data centre (Selangor)","level":"building","country_id":"malaysia","state_region":"Selangor","metro_id":"greater-kuala-lumpur","owner_ids":["google"],"developer_ids":["google"],"operator_ids":["google"],"stage":"under-construction","commercial_availability":"own-use","summary":"Google's first data centre in Malaysia, at Sime Darby Property's Elmina Business Park in Selangor, announced on 30 May 2024 within a US$2 billion investment that also includes the planned Malaysia cloud region. In August 2026 a Google infrastructure executive told Selangor state media that construction was progressing as planned and operations were expected within about nine months, without a fixed date. About 4,200 construction jobs are expected. Capacity is not disclosed.","expected_operating_date":{"value":"2027","confidence":"estimated","source_url":"https://mediaselangor.com/en/2026/08/390529"},"metric_claims":[{"value":2,"unit":"currency","original_wording":"investing US$2 billion in Malaysia","metric_class":"investment","stage":"announced","scope":"company","as_of":"2024-05-30","source_url":"https://www.googlecloudpresscorner.com/2024-05-30-Advancing-Malaysia-Together-Google-Announces-US-2-Billion-Investment-in-Malaysia,-Including-First-Google-Data-Center-and-Google-Cloud-Region","claim_type":"reported","aggregation_eligible":false,"basis":"Company-wide Malaysia investment including data centre, cloud region and skills programmes, USD billions.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"USD"}],"cloud_region_ids":["gcp-malaysia-announced"],"latest_change":{"date":"2026-08-20","summary":"Operations expected within about nine months","source_url":"https://mediaselangor.com/en/2026/08/390529"},"sources":[{"url":"https://mediaselangor.com/en/2026/08/390529","title":"Google's Elmina data centre to operate within nine months","publisher":"Media Selangor (Selangor state media)","date_published":"2026-08-20","date_accessed":"2026-10-18","authority_type":"government"},{"url":"https://www.googlecloudpresscorner.com/2024-05-30-Advancing-Malaysia-Together-Google-Announces-US-2-Billion-Investment-in-Malaysia,-Including-First-Google-Data-Center-and-Google-Cloud-Region","title":"Google announces US$2 billion investment in Malaysia, including first Google data centre and Google Cloud region","publisher":"Google Cloud Press Corner","date_published":"2024-05-30","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"country_ids":["malaysia"],"provenance":{"stage":{"source_url":"https://mediaselangor.com/en/2026/08/390529","as_of":"2026-08-20","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"my-google-elmina--investment-1","record_id":"my-google-elmina","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":2,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"investing US$2 billion in Malaysia","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2024-05-30","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.googlecloudpresscorner.com/2024-05-30-Advancing-Malaysia-Together-Google-Announces-US-2-Billion-Investment-in-Malaysia,-Including-First-Google-Data-Center-and-Google-Cloud-Region","source_publisher":"Google Cloud Press Corner","source_published":"2024-05-30","last_checked":"2026-10-18","interpretation":"Company-wide Malaysia investment including data centre, cloud region and skills programmes, USD billions.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":2000000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"USD 2 billion"}],"dates":{"published":"2026-08-20","effective":null,"event":"2026-08-20","expected_operation":"2027","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/my-google-elmina/"},{"id":"ie-google-grange-castle-phase-3","status":"published","name":"Google Grange Castle data centre extension (phase 3, Dublin)","level":"phase","country_id":"ireland","state_region":"South Dublin","metro_id":"dublin","owner_ids":["google"],"developer_ids":["google"],"operator_ids":["google"],"stage":"permitted","grid_status":"offer","commercial_availability":"own-use","summary":"Third phase of Google's campus at Grange Castle Business Park, south Dublin: a 72,400 sq m data centre on a 50 acre site. South Dublin County Council refused permission in August 2024 citing grid capacity and lack of on-site renewables. On appeal, An Coimisiún Pleanála granted permission (reported 28 September 2026), with conditions including evidence of power purchase agreement engagement before development and renewable fuel for backup generators. Google said in its appeal that EirGrid had given a grid connection in 2021. The decision could still face judicial review.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/"},"metric_claims":[{"value":72400,"unit":"m2","original_wording":"construct the 72,400sq m data centre on the 50-acre site","metric_class":"area","stage":"permitted","scope":"phase","as_of":"2026-09-28","source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/","claim_type":"reported","aggregation_eligible":false,"basis":"Building floor area as reported.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"power_architecture":{"summary":"Planning condition requires renewable fuel for backup generators (as reported). Grid connection reported as secured from EirGrid in 2021 per Google's appeal.","source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/"},"latest_change":{"date":"2026-09-28","summary":"Permission granted on appeal by An Coimisiún Pleanála","source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/"},"notes":"Grid status set to offer because the appeal cites a 2021 EirGrid connection. Contract or energisation status not confirmed. Pre-dates CRU/2025236, so processed under the earlier policy.","policy_ids":["ie-cru-large-energy-users-connection-policy-2025"],"sources":[{"url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/","title":"Google wins planning permission for Dublin data centre extension","publisher":"The Irish Times","date_published":"2026-09-28","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","cooling_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["ireland"],"provenance":{"stage":{"source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/","as_of":"2026-09-28","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"ie-google-grange-castle-phase-3--area-1","record_id":"ie-google-grange-castle-phase-3","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":72400,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"construct the 72,400sq m data centre on the 50-acre site","scope":"phase","geography":null,"period":null,"asset_id":"ie-google-grange-castle-phase-3","claim_stage":"permitted","delivery_state":"permitted","delivery_evidence":null,"claim_date":"2026-09-28","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/","source_publisher":"The Irish Times","source_published":"2026-09-28","last_checked":"2026-10-18","interpretation":"Building floor area as reported.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":72400,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"72,400 sq m"}],"dates":{"published":"2026-09-28","effective":null,"event":"2026-09-28","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/ie-google-grange-castle-phase-3/"},{"id":"uk-google-waltham-cross","status":"published","name":"Google Waltham Cross data centre (Hertfordshire)","level":"building","country_id":"united-kingdom","state_region":"Hertfordshire, England","metro_id":"london","owner_ids":["google"],"operator_ids":["google"],"occupier_ids":["google"],"stage":"operating","commercial_availability":"own-use","summary":"Google data centre at Waltham Cross in Hertfordshire, north of London, opened on 16 September 2025. Google announced it alongside a two-year £5 billion UK investment that covers capital expenditure, research and development and engineering including Google DeepMind. That figure is company-wide for the UK and is not the cost of this building. On the same day Google named Shell Energy Europe as its 24/7 carbon-free energy manager in the UK, including access to battery storage. Capacity has not been disclosed.","expected_operating_date":{"value":"2025-09-16","confidence":"announced","source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy"},"metric_claims":[{"value":5,"unit":"currency","original_wording":"two-year £5 billion investment in the UK","metric_class":"investment","stage":"announced","scope":"company","as_of":"2025-09-16","source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy","claim_type":"reported","aggregation_eligible":false,"basis":"Company-wide UK capex, R&D and engineering over two years. Not a project budget. Never convert to MW.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"GBP","period":"2025-2027"}],"latest_change":{"date":"2025-09-16","summary":"Data centre opened","source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy"},"power_architecture":{"summary":"No site power architecture reported. Google reports a UK-wide arrangement with Shell to manage carbon-free supply and battery storage access, not specific to this building.","source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy"},"sources":[{"url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy","title":"Google opens Waltham Cross data centre as part of two-year £5 billion investment in the UK","publisher":"Google Cloud Press Corner","date_published":"2025-09-16","date_accessed":"2026-10-18","authority_type":"company"}],"notes":"Investment figure unit: value 5 with unit currency means GBP 5 billion. See basis.","type":"project","grid_status":"not-disclosed","cooling_architecture":null,"contractors":[],"supplier_links":[],"developer_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-kingdom"],"provenance":{"stage":{"source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy","as_of":"2025-09-16","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"uk-google-waltham-cross--investment-1","record_id":"uk-google-waltham-cross","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":5,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"GBP","original_wording":"two-year £5 billion investment in the UK","scope":"company","geography":null,"period":"2025-2027","asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-09-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy","source_publisher":"Google Cloud Press Corner","source_published":"2025-09-16","last_checked":"2026-10-18","interpretation":"Company-wide UK capex, R&D and engineering over two years. Not a project budget. Never convert to MW.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":5000000000,"min":null,"max":null,"unit":"GBP"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"GBP 5 billion"}],"dates":{"published":"2025-09-16","effective":null,"event":"2025-09-16","expected_operation":"2025-09-16","last_checked":"2026-10-18","next_review":"2026-11-17","review_cadence_days":30},"url":"https://coolpowerindex.com/projects/uk-google-waltham-cross/"},{"id":"sg-jurong-island-dc-cfa2-keppel","status":"published","name":"Keppel Data Centres DC-CFA2 data centre (Jurong Island, Singapore)","level":"project","country_id":"singapore","state_region":"Jurong Island","metro_id":"singapore-metro","developer_ids":["keppel-data-centres"],"operator_ids":["keppel-data-centres"],"stage":"provisional-allocation","summary":"Keppel Data Centres was one of four operators provisionally allocated 50 MW of data centre capacity by EDB and IMDA on 21 August 2026 under the second Data Centre Call for Application (DC-CFA2). DC-CFA2 data centres will be located on Jurong Island, where JTC is developing a low-carbon data centre park. Selected proposals committed to power at least 50% of capacity from green pathways such as biomethane, low-carbon ammonia or hydrogen, or building-integrated PV, to use liquid cooling and 100% energy-efficient IT equipment, and to meet Green Mark for Data Centres Platinum. Site, design and timing details for this project are not yet published.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"metric_claims":[{"value":50,"unit":"MW","original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","metric_class":"it-power","stage":"allocated-provisional","scope":"project","as_of":"2026-08-21","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","claim_type":"reported","aggregation_eligible":true,"basis":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","delivery_state":"allocated-provisional"}],"cooling_architecture":{"summary":"Liquid cooling committed as part of the DC-CFA2 award (programme-level requirement, design not published).","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"power_architecture":{"summary":"At least 50% of capacity to be powered via green energy pathways (programme commitment). Specific pathway for this project not disclosed.","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"policy_ids":["sg-dc-cfa2-allocation-2026","sg-green-data-centre-roadmap"],"technology_ids":["direct-liquid-cooling"],"latest_change":{"date":"2026-08-21","summary":"Provisional allocation of 50 MW","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"notes":"Stage \"permitted\" represents a provisional government capacity allocation, not a building permit.","sources":[{"url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","title":"Fact sheet: Four data centre proposals selected as part of DC-CFA2","publisher":"EDB and IMDA","date_published":"2026-08-21","date_accessed":"2026-10-18","authority_type":"government"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["singapore"],"provenance":{"stage":{"source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","as_of":"2026-08-21","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","planning_status":"not disclosed","revisions":[{"id":"corr-2026-10-18-dc-cfa2-provisional","date":"2026-10-18","summary":"Stage corrected from Permitted to Provisional capacity allocation. EDB and IMDA provisionally allocated 50 MW to each operator on 21 August 2026. A provisional allocation is not planning permission and not built capacity. Planning status is not disclosed.","before":"Stage shown as Permitted and the 50 MW counted as permitted capacity.","source_url":"https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html","source_date":"2026-08-21"}],"claims":[{"claim_id":"sg-jurong-island-dc-cfa2-keppel--it-power-1","record_id":"sg-jurong-island-dc-cfa2-keppel","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-keppel","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"}],"dates":{"published":"2026-08-21","effective":null,"event":"2026-08-21","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/sg-jurong-island-dc-cfa2-keppel/"},{"id":"us-meta-richland-parish-hyperion","status":"published","name":"Meta Richland Parish data center (Hyperion, Louisiana)","aliases":["Hyperion"],"level":"campus","country_id":"united-states","state_region":"Louisiana","owner_ids":["meta"],"operator_ids":["meta"],"developer_ids":["meta"],"stage":"under-construction","commercial_availability":"own-use","summary":"Meta's AI-optimised data centre in Richland Parish, Louisiana, home of its Hyperion AI training cluster. On 13 July 2026 Meta said it is expanding the site to 5 GW of compute capacity, the largest in its fleet, representing more than $50 billion invested in the region, with over 7,500 peak construction jobs and 1,000 operational roles. General contractors named by Meta are DPR Construction, Turner Construction and Mortenson. Meta cites an energy agreement it says will save Entergy Louisiana customers $2.65 billion over 20 years. Ground was broken in December 2024.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"},"metric_claims":[{"value":5,"unit":"GW","original_wording":"expanding our AI-optimized data center in Richland Parish, Louisiana to 5 GW in compute capacity","metric_class":"other","stage":"announced","scope":"campus","as_of":"2026-07-13","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","claim_type":"reported","aggregation_eligible":false,"basis":"\"Compute capacity\" in GW as stated by Meta. Electrical basis (IT, facility or grid) not defined, so classed other and not summed with IT MW.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"},{"value":50,"unit":"currency","original_wording":"an investment of more than $50 billion in the Richland Parish region","metric_class":"investment","stage":"announced","scope":"campus","as_of":"2026-07-13","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","claim_type":"reported","aggregation_eligible":false,"basis":"USD billions, lower bound, regional investment by Meta. Period not stated.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"USD"}],"contractors":[{"name":"DPR Construction","role":"general contractor","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"},{"name":"Turner Construction Company","role":"general contractor","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"},{"name":"Mortenson Construction","role":"general contractor","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"}],"latest_change":{"date":"2026-07-13","summary":"Expansion to 5 GW compute capacity announced","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"},"sources":[{"url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","title":"Deepening our investment in Richland Parish, Louisiana","publisher":"Meta Data Centers","date_published":"2026-07-13","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","cooling_architecture":null,"power_architecture":null,"supplier_links":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-states"],"provenance":{"stage":{"source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","as_of":"2026-07-13","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"us-meta-richland-parish-hyperion--other-1","record_id":"us-meta-richland-parish-hyperion","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":5,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"expanding our AI-optimized data center in Richland Parish, Louisiana to 5 GW in compute capacity","scope":"campus","geography":null,"period":null,"asset_id":"us-meta-richland-parish-hyperion","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-07-13","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","source_publisher":"Meta Data Centers","source_published":"2026-07-13","last_checked":"2026-10-18","interpretation":"\"Compute capacity\" in GW as stated by Meta. Electrical basis (IT, facility or grid) not defined, so classed other and not summed with IT MW.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":5,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"5 GW"},{"claim_id":"us-meta-richland-parish-hyperion--investment-2","record_id":"us-meta-richland-parish-hyperion","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"lower_bound","value":50,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"an investment of more than $50 billion in the Richland Parish region","scope":"campus","geography":null,"period":null,"asset_id":"us-meta-richland-parish-hyperion","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-07-13","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","source_publisher":"Meta Data Centers","source_published":"2026-07-13","last_checked":"2026-10-18","interpretation":"USD billions, lower bound, regional investment by Meta. Period not stated.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50000000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: USD billions, lower bound, regional investment by Meta. Period not stated.","display_value":"at least USD 50 billion"}],"dates":{"published":"2026-07-13","effective":null,"event":"2026-07-13","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/us-meta-richland-parish-hyperion/"},{"id":"us-microsoft-fairwater-1","status":"published","name":"Microsoft Fairwater 1 (Mount Pleasant, Wisconsin)","level":"phase","parent_id":"us-microsoft-mount-pleasant-campus","country_id":"united-states","state_region":"Wisconsin","owner_ids":["microsoft"],"operator_ids":["microsoft"],"stage":"operating","commercial_availability":"own-use","grid_status":"energised","summary":"First Microsoft datacenter facility at Mount Pleasant, announced in May 2024. Equipment came online with startup activities in April 2026 and Microsoft reported the facility fully operational on 23 June 2026, with nearly 550 full-time staff. The site has three buildings with 1.2 million sq ft under roof and uses closed-loop liquid cooling for most capacity.","expected_operating_date":{"value":"2026-06-23","confidence":"announced","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"},"metric_claims":[{"value":1200000,"unit":"sqft","original_wording":"three massive buildings with a combined 1.2 million square feet under roofs","metric_class":"area","stage":"operating","scope":"phase","as_of":"2025-09-18","source_url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","claim_type":"reported","aggregation_eligible":true,"basis":"Floor area under roof.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"cooling_architecture":{"summary":"Closed-loop direct liquid cooling for over 90% of capacity with fin coolers and chiller plant. Air cooling for remaining servers.","source_url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/"},"latest_change":{"date":"2026-06-23","summary":"Fully operational","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"},"notes":"Grid status energised inferred from reported operation.","sources":[{"url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","title":"Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin","publisher":"Microsoft Source","date_published":"2026-06-23","date_accessed":"2026-10-18","authority_type":"company"},{"url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","title":"Inside the world's most powerful AI datacenter","publisher":"Microsoft (Official Microsoft Blog)","date_published":"2025-09-18","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","power_architecture":null,"contractors":[],"supplier_links":[],"developer_ids":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-states"],"provenance":{"stage":{"source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","as_of":"2026-06-23","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"us-microsoft-fairwater-1--area-1","record_id":"us-microsoft-fairwater-1","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":1200000,"value_min":null,"value_max":null,"unit":"sqft","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"three massive buildings with a combined 1.2 million square feet under roofs","scope":"phase","geography":null,"period":null,"asset_id":"us-microsoft-fairwater-1","claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2025-09-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","source_publisher":"Microsoft (Official Microsoft Blog)","source_published":"2025-09-18","last_checked":"2026-10-18","interpretation":"Floor area under roof.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1200000,"min":null,"max":null,"unit":"sqft"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"1,200,000 sq ft"}],"dates":{"published":"2026-06-23","effective":null,"event":"2026-06-23","expected_operation":"2026-06-23","last_checked":"2026-10-18","next_review":"2026-11-17","review_cadence_days":30},"url":"https://coolpowerindex.com/projects/us-microsoft-fairwater-1/"},{"id":"us-microsoft-mount-pleasant-campus","status":"published","name":"Microsoft Mount Pleasant campus (Fairwater, Wisconsin)","aliases":["Fairwater Wisconsin"],"level":"campus","country_id":"united-states","state_region":"Wisconsin","owner_ids":["microsoft"],"operator_ids":["microsoft"],"developer_ids":["microsoft"],"stage":"under-construction","commercial_availability":"own-use","summary":"Microsoft AI datacenter campus in Mount Pleasant, Racine County, Wisconsin. The first facility, called Fairwater, covers 315 acres with three buildings and 1.2 million sq ft under roof and runs a single cluster of NVIDIA GB200 servers. Microsoft reported it fully operational on 23 June 2026, after startup in April. A second facility next to it is under construction for completion in 2028. Microsoft estimates $4.7 billion of local hyperscale construction spend in Wisconsin between 2024 and 2028. Electrical capacity is not disclosed.","metric_claims":[{"value":4.7,"unit":"currency","original_wording":"will have spent $4.7 billion between 2024 and 2028 locally on hyperscale construction in Wisconsin","metric_class":"investment","stage":"announced","scope":"campus","as_of":"2026-06-23","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","claim_type":"reported","aggregation_eligible":false,"basis":"Local construction spend estimate, USD billions. Distinct from earlier headline investment figures.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"USD","period":"2024-2028"}],"cooling_architecture":{"summary":"Closed-loop liquid cooling for over 90% of capacity, filled once and recirculated, heat rejected via fin coolers with 172 fans and a large water-cooled chiller plant. Remaining capacity uses outside air, switching to water on hottest days.","source_url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/"},"latest_change":{"date":"2026-06-23","summary":"First facility fully operational, second under construction","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"},"technology_ids":["direct-liquid-cooling","heat-rejection"],"sources":[{"url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","title":"Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin","publisher":"Microsoft Source","date_published":"2026-06-23","date_accessed":"2026-10-18","authority_type":"company"},{"url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","title":"Inside the world's most powerful AI datacenter","publisher":"Microsoft (Official Microsoft Blog)","date_published":"2025-09-18","date_accessed":"2026-10-18","authority_type":"company"},{"url":"https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/","title":"Made in Wisconsin: The world's most powerful AI datacenter","publisher":"Microsoft On the Issues","date_published":"2025-09-18","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","power_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"cloud_region_ids":[],"country_ids":["united-states"],"provenance":{"stage":{"source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","as_of":"2026-06-23","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"us-microsoft-mount-pleasant-campus--investment-1","record_id":"us-microsoft-mount-pleasant-campus","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":4.7,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"will have spent $4.7 billion between 2024 and 2028 locally on hyperscale construction in Wisconsin","scope":"campus","geography":null,"period":"2024-2028","asset_id":"us-microsoft-mount-pleasant-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-06-23","date_basis":"stated","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","source_publisher":"Microsoft Source","source_published":"2026-06-23","last_checked":"2026-10-18","interpretation":"Local construction spend estimate, USD billions. Distinct from earlier headline investment figures.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":4700000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Modelled estimate. Totals use reported figures only.","display_value":"USD 4.7 billion"}],"dates":{"published":"2026-06-23","effective":null,"event":"2026-06-23","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/us-microsoft-mount-pleasant-campus/"},{"id":"de-microsoft-rhenish-cluster","status":"published","name":"Microsoft Rhenish mining area data centre cluster (Bergheim, Bedburg, Elsdorf)","level":"campus","country_id":"germany","state_region":"North Rhine-Westphalia","owner_ids":["microsoft"],"developer_ids":["microsoft"],"operator_ids":["microsoft"],"stage":"under-construction","commercial_availability":"own-use","summary":"Cluster of three Microsoft hyperscale data centres in the Rhenish lignite region of North Rhine-Westphalia. Ground was broken in Bergheim on 12 March 2026, with building permits granted for Bergheim and Bedburg and Elsdorf to follow. Microsoft says the sites will use a closed-loop cooling concept without evaporative water loss. WDR reports the first data centre is due for completion in 2028 and cites Microsoft's €3.2 billion German AI and cloud investment, which is a company-level figure. Capacity not disclosed.","expected_operating_date":{"value":"2028","confidence":"estimated","source_url":"https://www1.wdr.de/nrw/rheinland/bergheim-bedburg-elsdorf-microsoft-rechenzentrum-spatenstich-internet-ki-100.html"},"cooling_architecture":{"summary":"Closed-loop cooling with no evaporative water use, refilled almost never after initial fill (Microsoft).","source_url":"https://news.microsoft.com/source/emea/2026/03/spatenstich-fuer-rechenzentrums-cluster-in-nordrhein-westfalen-microsoft-staerkt-die-digitale-infrastruktur-fuer-deutschlands-ki-zukunft/?lang=de"},"metric_claims":[{"value":3.2,"unit":"currency","original_wording":"3,2 Milliarden Euro will Microsoft in der Region investieren","metric_class":"investment","stage":"announced","scope":"company","as_of":"2026-03-12","source_url":"https://www1.wdr.de/nrw/rheinland/bergheim-bedburg-elsdorf-microsoft-rechenzentrum-spatenstich-internet-ki-100.html","claim_type":"reported","aggregation_eligible":false,"basis":"Microsoft Germany AI and cloud infrastructure investment, EUR billions. Scope across Germany per Microsoft 2024 announcement, attributed to the region by WDR. Not a verified project budget.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"conflicting","currency":"EUR","conflict_note":"WDR attributes the €3.2bn to the region, while Microsoft frames it as its Germany investment. Scope unresolved."}],"latest_change":{"date":"2026-03-12","summary":"Groundbreaking in Bergheim, permits for Bergheim and Bedburg","source_url":"https://news.microsoft.com/source/emea/2026/03/spatenstich-fuer-rechenzentrums-cluster-in-nordrhein-westfalen-microsoft-staerkt-die-digitale-infrastruktur-fuer-deutschlands-ki-zukunft/?lang=de"},"technology_ids":["direct-liquid-cooling"],"policy_ids":["de-enefg-section-11-data-centres"],"sources":[{"url":"https://news.microsoft.com/source/emea/2026/03/spatenstich-fuer-rechenzentrums-cluster-in-nordrhein-westfalen-microsoft-staerkt-die-digitale-infrastruktur-fuer-deutschlands-ki-zukunft/?lang=de","title":"Spatenstich für Rechenzentrums-Cluster in Nordrhein-Westfalen","publisher":"Microsoft Source EMEA","date_published":"2026-03-12","date_accessed":"2026-10-18","authority_type":"company"},{"url":"https://www1.wdr.de/nrw/rheinland/bergheim-bedburg-elsdorf-microsoft-rechenzentrum-spatenstich-internet-ki-100.html","title":"Spatenstich für Microsoft-Rechenzentren in Bergheim","publisher":"WDR","date_published":"2026-03-12","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","power_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["germany"],"provenance":{"stage":{"source_url":"https://news.microsoft.com/source/emea/2026/03/spatenstich-fuer-rechenzentrums-cluster-in-nordrhein-westfalen-microsoft-staerkt-die-digitale-infrastruktur-fuer-deutschlands-ki-zukunft/?lang=de","as_of":"2026-03-12","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"de-microsoft-rhenish-cluster--investment-1","record_id":"de-microsoft-rhenish-cluster","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":3.2,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"EUR","original_wording":"3,2 Milliarden Euro will Microsoft in der Region investieren","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"disputed","source_url":"https://www1.wdr.de/nrw/rheinland/bergheim-bedburg-elsdorf-microsoft-rechenzentrum-spatenstich-internet-ki-100.html","source_publisher":"WDR","source_published":"2026-03-12","last_checked":"2026-10-18","interpretation":"Microsoft Germany AI and cloud infrastructure investment, EUR billions. Scope across Germany per Microsoft 2024 announcement, attributed to the region by WDR. Not a verified project budget.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"conflicting","kind":"metric","normalised":{"value":3200000000,"min":null,"max":null,"unit":"EUR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"EUR 3.2 billion"}],"dates":{"published":"2026-03-12","effective":null,"event":"2026-03-12","expected_operation":"2028","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/de-microsoft-rhenish-cluster/"},{"id":"us-microsoft-fairwater-2","status":"published","name":"Microsoft second Mount Pleasant facility (Wisconsin)","level":"phase","parent_id":"us-microsoft-mount-pleasant-campus","country_id":"united-states","state_region":"Wisconsin","owner_ids":["microsoft"],"operator_ids":["microsoft"],"stage":"under-construction","commercial_availability":"own-use","summary":"Second Microsoft datacenter facility immediately adjacent to Fairwater 1 in Mount Pleasant. As of 23 June 2026 foundations, steel erection and underground utilities were in progress, with completion scheduled for 2028. Microsoft expects site employment to grow to about 800 when it is operational. Capacity not disclosed.","expected_operating_date":{"value":"2028","confidence":"announced","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"},"latest_change":{"date":"2026-06-23","summary":"Under construction, completion 2028","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"},"sources":[{"url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","title":"Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin","publisher":"Microsoft Source","date_published":"2026-06-23","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","grid_status":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"developer_ids":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-states"],"provenance":{"stage":{"source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","as_of":"2026-06-23","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","metric_claims":[],"claims":[],"dates":{"published":"2026-06-23","effective":null,"event":"2026-06-23","expected_operation":"2028","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/us-microsoft-fairwater-2/"},{"id":"uk-nscale-loughton","status":"published","name":"Nscale Loughton AI data centre (Essex)","level":"project","country_id":"united-kingdom","state_region":"Essex, England","metro_id":"london","owner_ids":["nscale"],"developer_ids":["nscale"],"occupier_ids":[],"stage":"delayed","grid_status":"applied","summary":"Planned AI data centre by UK company Nscale at Loughton, Essex, presented by the UK government in 2025 as the largest UK sovereign AI data centre, with Microsoft as the expected anchor customer. In September 2026 the Guardian reported that UK Power Networks had indicated sufficient grid supply might not be available until the early to mid 2030s, against a planned 2027 opening. The site is reported to be seeking up to 90 MW. On 18 October 2026 Reuters and the Guardian, citing the Telegraph, reported that Microsoft had terminated its agreement for the site. Nscale says it remains committed and is exploring alternative power sources.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.theguardian.com/technology/2026/sep/24/construction-largest-supercomputer-delayed"},"metric_claims":[{"value":90,"unit":"MW","original_wording":"seeking up to 90MW of capacity","metric_class":"grid-connection","stage":"announced","scope":"project","as_of":"2026-09-24","source_url":"https://www.theguardian.com/technology/2026/sep/24/construction-largest-supercomputer-delayed","claim_type":"reported","aggregation_eligible":false,"basis":"Reported requested supply capacity. Basis (grid import versus IT) not confirmed by the developer.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"latest_change":{"date":"2026-10-18","summary":"Microsoft reported to have withdrawn as customer (Telegraph via Reuters and the Guardian). Not confirmed by Microsoft, which declined to comment.","source_url":"https://www.theguardian.com/uk-news/2026/oct/18/microsoft-drops-huge-ai-datacentre-project-in-essex-over-power-supply-concerns","event_id":"ev-2026-10-18-microsoft-nscale-loughton"},"changes":[{"date":"2026-09-24","summary":"Reported grid delay: power not expected until early to mid 2030s","source_url":"https://www.theguardian.com/technology/2026/sep/24/construction-largest-supercomputer-delayed","kind":"grid"},{"date":"2026-10-18","summary":"Microsoft reported to have terminated its agreement","source_url":"https://www.theguardian.com/uk-news/2026/oct/18/microsoft-drops-huge-ai-datacentre-project-in-essex-over-power-supply-concerns","kind":"occupier","event_id":"ev-2026-10-18-microsoft-nscale-loughton"}],"notes":"Grid status \"applied\" reflects reported pending connection with UKPN. Microsoft previously named the UK site in its Fairwater blog (18 Sept 2025) as an AI datacenter using GB300 clusters.","sources":[{"url":"https://www.theguardian.com/uk-news/2026/oct/18/microsoft-drops-huge-ai-datacentre-project-in-essex-over-power-supply-concerns","title":"Microsoft pulls out of AI datacentre project in Essex over power supply concerns","publisher":"The Guardian","date_published":"2026-10-18","date_accessed":"2026-10-18","authority_type":"trade-press"},{"url":"https://www.theguardian.com/technology/2026/sep/24/construction-largest-supercomputer-delayed","title":"Launch of UK's largest AI supercomputer delayed by power supply problems","publisher":"The Guardian","date_published":"2026-09-24","date_accessed":"2026-10-18","authority_type":"trade-press"},{"url":"https://www.channelnewsasia.com/business/microsoft-pulls-out-uk-data-center-deal-nscale-telegraph-reports-6469486","title":"Microsoft pulls out of UK data center deal with Nscale, Telegraph reports (Reuters)","publisher":"CNA / Reuters","date_published":"2026-10-18","date_accessed":"2026-10-18","authority_type":"trade-press"},{"url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","title":"Inside the world's most powerful AI datacenter","publisher":"Microsoft (Official Microsoft Blog)","date_published":"2025-09-18","date_accessed":"2026-10-18","authority_type":"company"}],"type":"project","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"operator_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-kingdom"],"provenance":{"stage":{"source_url":"https://www.theguardian.com/uk-news/2026/oct/18/microsoft-drops-huge-ai-datacentre-project-in-essex-over-power-supply-concerns","as_of":"2026-10-18","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"uk-nscale-loughton--grid-connection-1","record_id":"uk-nscale-loughton","record_type":"project","metric":"grid-connection","label":null,"metric_class":"grid-connection","metric_type":"power","value_kind":"upper_bound","value":90,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"seeking up to 90MW of capacity","scope":"project","geography":null,"period":null,"asset_id":"uk-nscale-loughton","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-09-24","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.theguardian.com/technology/2026/sep/24/construction-largest-supercomputer-delayed","source_publisher":"The Guardian","source_published":"2026-09-24","last_checked":"2026-10-18","interpretation":"Reported requested supply capacity. Basis (grid import versus IT) not confirmed by the developer.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":90,"min":null,"max":null,"unit":"MW"},"rollup_class":"delayed-on-hold","rollup_eligible":false,"exclusion_reason":"Upper bound only (\"up to\"). Not added to totals.","display_value":"up to 90 MW"}],"dates":{"published":"2026-10-18","effective":null,"event":"2026-10-18","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/uk-nscale-loughton/"},{"id":"uk-qts-cambois-phase-1","status":"published","name":"QTS Cambois campus phase 1 (two data halls)","level":"phase","parent_id":"uk-qts-cambois-campus","country_id":"united-kingdom","state_region":"Northumberland, England","owner_ids":["blackstone"],"developer_ids":["qts"],"operator_ids":["qts"],"stage":"permitted","summary":"First of five construction phases at the QTS Cambois campus near Blyth. Northumberland County Council's strategic planning committee unanimously approved reserved matters for two data halls and associated works (access roads, landscaping, security) on 2 December 2025. Each hall is reported at about 34 m tall with eight electricity lines and 55 diesel generators for backup. Capacity and opening date for this phase are not disclosed in the sources reviewed.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o"},"latest_change":{"date":"2025-12-02","summary":"Reserved matters approved for phase 1","source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o"},"power_architecture":{"summary":"Eight separate electricity lines and 55 diesel-powered generators per data hall reported.","source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o"},"sources":[{"url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o","title":"Blyth data centre first phase works given go-ahead","publisher":"BBC News (Local Democracy Reporting Service)","date_published":"2025-12-02","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-kingdom"],"provenance":{"stage":{"source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o","as_of":"2025-12-02","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","metric_claims":[],"claims":[],"dates":{"published":"2025-12-02","effective":null,"event":"2025-12-02","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/uk-qts-cambois-phase-1/"},{"id":"uk-qts-cambois-campus","status":"published","name":"QTS Cambois data centre campus (Blyth, Northumberland)","level":"campus","country_id":"united-kingdom","state_region":"Northumberland, England","owner_ids":["blackstone"],"developer_ids":["qts"],"operator_ids":["qts"],"stage":"under-construction","summary":"Data centre campus planned by QTS, Blackstone's data centre business, on the former Britishvolt and Blyth Power Station land at Cambois. Northumberland County Council granted outline permission in March 2025 for up to 10 data centre buildings on more than 133 acres (540,000 sq m), with Blackstone citing a £10bn development. The first reserved-matters phase was approved on 2 December 2025, initial earthworks started in October 2025, and BBC reported earlier planning documents pointing to around 2035 for the final phase. Electrical capacity has not been disclosed in the sources reviewed.","investor_ids":["blackstone"],"expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o"},"metric_claims":[{"value":10,"unit":"currency","original_wording":"£10bn development","metric_class":"investment","stage":"announced","scope":"campus","as_of":"2025-03-05","source_url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","claim_type":"reported","aggregation_eligible":false,"basis":"Headline development value for the whole campus as reported. Period not stated.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"GBP"},{"value":540000,"unit":"m2","original_wording":"10 buildings constructed over more than 133 acres (540,000 sq m)","metric_class":"area","stage":"permitted","scope":"campus","as_of":"2025-03-05","source_url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","claim_type":"reported","aggregation_eligible":false,"basis":"Site area under outline permission, not floor area.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"latest_change":{"date":"2025-12-02","summary":"Phase 1 reserved matters (two data halls) approved","source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o"},"power_architecture":{"summary":"Each data hall reported to require eight separate electricity lines and 55 diesel generators for emergency power (planning committee reporting).","source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o"},"cooling_architecture":null,"notes":"Investment unit: value 10 with unit currency means GBP 10 billion.","sources":[{"url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","title":"Council approves £10bn data centre at former Britishvolt site","publisher":"BBC News","date_published":"2025-03-05","date_accessed":"2026-10-18","authority_type":"trade-press"},{"url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o","title":"Blyth data centre first phase works given go-ahead","publisher":"BBC News (Local Democracy Reporting Service)","date_published":"2025-12-02","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"occupier_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-kingdom"],"provenance":{"stage":{"source_url":"https://www.bbc.co.uk/news/articles/clyd1enx3p4o","as_of":"2025-12-02","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"uk-qts-cambois-campus--investment-1","record_id":"uk-qts-cambois-campus","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":10,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"GBP","original_wording":"£10bn development","scope":"campus","geography":null,"period":null,"asset_id":"uk-qts-cambois-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-03-05","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","source_publisher":"BBC News","source_published":"2025-03-05","last_checked":"2026-10-18","interpretation":"Headline development value for the whole campus as reported. Period not stated.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":10000000000,"min":null,"max":null,"unit":"GBP"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: Headline development value for the whole campus as reported. Period not stated.","display_value":"GBP 10 billion"},{"claim_id":"uk-qts-cambois-campus--area-2","record_id":"uk-qts-cambois-campus","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"lower_bound","value":540000,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"10 buildings constructed over more than 133 acres (540,000 sq m)","scope":"campus","geography":null,"period":null,"asset_id":"uk-qts-cambois-campus","claim_stage":"permitted","delivery_state":"permitted","delivery_evidence":null,"claim_date":"2025-03-05","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","source_publisher":"BBC News","source_published":"2025-03-05","last_checked":"2026-10-18","interpretation":"Site area under outline permission, not floor area.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":540000,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"at least 540,000 sq m"}],"dates":{"published":"2025-12-02","effective":null,"event":"2025-12-02","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/uk-qts-cambois-campus/"},{"id":"sg-jurong-island-dc-cfa2-stt-gdc","status":"published","name":"ST Telemedia Global Data Centres DC-CFA2 data centre (Jurong Island, Singapore)","level":"project","country_id":"singapore","state_region":"Jurong Island","metro_id":"singapore-metro","developer_ids":["st-telemedia-global-data-centres"],"operator_ids":["st-telemedia-global-data-centres"],"stage":"provisional-allocation","summary":"ST Telemedia Global Data Centres was one of four operators provisionally allocated 50 MW of data centre capacity by EDB and IMDA on 21 August 2026 under the second Data Centre Call for Application (DC-CFA2). DC-CFA2 data centres will be located on Jurong Island, where JTC is developing a low-carbon data centre park. Selected proposals committed to power at least 50% of capacity from green pathways such as biomethane, low-carbon ammonia or hydrogen, or building-integrated PV, to use liquid cooling and 100% energy-efficient IT equipment, and to meet Green Mark for Data Centres Platinum. Site, design and timing details for this project are not yet published.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"metric_claims":[{"value":50,"unit":"MW","original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","metric_class":"it-power","stage":"allocated-provisional","scope":"project","as_of":"2026-08-21","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","claim_type":"reported","aggregation_eligible":true,"basis":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","delivery_state":"allocated-provisional"}],"cooling_architecture":{"summary":"Liquid cooling committed as part of the DC-CFA2 award (programme-level requirement, design not published).","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"power_architecture":{"summary":"At least 50% of capacity to be powered via green energy pathways (programme commitment). Specific pathway for this project not disclosed.","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"policy_ids":["sg-dc-cfa2-allocation-2026","sg-green-data-centre-roadmap"],"technology_ids":["direct-liquid-cooling"],"latest_change":{"date":"2026-08-21","summary":"Provisional allocation of 50 MW","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf"},"notes":"Stage \"permitted\" represents a provisional government capacity allocation, not a building permit.","sources":[{"url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","title":"Fact sheet: Four data centre proposals selected as part of DC-CFA2","publisher":"EDB and IMDA","date_published":"2026-08-21","date_accessed":"2026-10-18","authority_type":"government"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"cloud_region_ids":[],"country_ids":["singapore"],"provenance":{"stage":{"source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","as_of":"2026-08-21","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","planning_status":"not disclosed","revisions":[{"id":"corr-2026-10-18-dc-cfa2-provisional","date":"2026-10-18","summary":"Stage corrected from Permitted to Provisional capacity allocation. EDB and IMDA provisionally allocated 50 MW to each operator on 21 August 2026. A provisional allocation is not planning permission and not built capacity. Planning status is not disclosed.","before":"Stage shown as Permitted and the 50 MW counted as permitted capacity.","source_url":"https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html","source_date":"2026-08-21"}],"claims":[{"claim_id":"sg-jurong-island-dc-cfa2-stt-gdc--it-power-1","record_id":"sg-jurong-island-dc-cfa2-stt-gdc","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-stt-gdc","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"}],"dates":{"published":"2026-08-21","effective":null,"event":"2026-08-21","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/sg-jurong-island-dc-cfa2-stt-gdc/"},{"id":"ae-stargate-uae-cluster","status":"published","name":"Stargate UAE AI infrastructure cluster (1 GW)","level":"campus","parent_id":"ae-uae-us-ai-campus","country_id":"united-arab-emirates","state_region":"Abu Dhabi","metro_id":"abu-dhabi","developer_ids":["khazna"],"operator_ids":["khazna"],"stage":"under-construction","summary":"1 GW AI infrastructure cluster developed by Khazna Data Centers, a G42 company, inside the UAE-US AI Campus. Announced in May 2025 with OpenAI, Oracle, NVIDIA, Cisco and SoftBank as partners. In October 2025 G42 said design and civil works were well advanced, all long-lead equipment had been procured and first mechanical deliveries had arrived. Reuters describes it as a $30 billion first phase of the wider campus.","metric_claims":[{"value":1,"unit":"GW","original_wording":"a 1GW large-scale AI infrastructure cluster","metric_class":"other","stage":"announced","scope":"campus","as_of":"2025-10-16","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","claim_type":"reported","aggregation_eligible":false,"basis":"Cluster capacity in GW. Basis not defined. Parent campus 5 GW includes it.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"},{"value":30,"unit":"currency","original_wording":"a $30-billion, 1-gigawatt compute cluster known as Stargate UAE","metric_class":"investment","stage":"announced","scope":"campus","as_of":"2026-09-11","source_url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","claim_type":"reported","aggregation_eligible":false,"basis":"USD billions as reported by Reuters. Not confirmed by G42 in sources reviewed.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"USD"}],"latest_change":{"date":"2025-10-16","summary":"Construction progress update by G42","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae"},"sources":[{"url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","title":"G42 advances construction of Stargate UAE AI infrastructure cluster","publisher":"Emirates News Agency (WAM)","date_published":"2025-10-16","date_accessed":"2026-10-18","authority_type":"government"},{"url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","title":"Reuters wire (syndicated): UAE revises AI data center plan","publisher":"Internazionale (Reuters syndication)","date_published":"2026-09-11","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"owner_ids":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-arab-emirates"],"provenance":{"stage":{"source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","as_of":"2025-10-16","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"ae-stargate-uae-cluster--other-1","record_id":"ae-stargate-uae-cluster","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":1,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"a 1GW large-scale AI infrastructure cluster","scope":"campus","geography":null,"period":null,"asset_id":"ae-stargate-uae-cluster","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-10-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","source_publisher":"Emirates News Agency (WAM)","source_published":"2025-10-16","last_checked":"2026-10-18","interpretation":"Cluster capacity in GW. Basis not defined. Parent campus 5 GW includes it.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"1 GW"},{"claim_id":"ae-stargate-uae-cluster--investment-2","record_id":"ae-stargate-uae-cluster","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":30,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"a $30-billion, 1-gigawatt compute cluster known as Stargate UAE","scope":"campus","geography":null,"period":null,"asset_id":"ae-stargate-uae-cluster","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-09-11","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","source_publisher":"Internazionale (Reuters syndication)","source_published":"2026-09-11","last_checked":"2026-10-18","interpretation":"USD billions as reported by Reuters. Not confirmed by G42 in sources reviewed.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":30000000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: USD billions as reported by Reuters. Not confirmed by G42 in sources reviewed.","display_value":"USD 30 billion"}],"dates":{"published":"2026-09-11","effective":null,"event":"2025-10-16","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/ae-stargate-uae-cluster/"},{"id":"ae-stargate-uae-phase-1","status":"published","name":"Stargate UAE first 200 MW","level":"phase","parent_id":"ae-stargate-uae-cluster","country_id":"united-arab-emirates","state_region":"Abu Dhabi","metro_id":"abu-dhabi","developer_ids":["khazna"],"operator_ids":["khazna"],"occupier_ids":[],"stage":"under-construction","summary":"First 200 MW of the 1 GW Stargate UAE cluster, built by Khazna on an accelerated timeline. G42 said in October 2025 that construction was well underway toward planned 2026 delivery, with modular components in production and mechanical systems delivered to site. Reuters in September 2026 still described the first 200 MW as due online in 2026. No primary confirmation of operation was found by 18 October 2026.","expected_operating_date":{"value":"2026","confidence":"announced","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae"},"metric_claims":[{"value":200,"unit":"MW","original_wording":"building the first 200MW of the 1GW mega-scale infrastructure","metric_class":"other","stage":"under-construction","scope":"phase","as_of":"2025-10-16","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","claim_type":"reported","aggregation_eligible":false,"basis":"Phase capacity, basis not defined (IT or facility). Included in parent 1 GW.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"}],"latest_change":{"date":"2025-10-16","summary":"Long-lead equipment procured, mechanical deliveries on site","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae"},"sources":[{"url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","title":"G42 advances construction of Stargate UAE AI infrastructure cluster","publisher":"Emirates News Agency (WAM)","date_published":"2025-10-16","date_accessed":"2026-10-18","authority_type":"government"},{"url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","title":"Reuters wire (syndicated): UAE revises AI data center plan","publisher":"Internazionale (Reuters syndication)","date_published":"2026-09-11","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"owner_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-arab-emirates"],"provenance":{"stage":{"source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","as_of":"2025-10-16","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"ae-stargate-uae-phase-1--other-1","record_id":"ae-stargate-uae-phase-1","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"building the first 200MW of the 1GW mega-scale infrastructure","scope":"phase","geography":null,"period":null,"asset_id":"ae-stargate-uae-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2025-10-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","source_publisher":"Emirates News Agency (WAM)","source_published":"2025-10-16","last_checked":"2026-10-18","interpretation":"Phase capacity, basis not defined (IT or facility). Included in parent 1 GW.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"200 MW"}],"dates":{"published":"2026-09-11","effective":null,"event":"2025-10-16","expected_operation":"2026","last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/ae-stargate-uae-phase-1/"},{"id":"ae-uae-us-ai-campus","status":"published","name":"UAE-US AI Campus (Abu Dhabi)","level":"campus","country_id":"united-arab-emirates","state_region":"Abu Dhabi","metro_id":"abu-dhabi","developer_ids":["g42"],"stage":"under-construction","summary":"5 GW AI campus announced in May 2025 during the US presidential visit, led by G42 and hosting the 1 GW Stargate UAE cluster built by Khazna. Reuters reported on 11 September 2026, citing six unnamed sources, that the UAE is revising the plan after the Iran conflict: the originally envisaged single 26 sq km campus in Abu Dhabi will likely become a network of data centres spread across the UAE, with added protection such as air defences and some underground construction. No official revised masterplan has been published, so the campus definition may change.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say"},"metric_claims":[{"value":5,"unit":"GW","original_wording":"within the 5GW UAE–U.S. AI Campus in Abu Dhabi","metric_class":"other","stage":"announced","scope":"campus","as_of":"2025-10-16","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","claim_type":"reported","aggregation_eligible":false,"basis":"Headline campus capacity in GW. Electrical basis not defined by the source.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"conflicting","conflict_note":"Reuters (Sept 2026) reports the single-site campus plan is being revised into a distributed network. Status pending official confirmation."}],"latest_change":{"date":"2026-09-11","summary":"Reuters reports plan being revised toward distributed sites (unconfirmed officially)","source_url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say"},"sources":[{"url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","title":"G42 advances construction of Stargate UAE AI infrastructure cluster","publisher":"Emirates News Agency (WAM)","date_published":"2025-10-16","date_accessed":"2026-10-18","authority_type":"government"},{"url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","title":"Reuters wire (syndicated): UAE revises AI data center plan","publisher":"Internazionale (Reuters syndication)","date_published":"2026-09-11","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","commercial_availability":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"owner_ids":[],"operator_ids":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["united-arab-emirates"],"provenance":{"stage":{"source_url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","as_of":"2026-09-11","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"ae-uae-us-ai-campus--other-1","record_id":"ae-uae-us-ai-campus","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":5,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"within the 5GW UAE–U.S. AI Campus in Abu Dhabi","scope":"campus","geography":null,"period":null,"asset_id":"ae-uae-us-ai-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-10-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"disputed","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","source_publisher":"Emirates News Agency (WAM)","source_published":"2025-10-16","last_checked":"2026-10-18","interpretation":"Headline campus capacity in GW. Electrical basis not defined by the source.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"conflicting","kind":"metric","normalised":{"value":5,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"5 GW"}],"dates":{"published":"2026-09-11","effective":null,"event":"2026-09-11","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/ae-uae-us-ai-campus/"},{"id":"ie-vantage-dub11-profile-park","status":"published","name":"Vantage DUB11 Profile Park campus (Clondalkin, Dublin)","level":"campus","country_id":"ireland","state_region":"South Dublin","metro_id":"dublin","owner_ids":["vantage"],"developer_ids":["vantage"],"operator_ids":["vantage"],"stage":"delayed","commercial_availability":"pre-leased","summary":"Two-building Vantage Data Centers campus on a nine hectare site at Profile Park, Clondalkin, permitted in 2022, with construction from early 2023. The Irish Times reported in July 2026, from company filings for Vantage Data Centers Dub11 Limited, that the project will deliver 52 MW of IT load across 38,000 sq m and that a €151.7 million impairment was booked in 2025 for expected service-level credits to tenants because of delayed ready-for-service dates. Tenants are secured but not named. Accumulated project costs before impairment were €972.2 million.","expected_operating_date":{"value":null,"confidence":"unknown","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/"},"metric_claims":[{"value":52,"unit":"MW","original_wording":"will deliver 52 megawatts of IT load","metric_class":"it-power","stage":"under-construction","scope":"campus","as_of":"2026-07-24","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","claim_type":"reported","aggregation_eligible":true,"basis":"IT load as reported from filings.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none"},{"value":972.2,"unit":"currency","original_wording":"accumulated project costs were €972.2 million","metric_class":"investment","stage":"under-construction","scope":"campus","as_of":"2025-12-31","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","claim_type":"reported","aggregation_eligible":false,"basis":"Accumulated cost to end 2025 before impairment, EUR millions. Project described as a €1 billion development.","reviewer":"CoolPower Index research (automated, sourced)","last_checked":"2026-10-18","conflict_status":"none","currency":"EUR"}],"latest_change":{"date":"2026-07-24","summary":"Filings show €151.7m impairment for delayed delivery","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/"},"sources":[{"url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","title":"Vantage faces €152m compensation bill to tenants over delayed Dublin data centre project","publisher":"The Irish Times","date_published":"2026-07-24","date_accessed":"2026-10-18","authority_type":"trade-press"}],"type":"project","grid_status":"not-disclosed","cooling_architecture":null,"power_architecture":null,"contractors":[],"supplier_links":[],"occupier_ids":[],"investor_ids":[],"policy_ids":[],"technology_ids":[],"cloud_region_ids":[],"country_ids":["ireland"],"provenance":{"stage":{"source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","as_of":"2026-07-24","basis":"latest cited source","checked":"2026-10-18"}},"last_checked":"2026-10-18","reviewer":"CoolPower Index research (automated, sourced)","claims":[{"claim_id":"ie-vantage-dub11-profile-park--it-power-1","record_id":"ie-vantage-dub11-profile-park","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":52,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"will deliver 52 megawatts of IT load","scope":"campus","geography":null,"period":null,"asset_id":"ie-vantage-dub11-profile-park","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-07-24","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","source_publisher":"The Irish Times","source_published":"2026-07-24","last_checked":"2026-10-18","interpretation":"IT load as reported from filings.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":52,"min":null,"max":null,"unit":"MW"},"rollup_class":"delayed-on-hold","rollup_eligible":true,"exclusion_reason":null,"display_value":"52 MW"},{"claim_id":"ie-vantage-dub11-profile-park--investment-2","record_id":"ie-vantage-dub11-profile-park","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":972.2,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"EUR","original_wording":"accumulated project costs were €972.2 million","scope":"campus","geography":null,"period":null,"asset_id":"ie-vantage-dub11-profile-park","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2025-12-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","source_publisher":"The Irish Times","source_published":"2026-07-24","last_checked":"2026-10-18","interpretation":"Accumulated cost to end 2025 before impairment, EUR millions. Project described as a €1 billion development.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":972200000,"min":null,"max":null,"unit":"EUR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: Accumulated cost to end 2025 before impairment, EUR millions. Project described as a €1 billion development.","display_value":"EUR 972.2 million"}],"dates":{"published":"2026-07-24","effective":null,"event":"2026-07-24","expected_operation":null,"last_checked":"2026-10-18","next_review":"2026-10-25","review_cadence_days":7},"url":"https://coolpowerindex.com/projects/ie-vantage-dub11-profile-park/"}]}