Data4 and Brookfield e-Valley AI campus (Cambrai, former Air Base 103)

PlanningFranceHauts-de-France

DCmag reported on 19 October 2026 a second land approval for the e-Valley campus at Cambrai. It says the first announcements in February 2025 spoke of up to 1 GW and more than EUR 10 billion, that the 2025 plan gave at least 300 MW of electrical capacity in the short term, and that in June 2026 Brookfield described about 23 hectares and three buildings over three to five years for about EUR 10 billion over five to ten years. A tender of April 2026 covers medium voltage grid extensions for four customer substations.

Reported figures

Reported figures for Data4 and Brookfield e-Valley AI campus (Cambrai, former Air Base 103)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
at least 300 MW
Third-party reported
Lower bound
Otherbasis unclear
Short term electrical capacity, lower bound, as reported
Source wording: "au moins 300 MW de capacité électrique à court terme"
Planned
Stage stated in source: Planned
campus
19 Oct 2026
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.dcmag.fr (opens in a new tab)
up to 1,000 MW
Third-party reported
Upper bound
Otherbasis unclear
Initial February 2025 ambition, upper bound, as reported
Source wording: "une capacité pouvant atteindre 1 GW"
Planned
Stage stated in source: Target
campus
19 Oct 2026
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.dcmag.fr (opens in a new tab)
about EUR 10 billion
Third-party reported
Approximate
10,000,000,000 EUR
Investment
EUR billions over five to ten years as described in June 2026
Source wording: "un investissement estimé à 10 milliards d’euros sur cinq à dix ans"
Announced
Stage stated in source: Announced
campus
19 Oct 2026
No. Marked not summable by research: EUR billions over five to ten years as described in June 2026dcmag.fr (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Power and grid

April 2026 tender for medium voltage grid extensions to four customer substations, as reported by DCmag. dcmag.fr (opens in a new tab)

What changed

  1. 19 Oct 2026 Second land approval reported Third-party reported dcmag.fr (opens in a new tab)
Sources (1), last checked 19 Oct 2026
  1. Cambrai : le méga data center e-Valley de Data4 et Brookfield reçoit un second feu vert foncier (opens in a new tab), DCmag, published 19 Oct 2026, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.