Project record, campus
NEXTDC S7 data centre (Eastern Creek, Sydney)
State significant development application on the NSW Planning Portal for construction and operation of a NEXTDC data centre at Eastern Creek with an operational capacity of 612 MW in three two-storey buildings, 340 backup diesel generators and an on-site substation. The project is in assessment. The application also covers diesel fuel storage, site works and car parking.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 612 MW Official source | Otherbasis unclear Capacity in the planning application, basis not stated Source wording: "operational capacity of 612 MW" | Planned Stage stated in source: Planned | campus 2026 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | planningportal.nsw.gov.au (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Power and grid
On-site substation and 340 backup diesel generators in the application. planningportal.nsw.gov.au (opens in a new tab)
Sources (1), last checked 19 Oct 2026
- NEXTDC S7 data centre, Eastern Creek (SSD-113934740) (opens in a new tab), NSW Planning Portal, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.