Kasi LOS1 data centre (Lagos)
Kasi Cloud launched LOS1 in Lagos in May 2026, the first of four planned buildings, which THISDAY described as the largest data centre in West Africa. The report cites 100 MW of power capacity with 8 MW per floor and 32 MW across four floors, without making clear how the figures relate. Cooling is an N+2 chilled-water system that is liquid ready.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 32 MW Third-party reported | Otherbasis unclear As reported. The same article cites 100 MW of power capacity, basis unclear Source wording: "eight megawatts dedicated to each floor, 32 MW total for the four floors" | Operating Stage stated in source: Commissioned | building 18 May 2026 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | thisdaylive.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Cooling
N+2 chilled-water system, liquid ready for AI workloads. thisdaylive.com (opens in a new tab)
What changed
- 19 May 2026 LOS1 launched thisdaylive.com (opens in a new tab)
Sources (1), last checked 19 Oct 2026
- Kasi set to launch hyperscale AI-ready data centres in Lagos (opens in a new tab), THISDAY, published 18 May 2026, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.