Electricity use, efficiency, density, cooling, market, spending, grid and water figures for data centres. Every figure shows who published it, when, what it measures and whether it is an official statistic, an estimate, a projection, a survey, a market report or a company filing. Updated 31 Oct 2026.
Figures from different sources measure different things. They are shown side by side and never added together. Where a figure is not publicly reported, we say so.
Data centre statistics at a glance
48
sourced figures in 9 topics, each with its date, basis and status
45
quarters of hyperscaler capex taken from SEC filings, shown company by company
12
different publishers, from statistics offices and grid operators to surveys and market reports
Confirmed
23%
Data centre share of metered electricity consumption, Ireland, 2025 (Central Statistics Office)
Ireland 23% (2025)
United States about 4.4% (2023)
Germany about 4% (2025)
United States 6.7% to 12% (2028, projection)
Six headline figures
- around 415 TWh: Global data centre electricity consumption, World, 2024 (International Energy Agency, Published estimate)
- around 945 TWh: Global data centre electricity consumption, Base Case projection, World, 2030 (International Energy Agency, Projection or forecast)
- 1.54: Weighted average annual PUE, Global survey sample, 2025 (Uptime Institute, Survey result)
- almost 9 kW: Average of modal rack densities, total sample, Global survey sample, 2025 (Uptime Institute, Survey result)
- about 474 GW: Large loads seeking interconnection, Texas (ERCOT), June 2026 (ERCOT, Official statistic or regulator figure)
- 66 billion litres: US data centre direct water consumption, United States, 2023 (Lawrence Berkeley National Laboratory, Published estimate)
- 9Electricity use
- 5National share of electricity
- 3Power usage effectiveness (PUE)
- 5Rack density
- 2Liquid cooling adoption
- 15Colocation vacancy and pricing
- 5Hyperscaler capital expenditure (companies)
- 4Grid connection queues
- 5Water
Each bar counts the figures in one topic, coloured by what kind of figure it is: an official statistic, an estimate, a projection, a survey or a market report. It shows how solid the evidence is for each topic, not the size of anything. Click a type in the legend to hide or show it.
Source: the figures in the tables on this page, updated 31 Oct 2026. Hyperscaler capex quarters are counted separately above.
Show the data as a table
| Topic | Official statistic or regulator figure | Published estimate | Projection or forecast | Survey result | Commercial market report | Company report | All figures |
|---|---|---|---|---|---|---|---|
| Electricity use | 1 | 1 | 7 | 0 | 0 | 0 | 9 |
| National share of electricity | 3 | 0 | 2 | 0 | 0 | 0 | 5 |
| Power usage effectiveness (PUE) | 0 | 0 | 0 | 3 | 0 | 0 | 3 |
| Rack density | 0 | 0 | 0 | 4 | 1 | 0 | 5 |
| Liquid cooling adoption | 0 | 0 | 0 | 2 | 0 | 0 | 2 |
| Colocation vacancy and pricing | 0 | 0 | 0 | 0 | 15 | 0 | 15 |
| Grid connection queues | 4 | 0 | 0 | 0 | 0 | 0 | 4 |
| Water | 0 | 3 | 1 | 0 | 0 | 1 | 5 |
Electricity use
How much electricity data centres use, globally, by region and by country, with each source's own scope. Estimates for the same place differ because sources count different facilities and years.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| Global data centre electricity consumption | World | 2024 | around 415 TWh | Data centre electricity consumption, IEA estimate. Published estimate From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| Global data centre electricity consumption, Base Case projection | World | 2030 | around 945 TWh | IEA Base Case projection of data centre electricity consumption. Projection or forecast From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| Global data centre electricity consumption, Base Case projection | World | 2035 | around 1,200 TWh | IEA Base Case projection of data centre electricity consumption. Projection or forecast From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| Growth in data centre electricity consumption, 2024 to 2030 | United States | 2024 to 2030 (increase) | around +240 TWh | IEA Base Case increase in US data centre electricity consumption (plus 130%). Projection or forecast From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| Growth in data centre electricity consumption, 2024 to 2030 | China | 2024 to 2030 (increase) | around +175 TWh | IEA Base Case increase in China data centre electricity consumption (plus 170%). Projection or forecast From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| Growth in data centre electricity consumption, 2024 to 2030 | Europe | 2024 to 2030 (increase) | more than +45 TWh | IEA Base Case increase in European data centre electricity consumption (plus 70%). Europe only. Projection or forecast From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| Growth in data centre electricity consumption, 2024 to 2030 | Japan | 2024 to 2030 (increase) | around +15 TWh | IEA Base Case increase in Japan data centre electricity consumption (plus 80%). Projection or forecast From the hyperscaler hub dataset. | International Energy Agency: Energy and AI: energy demand from AI (opens in a new tab) Published 10 Apr 2025. Accessed 19 Oct 2026. |
| EU data centre electricity consumption | European Union | 2024 | 68 TWh | Commission figure. Official statistic or regulator figure | European Commission: COM(2026) 500, transmitted to the Council as document 13443/26 (opens in a new tab) Published 21 Sept 2026. Accessed 19 Oct 2026. |
| EU data centre electricity consumption, projection | European Union | 2030 | 114 TWh | Projection, 3.2% of EU electricity demand in 2030. Projection or forecast | European Commission: COM(2026) 500, transmitted to the Council as document 13443/26 (opens in a new tab) Published 21 Sept 2026. Accessed 19 Oct 2026. |
National figures on our market pages
These come from the country records and update with them. 20 regional and national electricity figures, including GB, Norway, Sweden and Australia, are on the hyperscaler and cloud market hub.
| Country | Indicator | Value | Period | Source |
|---|---|---|---|---|
| Germany | Data centre electricity consumption About 4% of gross electricity consumption. | 21 TWh | 2025 | BMFTR (opens in a new tab) |
| Ireland | Data centre share of metered electricity consumption | 23% | 2025 | Central Statistics Office (opens in a new tab) |
| Ireland | Data centre metered electricity consumption 2024 restated as 6,973 GWh in the 2025 release (6,969 GWh in the 2024 release). | 7,663 GWh | 2025 | Central Statistics Office (opens in a new tab) |
| Ireland | Forecast data centre electricity demand EirGrid forecast cited by CRU, from 9.4 TWh in 2025. | 14.6 TWh | 2034 | Commission for Regulation of Utilities (opens in a new tab) |
| Malaysia | Data centres' share of Johor's total power consumption (third-party estimate) Share of the state's total electricity consumption | 24% | 2026 | The Guardian (opens in a new tab) |
| United States | Data centre electricity consumption About 4.4% of total US electricity. | 176 TWh | 2023 | US Department of Energy (opens in a new tab) |
| United States | Projected data centre electricity consumption (range) Range of 325 to 580 TWh, 6.7% to 12% of US electricity. Projection. | 325 to 580 TWh | 2028 | US Department of Energy (opens in a new tab) |
Europe and the EU: two sources, two scopes
European Commission, 2024
68 TWh
EU data centre electricity consumption, European Union
Commission figure
European Commission, 2030
114 TWh
EU data centre electricity consumption, projection, European Union
Projection, 3.2% of EU electricity demand in 2030
International Energy Agency, 2024 to 2030 (increase)
more than +45 TWh
Growth in data centre electricity consumption, 2024 to 2030, Europe
IEA Base Case increase in European data centre electricity consumption (plus 70%). Europe only
The Commission counts the 27 EU countries. The IEA region "Europe" is wider. The figures are shown side by side and not reconciled.
Not shown
- A 2024 IEA total for Europe in TWh is not stated in the text we checked, only the growth to 2030.
- The EU Joint Research Centre estimate is not shown because its publication page could not be checked.
Power usage effectiveness (PUE)
PUE is total facility energy divided by IT energy. A lower figure means less overhead for cooling and power conversion. Survey averages hide wide variation by size, age and climate.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| Industry average PUE | Global survey sample | 2007 | 2.5 | Survey average stated in report text. Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
| Industry average PUE | Global survey sample | 2014 | 1.65 | Survey average stated in report text. Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
| Weighted average annual PUE | Global survey sample | 2025 | 1.54 | Weighted average of respondents' annual PUE, n=681. The sixth year in a row it has "virtually stood still". Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
Not shown
- Operator-reported fleet PUE is on each operator's page where we hold it, and is not averaged here.
Rack density
How much power a typical rack draws. Survey averages are still in single digits even as AI racks reach well above 100 kW, so both views are shown.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| Average of modal rack densities, total sample | Global survey sample | 2024 | 8.3 kW | Survey average. Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
| Average of modal rack densities, total sample | Global survey sample | 2025 | almost 9 kW | Survey average. Uptime says "almost 9 kW". Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
| Average of modal rack densities, excluding facilities at 30 kW or more | Global survey sample | 2024 | 6.8 kW | Survey average. Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
| Average of modal rack densities, excluding facilities at 30 kW or more | Global survey sample | 2025 | 7.5 kW | Survey average. Survey result | Uptime Institute: Global Data Center Survey 2025 (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
| Typical design density of existing data centres | Hong Kong | Q1 2026 | 5 to 15 kW | Market report, compared with "40-kW-plus" for AI workloads. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
Not shown
- Vendor rack figures for AI systems are on the chip power page, not repeated here.
Liquid cooling adoption
How many operators use direct liquid cooling (DLC), from the largest public survey we could check.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| Respondents whose organisation makes some use of DLC | Global survey sample | 2024 | 22% | Survey. Survey result | Uptime Institute: Cooling Systems Survey 2024: Direct liquid cooling (opens in a new tab) Published 30 May 2024. Accessed 19 Oct 2026. |
| Respondents not using DLC but who would consider it | Global survey sample | 2024 | 61% | Survey. Survey result | Uptime Institute: Cooling Systems Survey 2024: Direct liquid cooling (opens in a new tab) Published 30 May 2024. Accessed 19 Oct 2026. |
Not shown
- Nearly half of DLC users said less than 10% of their racks use DLC. Uptime does not give an exact share in the public summary.
- The 2025 Cooling Systems Survey results are behind a paywall, so they are not shown.
- The share of installed capacity that is liquid cooled is not publicly reported by a neutral source we could check.
Colocation vacancy and pricing
Vacancy and asking rents from commercial property advisers. Each adviser defines its markets differently, so figures for the same region do not match.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| Vacancy rate | North America, primary markets | H1 2026 | 1.4% | Wholesale primary markets. Down from 1.6% in H1 2025. Commercial market report | CBRE: North America Data Center Trends H1 2026 (opens in a new tab) Published 27 Aug 2026. Accessed 19 Oct 2026. |
| Vacancy rate | North America | H1 2026 | 1% | JLL midyear report, "sustained at 1% for the third consecutive year". Commercial market report | JLL: Data center demand exceeds expectations as H1 2026 absorption hits record 25 GW (opens in a new tab) Published 11 Aug 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Northern Virginia | Q1 2026 | 0.3% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Atlanta | Q1 2026 | 1% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Singapore | Q1 2026 | 2% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Sydney | Q1 2026 | 4.5% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Frankfurt | Q1 2026 | 5% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Tokyo | Q1 2026 | 6% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Paris | Q1 2026 | 6.7% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Europe, overall | Q1 2026 | 7.3% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Asia-Pacific, overall | Q1 2026 | 7% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | London | Q1 2026 | 8.6% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Amsterdam | Q1 2026 | 9.4% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Vacancy rate | Hong Kong | Q1 2026 | 18% | Market report. Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| North America primary market supply | North America, primary markets | H1 2026 | 10,903 MW | Market report, up 33.7% year on year. Commercial market report | CBRE: North America Data Center Trends H1 2026 (opens in a new tab) Published 27 Aug 2026. Accessed 19 Oct 2026. |
Asking rents, Q1 2026
| Market | Rent | Basis | Source |
|---|---|---|---|
| Chicago | $200 to $230 | 250 to 500 kW requirement, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Northern Virginia | $190 to $235 | 250 to 500 kW requirement, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Frankfurt | $235 to $265 | 250 to 500 kW requirement, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Europe, four major markets | $165 to $265 | 250 to 500 kW requirement, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Singapore | $403 average | Average asking rent, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Hong Kong | $295 | Asking rent, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Tokyo | $280 | Asking rent, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Sydney | $188 | Asking rent, per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| São Paulo | $130 to $190 | Per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Querétaro | $250 to $270 | Per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Santiago | $190 to $210 | Per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
| Bogotá | $150 to $230 | Per kW per month Commercial market report | CBRE: Global Data Center Trends 2026 (opens in a new tab) Published 17 Jun 2026. Accessed 19 Oct 2026. |
Rent changes, North America primary markets, H1 2026
| Requirement size | Change | Source |
|---|---|---|
| 250 to 500 kW | +4.3% | CBRE: North America Data Center Trends H1 2026 (opens in a new tab) Published 27 Aug 2026. Accessed 19 Oct 2026. |
| 500 kW to 3 MW | +7.9% | CBRE: North America Data Center Trends H1 2026 (opens in a new tab) Published 27 Aug 2026. Accessed 19 Oct 2026. |
| 3 to 10 MW | +8.3% | CBRE: North America Data Center Trends H1 2026 (opens in a new tab) Published 27 Aug 2026. Accessed 19 Oct 2026. |
| 10 MW and above | +6.7% | CBRE: North America Data Center Trends H1 2026 (opens in a new tab) Published 27 Aug 2026. Accessed 19 Oct 2026. |
North American vacancy: CBRE and JLL
CBRE, H1 2026
1.4%
Vacancy rate, North America, primary markets
Wholesale primary markets. Down from 1.6% in H1 2025
JLL, H1 2026
1%
Vacancy rate, North America
JLL midyear report, "sustained at 1% for the third consecutive year"
CBRE reports wholesale primary markets. JLL reports North America as a whole. Neither is wrong, they measure different stock.
Not shown
- Cushman & Wakefield figures are not shown because we have not checked them against a public primary page.
- JLL asking rents are not shown because we could not find them on a public JLL page.
- CBRE gives North American H1 2026 rents only as changes, the price levels are in charts we cannot read as text.
Hyperscaler capital expenditure
Cash spent on property and equipment each quarter, from the companies' own SEC filings. This is company-wide spending, not only data centres. Microsoft and Oracle use different fiscal years, so quarters are labelled with each company's own calendar and are never added together.
Values are the cash flow line "purchases of property and equipment" (XBRL PaymentsToAcquirePropertyPlantAndEquipment, or PaymentsToAcquireProductiveAssets for Amazon). Equipment obtained under finance leases is not a cash payment and is not included, so these figures can be lower than the capex a company quotes on its earnings call. Where a filing gives only a year-to-date figure, the quarter is the difference between two year-to-date figures, marked as derived.
US$51.4bn
Alphabet, Q3 2026 (ended 30 Sept 2026)
US$39.4bn
Microsoft, Q1 FY2027 (ended 30 Sept 2026)
US$77.3bn
Amazon, Q3 2026 (ended 30 Sept 2026)
US$33.9bn
Meta, Q3 2026 (ended 30 Sept 2026)
US$28.5bn
Oracle, Q1 FY2027 (ended 31 Aug 2026)
Set against operating cash flow, quarter by quarter: hyperscaler free cash flow.
Alphabet (calendar year)
| Quarter | Quarter ending | Purchases of property and equipment | Basis and status | Filing |
|---|---|---|---|---|
| Q3 2024 | 30 Sept 2024 | US$13.1 bn | Derived: year-to-date 2024-01-01 to 2024-09-30 less year-to-date to 2024-06-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 2024 | 31 Dec 2024 | US$14.3 bn | Derived: year-to-date 2024-01-01 to 2024-12-31 less year-to-date to 2024-09-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 2025 | 31 Mar 2025 | US$17.2 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 2025 | 30 Jun 2025 | US$22.4 bn | Derived: year-to-date 2025-01-01 to 2025-06-30 less year-to-date to 2025-03-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 2025 | 30 Sept 2025 | US$24.0 bn | Derived: year-to-date 2025-01-01 to 2025-09-30 less year-to-date to 2025-06-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 2025 | 31 Dec 2025 | US$27.9 bn | Derived: year-to-date 2025-01-01 to 2025-12-31 less year-to-date to 2025-09-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 2026 | 31 Mar 2026 | US$35.7 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 2026 | 30 Jun 2026 | US$44.9 bn | Derived: year-to-date 2026-01-01 to 2026-06-30 less year-to-date to 2026-03-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 2026 | 30 Sept 2026 | US$51.4 bn | Derived: year-to-date 2026-01-01 to 2026-09-30 less year-to-date to 2026-06-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 31 Oct 2026. |
Microsoft (fiscal year ending 30 June)
| Quarter | Quarter ending | Purchases of property and equipment | Basis and status | Filing |
|---|---|---|---|---|
| Q1 FY2025 | 30 Sept 2024 | US$14.9 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 FY2025 | 31 Dec 2024 | US$15.8 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 FY2025 | 31 Mar 2025 | US$16.7 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 FY2025 | 30 Jun 2025 | US$17.1 bn | Derived: year-to-date 2024-07-01 to 2025-06-30 less year-to-date to 2025-03-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 FY2026 | 30 Sept 2025 | US$19.4 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 FY2026 | 31 Dec 2025 | US$29.9 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 FY2026 | 31 Mar 2026 | US$30.9 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 FY2026 | 30 Jun 2026 | US$35.8 bn | Derived: year-to-date 2025-07-01 to 2026-06-30 less year-to-date to 2026-03-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 FY2027 | 30 Sept 2026 | US$39.4 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 31 Oct 2026. |
Amazon (calendar year)
| Quarter | Quarter ending | Purchases of property and equipment | Basis and status | Filing |
|---|---|---|---|---|
| Q3 2024 | 30 Sept 2024 | US$22.6 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 2024 | 31 Dec 2024 | US$27.8 bn | Derived: year-to-date 2024-01-01 to 2024-12-31 less year-to-date to 2024-09-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 2025 | 31 Mar 2025 | US$25.0 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 2025 | 30 Jun 2025 | US$32.2 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 2025 | 30 Sept 2025 | US$35.1 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 2025 | 31 Dec 2025 | US$39.5 bn | Derived: year-to-date 2025-01-01 to 2025-12-31 less year-to-date to 2025-09-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 2026 | 31 Mar 2026 | US$44.2 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 2026 | 30 Jun 2026 | US$54.2 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 2026 | 30 Sept 2026 | US$77.3 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 31 Oct 2026. |
Meta (calendar year)
| Quarter | Quarter ending | Purchases of property and equipment | Basis and status | Filing |
|---|---|---|---|---|
| Q3 2024 | 30 Sept 2024 | US$8.3 bn | Derived: year-to-date 2024-01-01 to 2024-09-30 less year-to-date to 2024-06-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 2024 | 31 Dec 2024 | US$14.4 bn | Derived: year-to-date 2024-01-01 to 2024-12-31 less year-to-date to 2024-09-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 2025 | 31 Mar 2025 | US$12.9 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 2025 | 30 Jun 2025 | US$16.5 bn | Derived: year-to-date 2025-01-01 to 2025-06-30 less year-to-date to 2025-03-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 2025 | 30 Sept 2025 | US$18.8 bn | Derived: year-to-date 2025-01-01 to 2025-09-30 less year-to-date to 2025-06-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 2025 | 31 Dec 2025 | US$21.4 bn | Derived: year-to-date 2025-01-01 to 2025-12-31 less year-to-date to 2025-09-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 2026 | 31 Mar 2026 | US$19.0 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 2026 | 30 Jun 2026 | US$30.1 bn | Derived: year-to-date 2026-01-01 to 2026-06-30 less year-to-date to 2026-03-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 2026 | 30 Sept 2026 | US$33.9 bn | Derived: year-to-date 2026-01-01 to 2026-09-30 less year-to-date to 2026-06-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 31 Oct 2026. |
Oracle (fiscal year ending 31 May)
| Quarter | Quarter ending | Purchases of property and equipment | Basis and status | Filing |
|---|---|---|---|---|
| Q1 FY2025 | 31 Aug 2024 | US$2.3 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 FY2025 | 30 Nov 2024 | US$4.0 bn | Derived: year-to-date 2024-06-01 to 2024-11-30 less year-to-date to 2024-08-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 FY2025 | 28 Feb 2025 | US$5.9 bn | Derived: year-to-date 2024-06-01 to 2025-02-28 less year-to-date to 2024-11-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 FY2025 | 31 May 2025 | US$9.1 bn | Derived: year-to-date 2024-06-01 to 2025-05-31 less year-to-date to 2025-02-28. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 FY2026 | 31 Aug 2025 | US$8.5 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q2 FY2026 | 30 Nov 2025 | US$12.0 bn | Derived: year-to-date 2025-06-01 to 2025-11-30 less year-to-date to 2025-08-31. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q3 FY2026 | 28 Feb 2026 | US$18.6 bn | Derived: year-to-date 2025-06-01 to 2026-02-28 less year-to-date to 2025-11-30. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q4 FY2026 | 31 May 2026 | US$16.5 bn | Derived: year-to-date 2025-06-01 to 2026-05-31 less year-to-date to 2026-02-28. Derived from company filings (difference of year-to-date figures) | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
| Q1 FY2027 | 31 Aug 2026 | US$28.5 bn | 3-month figure as filed. Company filing | SEC EDGAR filing (opens in a new tab) Accessed 19 Oct 2026. |
Source: US Securities and Exchange Commission, EDGAR XBRL company facts (10-Q and 10-K filings) (opens in a new tab). Accessed 19 Oct 2026. Full-year 2026 capex guidance (5 figures) is on the hyperscaler and cloud market hub, so it is not repeated here. Guidance and filed spending are different measures. Market share and cloud region data are on the operator pages and in cloud regions.
Not shown
- Capex spent on data centres alone is not publicly reported by these companies in their filings.
- Google Cloud, AWS and Microsoft cloud capex is not reported separately.
Grid connection queues
How much demand is waiting to connect to the grid, from grid operators and regulators. Queues count applications, not demand that will be built, and each operator defines them differently.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| Demand connection applications in the GB queue | Great Britain | mid 2025 | 125 GW | All demand types, largely data centres. Up from 41 GW in under a year. Official statistic or regulator figure | Ofgem: Ofgem acts to free grid capacity by tackling speculative data centre projects (opens in a new tab) Published 29 Jul 2026. Accessed 19 Oct 2026. |
| Large loads seeking interconnection | Texas (ERCOT) | June 2026 | about 474 GW | Large loads, about 90% data centres. Official statistic or regulator figure | ERCOT: ERCOT Update, Texas Senate panel: assessing the grid (opens in a new tab) Published 29 Jul 2026. Accessed 19 Oct 2026. |
| Batch Zero large loads conditionally included as base load | Texas (ERCOT) | September 2026 | 66.4 GW | 204 projects, conditional classification. Official statistic or regulator figure | ERCOT: Batch Zero update (opens in a new tab) Published 11 Sept 2026. Accessed 19 Oct 2026. |
| Batch Zero large loads conditionally included as studied load | Texas (ERCOT) | September 2026 | 127.9 GW | 158 projects, conditional classification. Official statistic or regulator figure The same ERCOT deck shows 125.4 GW for this group in a chart. The figure in its summary text is used here. | ERCOT: Batch Zero update (opens in a new tab) Published 11 Sept 2026. Accessed 19 Oct 2026. |
14 more national grid connection and request figures, from Norway, Finland, Austria, Spain, France, Malaysia, Brazil and others, are on the hyperscaler and cloud market hub. They are not repeated here.
Not shown
- Queue figures for EirGrid (Ireland), PJM, TenneT and Amprion are not shown yet because we have not verified them on the operator's own pages.
Water
Water used on site, mostly for cooling, and water used to generate the electricity data centres consume. Direct and indirect water are different measures.
| Figure | Where | Period | Value | Basis and status | Source |
|---|---|---|---|---|---|
| US data centre direct water consumption | United States | 2014 | 21.2 billion litres | Direct water, 64% in internal (enterprise) data centres. Published estimate | Lawrence Berkeley National Laboratory: 2024 United States Data Center Energy Usage Report (opens in a new tab) Published Dec 2024. Accessed 19 Oct 2026. |
| US data centre direct water consumption | United States | 2023 | 66 billion litres | Direct water, 84% in hyperscale and colocation. Published estimate | Lawrence Berkeley National Laboratory: 2024 United States Data Center Energy Usage Report (opens in a new tab) Published Dec 2024. Accessed 19 Oct 2026. |
| US data centre indirect water footprint | United States | 2023 | nearly 800 billion litres | Water consumed to generate the electricity used, nearly 800 billion litres. Published estimate | Lawrence Berkeley National Laboratory: 2024 United States Data Center Energy Usage Report (opens in a new tab) Published Dec 2024. Accessed 19 Oct 2026. |
| US hyperscale data centre direct water consumption, projection | United States | 2028 | 60 to 124 billion litres | Projection range. Projection or forecast | Lawrence Berkeley National Laboratory: 2024 United States Data Center Energy Usage Report (opens in a new tab) Published Dec 2024. Accessed 19 Oct 2026. |
| Google water consumption, data centres it operates and offices | Google, global | 2024 | about 31 billion litres | Company report, about 8.1 billion gallons. Excludes data centres operated by third parties. Company report | Google: 2025 Environmental Report (opens in a new tab) Published 2025. Accessed 19 Oct 2026. |
Not shown
- Water usage effectiveness (WUE) across the industry is not publicly reported by a neutral source we could check.
- Other operators' water figures are not compiled here yet.
Construction costs