Project record, campus

Scala AI City (Eldorado do Sul)

AnnouncedBrazilRio Grande do Sul

Scala Data Centers, owned by DigitalBridge, pitched an AI City campus on about 700 hectares in Eldorado do Sul near Porto Alegre that could cost R$300 billion and grow to 4.75 GW. It said it would start with a 54 MW data centre costing R$3 billion. Scala planned to open the 54 MW data centre within two years, including approvals and 12 to 18 months of construction. DCD puts total data centre capacity in Brazil at around 777 MW.

Reported figures

Reported figures for Scala AI City (Eldorado do Sul)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
up to 4.75 GW
Third-party reported
Upper bound
Otherbasis unclear
Possible campus scale, basis not stated
Source wording: "grow to 4.75GW"
Planned
Stage stated in source: Announced
campus
11 Sept 2024
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.datacenterdynamics.com (opens in a new tab)
54 MW
Third-party reported
Otherbasis unclear
First data centre, basis not stated
Source wording: "it will build a 54MW data center"
Planned
Stage stated in source: Announced
phase
11 Sept 2024
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.datacenterdynamics.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Sources (1), last checked 19 Oct 2026
  1. Scala AI City: Scala pitches $50bn Brazil data center campus of up to 4.7GW (opens in a new tab), DatacenterDynamics, published 11 Sept 2024, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.