Teraco CT2 (Cape Town)

OperatingSouth AfricaWestern Cape

Teraco completed an expansion of its CT2 data centre in Cape Town in November 2025, adding 32 MW in eight new data halls over three levels and taking CT2 to 50 MW of critical IT load. Teraco says CT2 uses a zero water closed-loop cooling system, links by diverse fibre to CT1 and supports over 7,000 interconnects across a campus connected to all subsea cables landing in the Cape region.

Reported figures

Reported figures for Teraco CT2 (Cape Town)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
50 MW
Official source
IT power
Critical IT load after expansion
Source wording: "50MW"
not disclosed
Stage stated in source: Operating
campus
10 Nov 2025
No. Marked not summable by research: Critical IT load after expansionteraco.co.za (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Sources (1), last checked 19 Oct 2026
  1. Teraco completes CT2 data centre expansion, increasing Cape Town’s hyperscale capacity to 50MW (opens in a new tab), Teraco, published 10 Nov 2025, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.