For South Africa, Daily Maverick reported in February 2026 that announced expansions would push IT load above 1,200 MW. Teraco is building JB7 with 40 MW of critical load and its own 120 MW solar plant to wheel power over the Eskom grid.

Tracked project records
3
Policy records
0
Cloud regions
0
Last checked
19 Oct 2026

Projects in South Africa Policy timeline

Overview

In Cape Town, Teraco completed its CT2 expansion in November 2025, adding 32 MW in eight new data halls and taking the facility to 50 MW of critical IT load. Microsoft announced a further ZAR 5.4 billion for cloud and AI infrastructure in South Africa by the end of 2027, without site or MW details.

Grid context

Operators are building their own renewable generation and wheeling it across the Eskom network to secure supply.

Tracked projects

ProjectLevelStageOperator or developerLatest change
Microsoft South Africa cloud and AI infrastructure expansionprojectAnnouncedMicrosoftnot disclosed
Teraco CT2 (Cape Town)campusOperatingTeraconot disclosed
Teraco JB7 (Isando campus, Ekurhuleni)campusUnder constructionTeraconot disclosed

Filter all projects by South Africa

Capacity in tracked public coverage

Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 3 published project records we track for South Africa. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.

None of the tracked project records for South Africa has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.

Figures not counted (3) and why

Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.

Hyperscaler and AI cloud activity in South Africa

3 tracked projects in South Africa, of which 1 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Europe, Middle East and Africa (EMEA) region on the hyperscaler and cloud hub.

Hyperscaler and AI cloud projects in South Africa
ProjectStageOperator, developer or ownerHyperscaler or AI tenantAnnouncedExpected
Microsoft South Africa cloud and AI infrastructure expansion
Gauteng and Western Cape
AnnouncedMicrosoftnot stated2025-03-06not stated

Capacity, forecasts and market share: South Africa

Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.

Current capacity and pipeline

Current capacity and pipeline, South Africa
FigureWhat it measuresStatePeriod or as ofSource
more than 1,200 MW
Third-party reported
IT power
IT load if announced expansions are delivered, as reported (Teraco alone nearly 190 MW of IT load today)
Source statement (paraphrased): "push IT load above 1,200 MW"
Planned2026-02-09Daily Maverick (opens in a new tab)
Published 9 Feb 2026. Accessed 19 Oct 2026.

Forecasts and scenarios

Forecast: not publicly reported by a named publisher in a source we could check.

Daily Maverick, Planned, 2026-02-09: more than 1,200 MW. Bars are separate published figures and are not added together.Daily Maverick: IT power, planned, 2026-02-09more than 1,200 MW
MW. Solid bars: current. Lighter bars: pipeline. Dashed outline bars: forecasts or scenarios. A range is drawn from its low to its high end. The data table is above.

Cloud market share

Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.

Download these 1 figures as CSV All market figures (CSV)

Cloud regions in South Africa

A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.

No cloud regions recorded.

Policy timeline

No policy records published.

Operators and developers

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.