Project record, campus

Teraco JB7 (Isando campus, Ekurhuleni)

Under constructionSouth AfricaGauteng

Hyperscale data centre with 40 MW of critical power load under construction since November 2024 at Teraco's Isando campus east of Johannesburg, funded by an R8 billion syndicated loan and scheduled for completion in 2026. It takes the Isando campus to 110 MW of critical load. Teraco is also building a 120 MW solar plant in the Free State to wheel power over the Eskom grid.

Reported figures

Reported figures for Teraco JB7 (Isando campus, Ekurhuleni)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
40 MW
Official source
IT power
Critical power load (IT) of JB7
Source wording: "40 megawatts (MW) of critical power load"
Under construction
Stage stated in source: Under construction
building
13 Nov 2024
No. Marked not summable by research: Critical power load (IT) of JB7teraco.co.za (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Power and grid

Teraco 120 MW solar PV plant in the Free State, expected online in late 2026, wheeling power across the Eskom network. teraco.co.za (opens in a new tab)

Sources (2), last checked 19 Oct 2026
  1. Teraco announces JB7 and a new R8 billion syndicated loan (opens in a new tab), Teraco, published 13 Nov 2024, accessed 19 Oct 2026
  2. Teraco commences construction on 120MW utility-scale solar power plant (opens in a new tab), Teraco, published 12 Nov 2024, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.