Project record, campus

Africa Data Centres Egypt (Vodafone Business, Elsewedy Electric, Cassava Technologies)

AnnouncedEgyptEgypt

Vodacom announced in September 2026 that Vodafone Business, Elsewedy Electric and Cassava Technologies are launching Africa Data Centres Egypt, which it calls Egypt's largest data centre and its first sovereign AI data centre. It targets an initial 20 MW within three years on a path to 200 MW. The site location is not stated in the release.

Reported figures

Reported figures for Africa Data Centres Egypt (Vodafone Business, Elsewedy Electric, Cassava Technologies)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
20 MW
Official source
Otherbasis unclear
Initial capacity. MW basis not stated
Source wording: "initial operational capacity of 20 MW within its first three years"
Planned
Stage stated in source: Planned
campus
7 Sept 2026
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.vodacom.com (opens in a new tab)
up to 200 MW
Official source
Upper bound
Otherbasis unclear
Long term target. MW basis not stated
Source wording: "expansion path toward 200 MW"
Planned
Stage stated in source: Target
campus
7 Sept 2026
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.vodacom.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Sources (1), last checked 19 Oct 2026
  1. Vodafone Business Redefines Egypt’s Largest Data Center and First Sovereign AI Data Center (opens in a new tab), Vodacom Group, published 7 Sept 2026, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.