Market profile
Egypt
In Egypt Vodafone Business, Elsewedy Electric and Cassava Technologies announced Africa Data Centres Egypt in September 2026, a sovereign AI data centre targeting 20 MW within three years and a path to 200 MW. Khazna and Benya announced a 25 MW IT data centre at Maadi Technology Park in 2023, with no later status found. No national capacity figure or forecast was checked.
- Tracked project records
- 2
- Policy records
- 0
- Cloud regions
- 0
- Last checked
- 19 Oct 2026
Grid context
No public data centre grid or demand figure was checked.
Tracked projects
| Project | Level | Stage | Operator or developer | Latest change |
|---|---|---|---|---|
| Africa Data Centres Egypt (Vodafone Business, Elsewedy Electric, Cassava Technologies) | campus | Announced | Africa Data Centres | not disclosed |
| Khazna and Benya data centre (Maadi Technology Park, Cairo) | campus | Not disclosed | Khazna Data Centers | not disclosed |
Capacity in tracked public coverage
Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 2 published project records we track for Egypt. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.
None of the tracked project records for Egypt has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.
Figures not counted (4) and why
- Africa Data Centres Egypt (Vodafone Business, Elsewedy Electric, Cassava Technologies)
- Other 20 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Other up to 200 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Khazna and Benya data centre (Maadi Technology Park, Cairo)
- IT power 25 MW: Marked not summable by research: Planned IT load
- Investment USD 250 million: Marked not summable by research: Total investment in USD millions
Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.
Hyperscaler and AI cloud activity in Egypt
2 tracked projects in Egypt, of which 0 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Europe, Middle East and Africa (EMEA) region on the hyperscaler and cloud hub.
Capacity, forecasts and market share: Egypt
Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.
Current capacity and pipeline
Operational, under construction and planned capacity: not publicly reported in a source we could check.
Forecasts and scenarios
Forecast: not publicly reported by a named publisher in a source we could check.
Cloud market share
Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.
No figures to download yet. All market figures (CSV)
Cloud regions in Egypt
A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.
No cloud regions recorded.
Policy timeline
No policy records published.
Operators and developers
- Africa Data Centres Colocation owner, Colocation operator, Developer
- Khazna Data Centers Colocation owner, Colocation operator, Developer
Sources (2), last checked 19 Oct 2026
- Vodafone Business Redefines Egypt’s Largest Data Center and First Sovereign AI Data Center (opens in a new tab), Vodacom Group, published 7 Sept 2026, accessed 19 Oct 2026
- Khazna Data Centers Plans to Enter Egypt with Benya Group (Maadi Technology Park, USD 250M) (opens in a new tab), Khazna Data Centers, published 8 May 2023, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.