AirTrunk JHB2 (Iskandar Puteri, Johor)

AnnouncedMalaysiaJohor

Second AirTrunk hyperscale campus in Malaysia, at Iskandar Puteri, Johor, scalable to more than 270 MW for public cloud and technology customers. AirTrunk says JHB1 and JHB2 together provide more than 420 MW of IT load and a combined investment of over RM9.7 billion (A$3.5 billion). JHB2 will use liquid cooling, and AirTrunk is scoping treated greywater as a recycled water supply. Two different design PUE values are published by AirTrunk (see conflict note).

Reported figures

Reported figures for AirTrunk JHB2 (Iskandar Puteri, Johor)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
at least 270 MW
Official source
Lower bound
IT power
Ultimate campus IT load, lower bound.
Source wording: "Scalable to over 270 megawatts (MW)"
Announced
Stage stated in source: Announced
campus
12 Feb 2025
Yes: Announced or design capacity (not delivered)airtrunk.com (opens in a new tab)
at least MYR 9.7 billion
Official source
Lower bound
9,700,000,000 MYR
Investment
Combined JHB1 and JHB2 investment, MYR billions. Not attributable to JHB2 alone.
Source wording: "investing over RM 9.7 billion / A$3.5 billion in Malaysia"
Announced
Stage stated in source: Announced
company
12 Feb 2025
No. Scope is company, not one physical project. Not attributable to this asset.airtrunk.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Cooling

Liquid cooling. Design PUE stated as 1.25 in the JHB2 announcement and 1.37 on the JHB2 location page. airtrunk.com (opens in a new tab)

What changed

  1. 12 Feb 2025 Announced by AirTrunk airtrunk.com (opens in a new tab)

Notes

PUE conflict: 1.25 (announcement) vs 1.37 (location page), both AirTrunk, checked 18 October 2026.

Technologies

Relevant policy

Revision history

  1. 18 Oct 2026: Announcement date corrected to 12 February 2025, the date of the AirTrunk release. 18 October 2026 was the date the page was checked, not an event.
    Before: Shown as announced on 18 October 2026.
    airtrunk.com (opens in a new tab)
Sources (2), last checked 18 Oct 2026
  1. AirTrunk grows Malaysia platform with second cloud and AI-ready data centre in Johor (JHB2) (opens in a new tab), AirTrunk, published 12 Feb 2025, accessed 18 Oct 2026
  2. JHB2 Johor Bahru (opens in a new tab), AirTrunk, accessed 18 Oct 2026

Last checked 18 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.