AirTrunk
Hyperscale data centre company founded in 2015 that develops and operates campuses across Asia-Pacific and the Middle East, with investors including Blackstone. In Malaysia it operates JHB1 in Johor Bahru (opened July 2024, 150+ MW) and is developing JHB2 at Iskandar Puteri (270+ MW), a combined investment of over RM9.7 billion. Presence in other focus countries was not verified in this review.
Footprint covered here
Verified focus-country footprint: Malaysia (Johor). Wider APME platform not catalogued.
Tracked projects
| Project | Role | Country | Stage |
|---|---|---|---|
| AirTrunk JHB1 (Johor Bahru) | Operator, Developer, Owner | Malaysia | Operating |
| AirTrunk JHB2 (Iskandar Puteri, Johor) | Operator, Developer, Owner | Malaysia | Announced |
Disclosed cooling and power technology
- cooling: Liquid cooling at JHB1 (20 MW+ in flight) and planned for JHB2. Design PUE 1.15 at JHB1. airtrunk.com (opens in a new tab)
Notes
Ownership: AirTrunk names Blackstone among its investors. Full shareholding not verified here.
Markets
Technologies
Sources (2), last checked 18 Oct 2026
- About AirTrunk (opens in a new tab), AirTrunk, accessed 18 Oct 2026
- AirTrunk JHB2 announcement (opens in a new tab), AirTrunk, accessed 18 Oct 2026
Last checked 18 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.