Project record, campus

AirTrunk JHB1 (Johor Bahru)

OperatingMalaysiaJohor

AirTrunk's first Malaysian hyperscale campus in Johor Bahru, opened in July 2024. AirTrunk lists a total capacity of 150+ MW on a 10.3 ha site with 21,900 sq m of technical data hall area in 20 data halls, 132 kV diverse high-voltage feeds and a design PUE of 1.15. AirTrunk states 20 MW+ of liquid cooling is already in flight at JHB1.

Reported figures

Reported figures for AirTrunk JHB1 (Johor Bahru)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
at least 150 MW
Inferred by CoolPower
Lower bound
IT power
Total campus capacity as listed by AirTrunk. Treated as IT load because AirTrunk describes JHB1 plus JHB2 as more than 420 MW of IT load. Lower bound.
Source wording: "a total capacity of 150+MW"
Design or ultimate capacity
Stage stated in source: Operating
campus
date not given, seen 18 Oct 2026
Yes: Announced or design capacity (not delivered)airtrunk.com (opens in a new tab)
21,900 sq m
Official source
Floor or land area
Technical data hall area of the campus as listed by AirTrunk.
Source wording: "21,900m2 of technical data hall area"
Design or ultimate capacity
Stage stated in source: Operating
campus
date not given, seen 18 Oct 2026
No. Area figures describe different things (site, floor or data hall area). Shown per record, never summed.airtrunk.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Cooling

Design PUE 1.15. Liquid cooling deployment of 20 MW+ in progress. airtrunk.com (opens in a new tab)

Power and grid

132 kV diverse high-voltage power feeds. airtrunk.com (opens in a new tab)

Notes

The campus opened in July 2024 (AirTrunk, 12 February 2025). Delivered share of the 150+ MW campus capacity not disclosed.

Technologies

Relevant policy

Revision history

  1. 18 Oct 2026: The 150+ MW figure is AirTrunk's total campus capacity. The campus opened in July 2024, but the share of the 150+ MW that is built and operating is not disclosed. The figure is now a lower bound of design capacity and is excluded from confirmed operating totals. The technical data hall area is also campus design area.
    Before: 150 MW shown as Operating and included in operating totals.
    airtrunk.com (opens in a new tab)
Sources (2), last checked 18 Oct 2026
  1. JHB1 Johor Bahru (opens in a new tab), AirTrunk, accessed 18 Oct 2026
  2. AirTrunk grows Malaysia platform with second cloud and AI-ready data centre in Johor (JHB2) (opens in a new tab), AirTrunk, published 12 Feb 2025, accessed 18 Oct 2026

Last checked 18 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.