Project record, campus
Stargate campus, Saline Township (Michigan)
Campus of more than 1 GW planned by Related Digital in Saline Township, Michigan, exclusively for Oracle as part of the OpenAI and Oracle Stargate partnership for 4.5 GW of additional capacity. Construction was expected to begin in early 2026. The design uses a closed-loop cooling system. The campus is being developed on 250 acres.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| at least 1 GW Official source Lower bound | Otherbasis unclear Campus capacity, basis not stated Source wording: "more than a gigawatt of capacity" | Planned Stage stated in source: Announced | campus 30 Oct 2025 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | related.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Cooling
Closed-loop cooling system, LEED certified design. related.com (opens in a new tab)
Sources (1), last checked 19 Oct 2026
- OpenAI, Oracle and Related Digital announce Stargate data center site in Michigan (opens in a new tab), Related Companies, published 30 Oct 2025, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.