Project record, campus

Omnia data centre at the Pecém complex (Caucaia, Ceará)

Under constructionBrazilCeará

Data centre being built by Omnia at the Pecém complex in Caucaia, with 300 MW of planned installed power. In September 2026 federal prosecutors and the public defender went to court to stop it operating until an environmental impact study and consultation with the Anacé indigenous people are carried out.

Reported figures

Reported figures for Omnia data centre at the Pecém complex (Caucaia, Ceará)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
300 MW
Disputed
Otherbasis unclear
Planned installed power, basis not stated
Source wording: "potência instalada prevista é de 300 MW"
Under construction
Stage stated in source: Under construction
campus
10 Sept 2026
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.mpf.mp.br (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Cooling

Groundwater abstraction for cooling is part of the licensed works according to the prosecutors. mpf.mp.br (opens in a new tab)

Power and grid

300 MW of planned installed power, on-site substation and diesel generators per the court filing. mpf.mp.br (opens in a new tab)

What changed

  1. 10 Sept 2026 Prosecutors seek to block operation pending impact study mpf.mp.br (opens in a new tab)
Sources (1), last checked 19 Oct 2026
  1. MPF e DPU vão à Justiça para impedir operação de data center no Complexo do Pecém (opens in a new tab), Ministério Público Federal (Ceará), published 10 Sept 2026, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.