Rack Centre LGS2 (Lagos)

OperatingNigeriaLagos

Rack Centre, a colocation operator in Lagos, announced in April 2025 that its LGS2 data centre had been commissioned with a capacity of 12 MW. Rack Centre describes the 12 MW as IT load. The build cost and the main tenants are not given. It calls LGS2 a Tier III carrier and cloud neutral facility, commissioned at its Lagos head office on 10 April 2025.

Reported figures

Reported figures for Rack Centre LGS2 (Lagos)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
12 MW
Official source
Otherbasis unclear
Facility capacity. MW basis not stated
Source wording: "12MW"
not disclosed
Stage stated in source: Commissioned
campus
10 Apr 2025
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.rack-centre.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Sources (1), last checked 19 Oct 2026
  1. Rack Centre’s LGS2 12MW Data Centre Commissioned (opens in a new tab), Rack Centre, published 10 Apr 2025, accessed 19 Oct 2026