{"api_version":"v1","schema_version":"1.1","dataset":"claims","title":"Every published numeric claim with value kind, scale, normalised value, qualification and roll-up eligibility","generated":"2026-10-18","research_imported":"2026-10-18","licence":"Editorial summaries and structured fields by CoolPower Index. Reuse with attribution and a link. Source documents remain the property of their publishers.","coverage":"Published records only. Draft records, private booking data and contacts are never included. Capacity figures are tracked public coverage, not national totals.","schema":"https://coolpowerindex.com/data/v1/schema/","count":66,"records":[{"claim_id":"germany--data-centre-it-connected-load-borderstep-1","record_id":"germany","record_type":"country","metric":"data-centre-it-connected-load-borderstep","label":"Data centre IT connected load (Borderstep estimate)","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":2980,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Germany","period":"2025","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.bmftr.bund.de/SharedDocs/Downloads/DE/2026/rechenzentrumsstrategie.pdf","source_publisher":"BMFTR","source_published":"2026-03-18","last_checked":"2026-10-18","interpretation":"Third-party estimate cited in federal strategy.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":2980,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"2,980 MW"},{"claim_id":"germany--data-centre-electricity-consumption-2","record_id":"germany","record_type":"country","metric":"data-centre-electricity-consumption","label":"Data centre electricity consumption","metric_class":"energy-use","metric_type":"energy","value_kind":"exact","value":21,"value_min":null,"value_max":null,"unit":"TWh","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Germany","period":"2025","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.bmftr.bund.de/SharedDocs/Downloads/DE/2026/rechenzentrumsstrategie.pdf","source_publisher":"BMFTR","source_published":"2026-03-18","last_checked":"2026-10-18","interpretation":"About 4% of gross electricity consumption.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":21000,"min":null,"max":null,"unit":"GWh"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"21 TWh"},{"claim_id":"germany--projected-it-connected-load-borderstep-3","record_id":"germany","record_type":"country","metric":"projected-it-connected-load-borderstep","label":"Projected IT connected load (Borderstep)","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":5000,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Germany","period":"2030","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.bmftr.bund.de/SharedDocs/Downloads/DE/2026/rechenzentrumsstrategie.pdf","source_publisher":"BMFTR","source_published":"2026-03-18","last_checked":"2026-10-18","interpretation":"Projection, not a target.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":5000,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"5,000 MW"},{"claim_id":"ireland--energy-use-1","record_id":"ireland","record_type":"country","metric":"energy-use","label":null,"metric_class":"energy-use","metric_type":"energy","value_kind":"exact","value":7663,"value_min":null,"value_max":null,"unit":"GWh","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"rising from 6,973 Gigawatt hours (GWh) in 2024 to 7,663 GWh in 2025","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2025","date_basis":"stated","observed_on":"2026-10-18","qualification":"disputed","source_url":"https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/datacentresmeteredelectricityconsumption2025/keyfindings/","source_publisher":"Central Statistics Office","source_published":"2026","last_checked":"2026-10-18","interpretation":"Metered annual electricity consumption.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"conflicting","kind":"metric","normalised":{"value":7663,"min":null,"max":null,"unit":"GWh"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"7,663 GWh"},{"claim_id":"ireland--data-centre-share-of-metered-electricity-1","record_id":"ireland","record_type":"country","metric":"data-centre-share-of-metered-electricity","label":"Data centre share of metered electricity consumption","metric_class":"other","metric_type":"share","value_kind":"exact","value":23,"value_min":null,"value_max":null,"unit":"percent","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Ireland","period":"2025","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/datacentresmeteredelectricityconsumption2025/keyfindings/","source_publisher":"Central Statistics Office","source_published":"2026","last_checked":"2026-10-18","interpretation":null,"components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":23,"min":null,"max":null,"unit":"percent"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"23%"},{"claim_id":"ireland--data-centre-metered-electricity-consumpt-2","record_id":"ireland","record_type":"country","metric":"data-centre-metered-electricity-consumpt","label":"Data centre metered electricity consumption","metric_class":"energy-use","metric_type":"energy","value_kind":"exact","value":7663,"value_min":null,"value_max":null,"unit":"GWh","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Ireland","period":"2025","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/datacentresmeteredelectricityconsumption2025/keyfindings/","source_publisher":"Central Statistics Office","source_published":"2026","last_checked":"2026-10-18","interpretation":"2024 restated as 6,973 GWh in the 2025 release (6,969 GWh in the 2024 release).","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":7663,"min":null,"max":null,"unit":"GWh"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"7,663 GWh"},{"claim_id":"ireland--forecast-data-centre-electricity-demand-3","record_id":"ireland","record_type":"country","metric":"forecast-data-centre-electricity-demand","label":"Forecast data centre electricity demand","metric_class":"energy-use","metric_type":"energy","value_kind":"exact","value":14.6,"value_min":null,"value_max":null,"unit":"TWh","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Ireland","period":"2034","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.cru.ie/about-us/news/the-cru-publishes-its-decision-on-new-electricity-connection-policy-for-data-centres/","source_publisher":"Commission for Regulation of Utilities","source_published":"2025","last_checked":"2026-10-18","interpretation":"EirGrid forecast cited by CRU, from 9.4 TWh in 2025.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":14600,"min":null,"max":null,"unit":"GWh"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"14.6 TWh"},{"claim_id":"malaysia--actual-electricity-use-of-20-operating-d-1","record_id":"malaysia","record_type":"country","metric":"actual-electricity-use-of-20-operating-d","label":"Actual electricity use of 20 operating data centres, Johor","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":919.97,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Johor","period":"March 2026","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://mediadigitaljohor.gov.my/en/johor-perkenal-pendekatan-lestari-urus-pembangunan-pusat-data/","source_publisher":"Media Digital Johor (Johor state government)","source_published":"2026-05-06","last_checked":"2026-10-18","interpretation":null,"components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":919.97,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"919.97 MW"},{"claim_id":"malaysia--approved-data-centre-capacity-28-project-2","record_id":"malaysia","record_type":"country","metric":"approved-data-centre-capacity-28-project","label":"Approved data centre capacity, 28 projects, Johor","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":5628,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Johor","period":"May 2026","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://mediadigitaljohor.gov.my/en/johor-perkenal-pendekatan-lestari-urus-pembangunan-pusat-data/","source_publisher":"Media Digital Johor (Johor state government)","source_published":"2026-05-06","last_checked":"2026-10-18","interpretation":"Approvals, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":5628,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"5,628 MW"},{"claim_id":"malaysia--investment-in-projects-approved-by-data-3","record_id":"malaysia","record_type":"country","metric":"investment-in-projects-approved-by-data-","label":"Investment in projects approved by Data Centre Task Force","metric_class":"investment","metric_type":"money","value_kind":"exact","value":225.97,"value_min":null,"value_max":null,"unit":"currency","unit_label":"MYR billion","scale_word":"billion","multiplier":1000000000,"currency":"MYR","original_wording":null,"scope":"national","geography":"Malaysia","period":"to July 2026","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.thestar.com.my/news/nation/2026/10/14/task-force-approved-27-data-centre-projects-with-estimated-investments-of-rm22597bil","source_publisher":"The Star (Bernama)","source_published":"2026-10-14","last_checked":"2026-10-18","interpretation":"27 projects: 16 Johor, 10 Selangor, 1 Negeri Sembilan.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":225970000000,"min":null,"max":null,"unit":"MYR"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"MYR 225.97 billion"},{"claim_id":"saudi-arabia--other-1","record_id":"saudi-arabia","record_type":"country","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":467,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"capacity rising to 467 megawatts","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2026","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://mcit.gov.sa/en/node/249183","source_publisher":"Ministry of Communications and Information Technology","source_published":"2026-05-05","last_checked":"2026-10-18","interpretation":"Government-reported operational capacity, IT or facility basis not stated.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":467,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"467 MW"},{"claim_id":"saudi-arabia--operational-data-centre-capacity-1","record_id":"saudi-arabia","record_type":"country","metric":"operational-data-centre-capacity","label":"Operational data centre capacity","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":467,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Saudi Arabia","period":"2026-Q1","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://mcit.gov.sa/en/node/249183","source_publisher":"Ministry of Communications and Information Technology","source_published":"2026-05-05","last_checked":"2026-10-18","interpretation":"Basis not defined. 440 MW in 2025, 68 MW in 2021.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":467,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"467 MW"},{"claim_id":"singapore--data-centre-capacity-1","record_id":"singapore","record_type":"country","metric":"data-centre-capacity","label":"Data centre capacity","metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":1.4,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"Over 1.4 gigawatts","scope":"national","geography":"Singapore","period":"2024-05","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.imda.gov.sg/resources/press-releases-factsheets-and-speeches/factsheets/2024/charting-green-growth-for-data-centres-in-sg","source_publisher":"IMDA","source_published":"2024-05-30","last_checked":"2026-10-18","interpretation":"\"Over 1.4 gigawatts\", basis not stated.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":1400,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"at least 1.4 GW"},{"claim_id":"singapore--dc-cfa2-provisional-allocation-2","record_id":"singapore","record_type":"country","metric":"dc-cfa2-provisional-allocation","label":"DC-CFA2 provisional allocation","metric_class":"other","metric_type":"unclear","value_kind":"exact","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Singapore","period":"2026-08","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.edb.gov.sg/en/about-edb/media-releases-publications/four-data-centre-proposals-selected-as-part-of-second-data-centre.html","source_publisher":"EDB","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Four operators, 50 MW each.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"200 MW"},{"claim_id":"united-kingdom--it-power-1","record_id":"united-kingdom","record_type":"country","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":1.6,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"Total IT power: 1.6 gigawatts","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2024","date_basis":"stated","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.gov.uk/government/publications/estimate-of-data-centre-capacity-great-britain-2024/estimate-of-data-centre-capacity-great-britain-2024","source_publisher":"Department for Science, Innovation and Technology","source_published":"2025-03-11","last_checked":"2026-10-18","interpretation":"Total IT power: 1.6 gigawatts","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"estimated","conflict_status":"none","kind":"metric","normalised":{"value":1600,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"1.6 GW"},{"claim_id":"united-kingdom--colocation-it-capacity-maximum-rated-it-1","record_id":"united-kingdom","record_type":"country","metric":"colocation-it-capacity-maximum-rated-it-","label":"Colocation IT capacity (maximum rated IT load), Great Britain","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":1.6,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Great Britain","period":"autumn 2024","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.gov.uk/government/publications/estimate-of-data-centre-capacity-great-britain-2024/estimate-of-data-centre-capacity-great-britain-2024","source_publisher":"Department for Science, Innovation and Technology","source_published":"2025-03-11","last_checked":"2026-10-18","interpretation":"Modelled estimate, colocation only, excludes enterprise data centres.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":1600,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"1.6 GW"},{"claim_id":"united-kingdom--colocation-it-capacity-london-itl1-2","record_id":"united-kingdom","record_type":"country","metric":"colocation-it-capacity-london-itl1","label":"Colocation IT capacity, London (ITL1)","metric_class":"it-power","metric_type":"power","value_kind":"exact","value":1048,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"London","period":"autumn 2024","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.gov.uk/government/publications/estimate-of-data-centre-capacity-great-britain-2024/estimate-of-data-centre-capacity-great-britain-2024","source_publisher":"Department for Science, Innovation and Technology","source_published":"2025-03-11","last_checked":"2026-10-18","interpretation":"Same DSIT estimate.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":1048,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"1,048 MW"},{"claim_id":"united-kingdom--demand-connection-applications-in-gb-que-3","record_id":"united-kingdom","record_type":"country","metric":"demand-connection-applications-in-gb-que","label":"Demand connection applications in GB queue","metric_class":"grid-connection","metric_type":"power","value_kind":"exact","value":125,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"Great Britain","period":"mid 2025","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.ofgem.gov.uk/press-release/ofgem-acts-free-grid-capacity-tackling-speculative-data-centre-projects","source_publisher":"Ofgem","source_published":"2026-07-29","last_checked":"2026-10-18","interpretation":"Up from 41 GW in under a year, all demand types, largely data centres.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":125000,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"125 GW"},{"claim_id":"united-states--data-centre-electricity-consumption-1","record_id":"united-states","record_type":"country","metric":"data-centre-electricity-consumption","label":"Data centre electricity consumption","metric_class":"energy-use","metric_type":"energy","value_kind":"exact","value":176,"value_min":null,"value_max":null,"unit":"TWh","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"United States","period":"2023","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_publisher":"US Department of Energy","source_published":"2024-12-20","last_checked":"2026-10-18","interpretation":"About 4.4% of total US electricity.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":176000,"min":null,"max":null,"unit":"GWh"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"176 TWh"},{"claim_id":"united-states--projected-data-centre-electricity-consum-2","record_id":"united-states","record_type":"country","metric":"projected-data-centre-electricity-consum","label":"Projected data centre electricity consumption (range)","metric_class":"energy-use","metric_type":"energy","value_kind":"range","value":null,"value_min":325,"value_max":580,"unit":"TWh","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":null,"scope":"national","geography":"United States","period":"2028","asset_id":null,"claim_stage":null,"delivery_state":null,"delivery_evidence":null,"claim_date":null,"date_basis":"period-only","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers","source_publisher":"US Department of Energy","source_published":"2024-12-20","last_checked":"2026-10-18","interpretation":"Range of 325 to 580 TWh, 6.7% to 12% of US electricity. Projection.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"indicator","normalised":{"value":null,"min":325000,"max":580000,"unit":"GWh"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Country or regional indicator. Shown on its own, never summed with project records.","display_value":"325 to 580 TWh"},{"claim_id":"coreweave--investment-1","record_id":"coreweave","record_type":"organisation","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":2.5,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"GBP","original_wording":"bringing the total investment in the country to £2.5 billion","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-09-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.coreweave.com/news/coreweave-announces-significant-commitment-to-power-uk-ai-innovation-and-growth","source_publisher":"CoreWeave","source_published":"2025-09-16","last_checked":"2026-10-18","interpretation":"UK company-wide commitment, GBP billions.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":2500000000,"min":null,"max":null,"unit":"GBP"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"GBP 2.5 billion"},{"claim_id":"vantage--it-power-1","record_id":"vantage","record_type":"organisation","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":300,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"combined critical IT load of 300MW+","scope":"campus","geography":null,"period":null,"asset_id":"vantage","claim_stage":"pipeline-mixed","delivery_state":"announced","delivery_evidence":null,"claim_date":null,"date_basis":"observed-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://vantage-dc.com/data-center-locations/apac/johor-malaysia","source_publisher":"Vantage Data Centers","source_published":null,"last_checked":"2026-10-18","interpretation":"Johor JHB1 campus planned total, first facility operational. Not a project record yet.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":300,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"300 MW"},{"claim_id":"de-rechenzentrumsstrategie-2026--it-power-1","record_id":"de-rechenzentrumsstrategie-2026","record_type":"policy","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":2980,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"beziffert die IT-Anschlussleistung von Rechenzentren in Deutschland auf 2.980","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2025","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.bmftr.bund.de/SharedDocs/Downloads/DE/2026/rechenzentrumsstrategie.pdf","source_publisher":"Bundesministerium für Forschung, Technologie und Raumfahrt (BMFTR)","source_published":"2026-03-18","last_checked":"2026-10-18","interpretation":"beziffert die IT-Anschlussleistung von Rechenzentren in Deutschland auf 2.980","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"third-party-estimate","conflict_status":"none","kind":"metric","normalised":{"value":2980,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"2,980 MW"},{"claim_id":"de-rechenzentrumsstrategie-2026--it-power-2","record_id":"de-rechenzentrumsstrategie-2026","record_type":"policy","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":5000,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"Anstieg der Anschlussleistung von Rechenzentren bis 2030 auf insgesamt 5.000 MW","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"target","delivery_state":"announced","delivery_evidence":null,"claim_date":"2030","date_basis":"stated","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.bmftr.bund.de/SharedDocs/Downloads/DE/2026/rechenzentrumsstrategie.pdf","source_publisher":"Bundesministerium für Forschung, Technologie und Raumfahrt (BMFTR)","source_published":"2026-03-18","last_checked":"2026-10-18","interpretation":"Anstieg der Anschlussleistung von Rechenzentren bis 2030 auf insgesamt 5.000 MW","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"forecast","conflict_status":"none","kind":"metric","normalised":{"value":5000,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"5,000 MW"},{"claim_id":"gb-ofgem-data-centre-connection-reforms-curate--grid-connection-1","record_id":"gb-ofgem-data-centre-connection-reforms-curate","record_type":"policy","metric":"grid-connection","label":null,"metric_class":"grid-connection","metric_type":"power","value_kind":"exact","value":125,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"contracted demand offers increasing from 41GW to 125GW between November 2024 and June 2025","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"pipeline-mixed","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-06","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.ofgem.gov.uk/press-release/ofgem-acts-free-grid-capacity-tackling-speculative-data-centre-projects","source_publisher":"Ofgem","source_published":"2026-07-29","last_checked":"2026-10-18","interpretation":"All demand connection offers in GB, not only data centres. Ofgem attributes at least 80 GW to data centre projects in one passage and around 73 GW in another. Conflict kept visible.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":125000,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"125 GW"},{"claim_id":"ie-cru-large-energy-users-connection-policy-2025--grid-connection-1","record_id":"ie-cru-large-energy-users-connection-policy-2025","record_type":"policy","metric":"grid-connection","label":null,"metric_class":"grid-connection","metric_type":"power","value_kind":"exact","value":5.8,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"potential for in the order of 5.8GW additional demand capacity required for the data centre sector in Ireland in the medium term","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"unknown","delivery_state":"unknown","delivery_evidence":null,"claim_date":"2025-12-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://cruie-live-96ca64acab2247eca8a850a7e54b-5b34f62.divio-media.com/documents/CRU2025236_Large_Energy_User_connection_policy_decision_paper.pdf","source_publisher":"Commission for Regulation of Utilities (CRU)","source_published":"2025-12-12","last_checked":"2026-10-18","interpretation":"System operator market intelligence exercise cited by CRU. Initial feedback, not contracted demand.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"forecast","conflict_status":"none","kind":"metric","normalised":{"value":5800,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"5.8 GW"},{"claim_id":"ie-cru-large-energy-users-connection-policy-2025--grid-connection-2","record_id":"ie-cru-large-energy-users-connection-policy-2025","record_type":"policy","metric":"grid-connection","label":null,"metric_class":"grid-connection","metric_type":"share","value_kind":"exact","value":22,"value_min":null,"value_max":null,"unit":"percent","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"electricity demand from data centres growing from 5% of national electricity demand in 2015 to 22% in 2024","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2024","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.cru.ie/about-us/news/the-cru-publishes-its-decision-on-new-electricity-connection-policy-for-data-centres/","source_publisher":"Commission for Regulation of Utilities (CRU)","source_published":"2025-12-12","last_checked":"2026-10-18","interpretation":"Share of annual electricity demand, energy basis, not capacity.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":22,"min":null,"max":null,"unit":"percent"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"22%"},{"claim_id":"sg-dc-cfa2-allocation-2026--it-power-1","record_id":"sg-dc-cfa2-allocation-2026","record_type":"policy","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 200 megawatts (MW) of new capacity to four data centre (DC) operators","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"permitted","delivery_state":"permitted","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional allocation. Basis (IT or facility) not stated. 50 MW to each of four operators.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"200 MW"},{"claim_id":"sg-dc-cfa2-allocation-2026--it-power-2","record_id":"sg-dc-cfa2-allocation-2026","record_type":"policy","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"At least 200MW of DC capacity will be made available","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-12-01","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Flaunch-of-second-data-centre-call-for-application/59aaaad2-3452-44bf-a426-90a4d7e2c086.pdf","source_publisher":"EDB and IMDA","source_published":"2025-12-01","last_checked":"2026-10-18","interpretation":"Launch offer, same capacity as the later allocation. Do not add to the allocation figure.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"at least 200 MW"},{"claim_id":"sg-green-data-centre-roadmap--it-power-1","record_id":"sg-green-data-centre-roadmap","record_type":"policy","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":300,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"aims to provide at least 300 megawatts (MW) of additional capacity in the near term, with more through green energy deployments","scope":"country","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-09-11","date_basis":"stated","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://www.imda.gov.sg/how-we-can-help/green-dc-roadmap","source_publisher":"Infocomm Media Development Authority (IMDA)","source_published":"2025-09-11","last_checked":"2026-10-18","interpretation":"Roadmap target. Unit basis (IT or facility) not stated on the page. Not additive with DC-CFA2 allocations.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"forecast","conflict_status":"none","kind":"metric","normalised":{"value":300,"min":null,"max":null,"unit":"MW"},"rollup_class":null,"rollup_eligible":false,"exclusion_reason":"Not a project record. Company and leased totals are never summed (avoids double counting).","display_value":"at least 300 MW"},{"claim_id":"ae-stargate-uae-cluster--other-1","record_id":"ae-stargate-uae-cluster","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":1,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"a 1GW large-scale AI infrastructure cluster","scope":"campus","geography":null,"period":null,"asset_id":"ae-stargate-uae-cluster","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-10-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","source_publisher":"Emirates News Agency (WAM)","source_published":"2025-10-16","last_checked":"2026-10-18","interpretation":"Cluster capacity in GW. Basis not defined. Parent campus 5 GW includes it.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"1 GW"},{"claim_id":"ae-stargate-uae-cluster--investment-2","record_id":"ae-stargate-uae-cluster","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":30,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"a $30-billion, 1-gigawatt compute cluster known as Stargate UAE","scope":"campus","geography":null,"period":null,"asset_id":"ae-stargate-uae-cluster","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-09-11","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.internazionale.it/ultime-notizie-reuters/2026/09/11/exclusive-uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say","source_publisher":"Internazionale (Reuters syndication)","source_published":"2026-09-11","last_checked":"2026-10-18","interpretation":"USD billions as reported by Reuters. Not confirmed by G42 in sources reviewed.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":30000000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: USD billions as reported by Reuters. Not confirmed by G42 in sources reviewed.","display_value":"USD 30 billion"},{"claim_id":"ae-stargate-uae-phase-1--other-1","record_id":"ae-stargate-uae-phase-1","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"building the first 200MW of the 1GW mega-scale infrastructure","scope":"phase","geography":null,"period":null,"asset_id":"ae-stargate-uae-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2025-10-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","source_publisher":"Emirates News Agency (WAM)","source_published":"2025-10-16","last_checked":"2026-10-18","interpretation":"Phase capacity, basis not defined (IT or facility). Included in parent 1 GW.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"200 MW"},{"claim_id":"ae-uae-us-ai-campus--other-1","record_id":"ae-uae-us-ai-campus","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":5,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"within the 5GW UAE–U.S. AI Campus in Abu Dhabi","scope":"campus","geography":null,"period":null,"asset_id":"ae-uae-us-ai-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-10-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"disputed","source_url":"https://www.wam.ae/en/article/bm8fieb-g42-advances-construction-stargate-uae","source_publisher":"Emirates News Agency (WAM)","source_published":"2025-10-16","last_checked":"2026-10-18","interpretation":"Headline campus capacity in GW. Electrical basis not defined by the source.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"conflicting","kind":"metric","normalised":{"value":5,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"5 GW"},{"claim_id":"de-google-dietzenbach--investment-1","record_id":"de-google-dietzenbach","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":5.5,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"EUR","original_wording":"€5.5 billion investment (2026-2029) in infrastructure and offices in Germany","scope":"company","geography":null,"period":"2026-2029","asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-11-11","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029","source_publisher":"Google Cloud Press Corner","source_published":"2025-11-11","last_checked":"2026-10-18","interpretation":"Company-wide Germany investment, EUR billions. Not a project budget.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":5500000000,"min":null,"max":null,"unit":"EUR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"EUR 5.5 billion"},{"claim_id":"de-microsoft-rhenish-cluster--investment-1","record_id":"de-microsoft-rhenish-cluster","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":3.2,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"EUR","original_wording":"3,2 Milliarden Euro will Microsoft in der Region investieren","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"disputed","source_url":"https://www1.wdr.de/nrw/rheinland/bergheim-bedburg-elsdorf-microsoft-rechenzentrum-spatenstich-internet-ki-100.html","source_publisher":"WDR","source_published":"2026-03-12","last_checked":"2026-10-18","interpretation":"Microsoft Germany AI and cloud infrastructure investment, EUR billions. Scope across Germany per Microsoft 2024 announcement, attributed to the region by WDR. Not a verified project budget.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"conflicting","kind":"metric","normalised":{"value":3200000000,"min":null,"max":null,"unit":"EUR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"EUR 3.2 billion"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-total","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"investment-total","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":92,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"USD","original_wording":"represents a $92 million investment","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Total stated by Equinix. Components: USD 78 million facility and USD 14 million retail IBX fit-out.","components":["ie-equinix-db7x-blanchardstown--investment-facility","ie-equinix-db7x-blanchardstown--investment-retail-fit-out"],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":92000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":true,"exclusion_reason":null,"display_value":"USD 92 million"},{"claim_id":"ie-equinix-db7x-blanchardstown--area-2","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":1322,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"will cover 1,322m²","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Building area as stated by Equinix.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1322,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"1,322 sq m"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-facility","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"investment-component-facility","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":78,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"USD","original_wording":"an investment of $78 million into the new high-performance data center facility","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Facility component of the USD 92 million total.","components":[],"component_of":"ie-equinix-db7x-blanchardstown--investment-total","source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":78000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.","display_value":"USD 78 million"},{"claim_id":"ie-equinix-db7x-blanchardstown--investment-retail-fit-out","record_id":"ie-equinix-db7x-blanchardstown","record_type":"project","metric":"investment-component-retail-fit-out","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":14,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"USD","original_wording":"an additional $14 million to support a retail IBX buildout","scope":"building","geography":null,"period":null,"asset_id":"ie-equinix-db7x-blanchardstown","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-03-20","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://newsroom.equinix.com/2026-03-20-Equinix-begins-construction-on-new-data-center-in-Dublin","source_publisher":"Equinix","source_published":"2026-03-20","last_checked":"2026-10-18","interpretation":"Retail IBX fit-out component of the USD 92 million total.","components":[],"component_of":"ie-equinix-db7x-blanchardstown--investment-total","source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":14000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Component of ie-equinix-db7x-blanchardstown--investment-total. The total is counted once, components are never added again.","display_value":"USD 14 million"},{"claim_id":"ie-google-grange-castle-phase-3--area-1","record_id":"ie-google-grange-castle-phase-3","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":72400,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"construct the 72,400sq m data centre on the 50-acre site","scope":"phase","geography":null,"period":null,"asset_id":"ie-google-grange-castle-phase-3","claim_stage":"permitted","delivery_state":"permitted","delivery_evidence":null,"claim_date":"2026-09-28","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.irishtimes.com/business/2026/09/28/google-wins-planning-permission-for-dublin-data-centre-extension/","source_publisher":"The Irish Times","source_published":"2026-09-28","last_checked":"2026-10-18","interpretation":"Building floor area as reported.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":72400,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"72,400 sq m"},{"claim_id":"ie-vantage-dub11-profile-park--it-power-1","record_id":"ie-vantage-dub11-profile-park","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":52,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"will deliver 52 megawatts of IT load","scope":"campus","geography":null,"period":null,"asset_id":"ie-vantage-dub11-profile-park","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-07-24","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","source_publisher":"The Irish Times","source_published":"2026-07-24","last_checked":"2026-10-18","interpretation":"IT load as reported from filings.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":52,"min":null,"max":null,"unit":"MW"},"rollup_class":"delayed-on-hold","rollup_eligible":true,"exclusion_reason":null,"display_value":"52 MW"},{"claim_id":"ie-vantage-dub11-profile-park--investment-2","record_id":"ie-vantage-dub11-profile-park","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":972.2,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"million","multiplier":1000000,"currency":"EUR","original_wording":"accumulated project costs were €972.2 million","scope":"campus","geography":null,"period":null,"asset_id":"ie-vantage-dub11-profile-park","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2025-12-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.irishtimes.com/business/2026/07/24/vantage-faces-152m-compensation-bill-to-tenants-over-delayed-dublin-data-centre-project/","source_publisher":"The Irish Times","source_published":"2026-07-24","last_checked":"2026-10-18","interpretation":"Accumulated cost to end 2025 before impairment, EUR millions. Project described as a €1 billion development.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":972200000,"min":null,"max":null,"unit":"EUR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: Accumulated cost to end 2025 before impairment, EUR millions. Project described as a €1 billion development.","display_value":"EUR 972.2 million"},{"claim_id":"my-airtrunk-jhb1--it-power-1","record_id":"my-airtrunk-jhb1","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":150,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"a total capacity of 150+MW","scope":"campus","geography":null,"period":null,"asset_id":"my-airtrunk-jhb1","claim_stage":"operating","delivery_state":"design","delivery_evidence":null,"claim_date":null,"date_basis":"observed-only","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://airtrunk.com/location/jhb1-johor/","source_publisher":"AirTrunk","source_published":null,"last_checked":"2026-10-18","interpretation":"Total campus capacity as listed by AirTrunk. Treated as IT load because AirTrunk describes JHB1 plus JHB2 as more than 420 MW of IT load. Lower bound.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":150,"min":null,"max":null,"unit":"MW"},"rollup_class":"announced-design","rollup_eligible":true,"exclusion_reason":null,"display_value":"at least 150 MW"},{"claim_id":"my-airtrunk-jhb1--area-2","record_id":"my-airtrunk-jhb1","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":21900,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"21,900m2 of technical data hall area","scope":"campus","geography":null,"period":null,"asset_id":"my-airtrunk-jhb1","claim_stage":"operating","delivery_state":"design","delivery_evidence":null,"claim_date":null,"date_basis":"observed-only","observed_on":"2026-10-18","qualification":"official","source_url":"https://airtrunk.com/location/jhb1-johor/","source_publisher":"AirTrunk","source_published":null,"last_checked":"2026-10-18","interpretation":"Technical data hall area of the campus as listed by AirTrunk.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":21900,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"21,900 sq m"},{"claim_id":"my-airtrunk-jhb2--it-power-1","record_id":"my-airtrunk-jhb2","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"lower_bound","value":270,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"Scalable to over 270 megawatts (MW)","scope":"campus","geography":null,"period":null,"asset_id":"my-airtrunk-jhb2","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-02-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","source_publisher":"AirTrunk","source_published":"2025-02-12","last_checked":"2026-10-18","interpretation":"Ultimate campus IT load, lower bound.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":270,"min":null,"max":null,"unit":"MW"},"rollup_class":"announced-design","rollup_eligible":true,"exclusion_reason":null,"display_value":"at least 270 MW"},{"claim_id":"my-airtrunk-jhb2--investment-2","record_id":"my-airtrunk-jhb2","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"lower_bound","value":9.7,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"MYR","original_wording":"investing over RM 9.7 billion / A$3.5 billion in Malaysia","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-02-12","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://airtrunk.com/airtrunk-scales-up-in-malaysia-with-announcement-of-second-malaysia-hyperscale-data-centre-jhb2/","source_publisher":"AirTrunk","source_published":"2025-02-12","last_checked":"2026-10-18","interpretation":"Combined JHB1 and JHB2 investment, MYR billions. Not attributable to JHB2 alone.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":9700000000,"min":null,"max":null,"unit":"MYR"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"at least MYR 9.7 billion"},{"claim_id":"my-google-elmina--investment-1","record_id":"my-google-elmina","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":2,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"investing US$2 billion in Malaysia","scope":"company","geography":null,"period":null,"asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2024-05-30","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.googlecloudpresscorner.com/2024-05-30-Advancing-Malaysia-Together-Google-Announces-US-2-Billion-Investment-in-Malaysia,-Including-First-Google-Data-Center-and-Google-Cloud-Region","source_publisher":"Google Cloud Press Corner","source_published":"2024-05-30","last_checked":"2026-10-18","interpretation":"Company-wide Malaysia investment including data centre, cloud region and skills programmes, USD billions.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":2000000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"USD 2 billion"},{"claim_id":"sa-datavolt-oxagon-campus--other-1","record_id":"sa-datavolt-oxagon-campus","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":1.5,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"wider planned 1.5GW Oxagon campus","scope":"campus","geography":null,"period":null,"asset_id":"sa-datavolt-oxagon-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-08-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","source_publisher":"DataVolt","source_published":"2026-08-31","last_checked":"2026-10-18","interpretation":"Planned campus total, basis not defined.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1.5,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"1.5 GW"},{"claim_id":"sa-datavolt-oxagon-phase-1--other-1","record_id":"sa-datavolt-oxagon-phase-1","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":360,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"360MW first phase","scope":"phase","geography":null,"period":null,"asset_id":"sa-datavolt-oxagon-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-08-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","source_publisher":"DataVolt","source_published":"2026-08-31","last_checked":"2026-10-18","interpretation":"Phase capacity, basis not defined. Part of 1.5 GW parent.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":360,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"360 MW"},{"claim_id":"sa-datavolt-oxagon-phase-1--other-2","record_id":"sa-datavolt-oxagon-phase-1","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":100,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"100MW of the first phase's 360MW currently under development","scope":"phase","geography":null,"period":null,"asset_id":"sa-datavolt-oxagon-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2026-08-31","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://data-volt.com/media/breaking-news/humain-partners-datavolt-develop-100mw-of-a-360mw-ai-datacenter-in-neom/","source_publisher":"DataVolt","source_published":"2026-08-31","last_checked":"2026-10-18","interpretation":"HUMAIN share within the 360 MW phase. Never add to 360.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":100,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"100 MW"},{"claim_id":"sg-jurong-island-dc-cfa2-digital-realty--it-power-1","record_id":"sg-jurong-island-dc-cfa2-digital-realty","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-digital-realty","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"},{"claim_id":"sg-jurong-island-dc-cfa2-equinix--it-power-1","record_id":"sg-jurong-island-dc-cfa2-equinix","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-equinix","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"},{"claim_id":"sg-jurong-island-dc-cfa2-keppel--it-power-1","record_id":"sg-jurong-island-dc-cfa2-keppel","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-keppel","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"},{"claim_id":"sg-jurong-island-dc-cfa2-stt-gdc--it-power-1","record_id":"sg-jurong-island-dc-cfa2-stt-gdc","record_type":"project","metric":"it-power","label":null,"metric_class":"it-power","metric_type":"power","value_kind":"exact","value":50,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"provisionally allocated 50MW of DC capacity to each of the following companies","scope":"project","geography":null,"period":null,"asset_id":"sg-jurong-island-dc-cfa2-stt-gdc","claim_stage":"allocated-provisional","delivery_state":"allocated-provisional","delivery_evidence":null,"claim_date":"2026-08-21","date_basis":"stated","observed_on":"2026-10-18","qualification":"inferred","source_url":"https://assets.app.optical.gov.sg/edb/production/published/collections/insights/%252Ffour-data-centre-proposals-selected-as-part-of-second-data-centre/64aef86f-88e1-46a6-9d63-2f2f6020dd8a.pdf","source_publisher":"EDB and IMDA","source_published":"2026-08-21","last_checked":"2026-10-18","interpretation":"Provisional capacity allocation. Basis (IT or facility) not stated by EDB. Treated as allocation, not built capacity.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50,"min":null,"max":null,"unit":"MW"},"rollup_class":"allocated-provisional","rollup_eligible":true,"exclusion_reason":null,"display_value":"50 MW"},{"claim_id":"uk-google-waltham-cross--investment-1","record_id":"uk-google-waltham-cross","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":5,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"GBP","original_wording":"two-year £5 billion investment in the UK","scope":"company","geography":null,"period":"2025-2027","asset_id":null,"claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-09-16","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.googlecloudpresscorner.com/2025-09-16-Google-Opens-Waltham-Cross-Data-Centre-as-Part-of-Two-year-GBP5-Billion-Investment-in-the-UK-to-Help-Power-its-AI-Economy","source_publisher":"Google Cloud Press Corner","source_published":"2025-09-16","last_checked":"2026-10-18","interpretation":"Company-wide UK capex, R&D and engineering over two years. Not a project budget. Never convert to MW.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":5000000000,"min":null,"max":null,"unit":"GBP"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Scope is company, not one physical project. Not attributable to this asset.","display_value":"GBP 5 billion"},{"claim_id":"uk-nscale-loughton--grid-connection-1","record_id":"uk-nscale-loughton","record_type":"project","metric":"grid-connection","label":null,"metric_class":"grid-connection","metric_type":"power","value_kind":"upper_bound","value":90,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"seeking up to 90MW of capacity","scope":"project","geography":null,"period":null,"asset_id":"uk-nscale-loughton","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-09-24","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.theguardian.com/technology/2026/sep/24/construction-largest-supercomputer-delayed","source_publisher":"The Guardian","source_published":"2026-09-24","last_checked":"2026-10-18","interpretation":"Reported requested supply capacity. Basis (grid import versus IT) not confirmed by the developer.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":90,"min":null,"max":null,"unit":"MW"},"rollup_class":"delayed-on-hold","rollup_eligible":false,"exclusion_reason":"Upper bound only (\"up to\"). Not added to totals.","display_value":"up to 90 MW"},{"claim_id":"uk-qts-cambois-campus--investment-1","record_id":"uk-qts-cambois-campus","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":10,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"GBP","original_wording":"£10bn development","scope":"campus","geography":null,"period":null,"asset_id":"uk-qts-cambois-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-03-05","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","source_publisher":"BBC News","source_published":"2025-03-05","last_checked":"2026-10-18","interpretation":"Headline development value for the whole campus as reported. Period not stated.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":10000000000,"min":null,"max":null,"unit":"GBP"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: Headline development value for the whole campus as reported. Period not stated.","display_value":"GBP 10 billion"},{"claim_id":"uk-qts-cambois-campus--area-2","record_id":"uk-qts-cambois-campus","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"lower_bound","value":540000,"value_min":null,"value_max":null,"unit":"m2","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"10 buildings constructed over more than 133 acres (540,000 sq m)","scope":"campus","geography":null,"period":null,"asset_id":"uk-qts-cambois-campus","claim_stage":"permitted","delivery_state":"permitted","delivery_evidence":null,"claim_date":"2025-03-05","date_basis":"stated","observed_on":"2026-10-18","qualification":"third-party-reported","source_url":"https://www.bbc.co.uk/news/articles/czdnyeqmy20o","source_publisher":"BBC News","source_published":"2025-03-05","last_checked":"2026-10-18","interpretation":"Site area under outline permission, not floor area.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":540000,"min":null,"max":null,"unit":"m2"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"at least 540,000 sq m"},{"claim_id":"us-abilene-lancium-clean-campus--total-facility-power-1","record_id":"us-abilene-lancium-clean-campus","record_type":"project","metric":"total-facility-power","label":null,"metric_class":"total-facility-power","metric_type":"power","value_kind":"exact","value":1.2,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"total power capacity of 1.2 gigawatts (GW)","scope":"campus","geography":null,"period":null,"asset_id":"us-abilene-lancium-clean-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-03-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","source_publisher":"Crusoe","source_published":"2025-03-18","last_checked":"2026-10-18","interpretation":"Total campus power capacity at eight buildings. Crusoe/Lancium describe a 1.2 GW grid interconnection. Not stated as IT load.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1200,"min":null,"max":null,"unit":"MW"},"rollup_class":"announced-design","rollup_eligible":true,"exclusion_reason":null,"display_value":"1.2 GW"},{"claim_id":"us-abilene-lancium-clean-campus--area-2","record_id":"us-abilene-lancium-clean-campus","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"approximate","value":4000000,"value_min":null,"value_max":null,"unit":"sqft","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"approximately 4 million square feet","scope":"campus","geography":null,"period":null,"asset_id":"us-abilene-lancium-clean-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2025-03-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","source_publisher":"Crusoe","source_published":"2025-03-18","last_checked":"2026-10-18","interpretation":"Total floor area at eight buildings.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":4000000,"min":null,"max":null,"unit":"sqft"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"about 4,000,000 sq ft"},{"claim_id":"us-abilene-phase-1--total-facility-power-1","record_id":"us-abilene-phase-1","record_type":"project","metric":"total-facility-power","label":null,"metric_class":"total-facility-power","metric_type":"power","value_kind":"lower_bound","value":200,"value_min":null,"value_max":null,"unit":"MW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"two buildings at 980,000 square feet and 200+ megawatts","scope":"phase","geography":null,"period":null,"asset_id":"us-abilene-phase-1","claim_stage":"under-construction","delivery_state":"under-construction","delivery_evidence":null,"claim_date":"2025-03-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts","source_publisher":"Crusoe","source_published":"2025-03-18","last_checked":"2026-10-18","interpretation":"Phase power capacity, lower bound (\"200+\"). Parent campus figure includes this phase, so not eligible for roll-up.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":200,"min":null,"max":null,"unit":"MW"},"rollup_class":"under-construction","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: Phase power capacity, lower bound (\"200+\"). Parent campus figure includes this phase, so not eligible for roll-up.","display_value":"at least 200 MW"},{"claim_id":"us-meta-richland-parish-hyperion--other-1","record_id":"us-meta-richland-parish-hyperion","record_type":"project","metric":"other","label":null,"metric_class":"other","metric_type":"unclear","value_kind":"exact","value":5,"value_min":null,"value_max":null,"unit":"GW","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"expanding our AI-optimized data center in Richland Parish, Louisiana to 5 GW in compute capacity","scope":"campus","geography":null,"period":null,"asset_id":"us-meta-richland-parish-hyperion","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-07-13","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","source_publisher":"Meta Data Centers","source_published":"2026-07-13","last_checked":"2026-10-18","interpretation":"\"Compute capacity\" in GW as stated by Meta. Electrical basis (IT, facility or grid) not defined, so classed other and not summed with IT MW.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":5,"min":null,"max":null,"unit":"GW"},"rollup_class":"announced-design","rollup_eligible":false,"exclusion_reason":"Basis unclear (not stated as IT, facility, grid or thermal). Never summed.","display_value":"5 GW"},{"claim_id":"us-meta-richland-parish-hyperion--investment-2","record_id":"us-meta-richland-parish-hyperion","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"lower_bound","value":50,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"an investment of more than $50 billion in the Richland Parish region","scope":"campus","geography":null,"period":null,"asset_id":"us-meta-richland-parish-hyperion","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-07-13","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/","source_publisher":"Meta Data Centers","source_published":"2026-07-13","last_checked":"2026-10-18","interpretation":"USD billions, lower bound, regional investment by Meta. Period not stated.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":50000000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Marked not summable by research: USD billions, lower bound, regional investment by Meta. Period not stated.","display_value":"at least USD 50 billion"},{"claim_id":"us-microsoft-fairwater-1--area-1","record_id":"us-microsoft-fairwater-1","record_type":"project","metric":"area","label":null,"metric_class":"area","metric_type":"area","value_kind":"exact","value":1200000,"value_min":null,"value_max":null,"unit":"sqft","unit_label":null,"scale_word":null,"multiplier":1,"currency":null,"original_wording":"three massive buildings with a combined 1.2 million square feet under roofs","scope":"phase","geography":null,"period":null,"asset_id":"us-microsoft-fairwater-1","claim_stage":"operating","delivery_state":"operating","delivery_evidence":null,"claim_date":"2025-09-18","date_basis":"stated","observed_on":"2026-10-18","qualification":"official","source_url":"https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/","source_publisher":"Microsoft (Official Microsoft Blog)","source_published":"2025-09-18","last_checked":"2026-10-18","interpretation":"Floor area under roof.","components":[],"component_of":null,"source_aggregation_eligible":true,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":1200000,"min":null,"max":null,"unit":"sqft"},"rollup_class":"area","rollup_eligible":false,"exclusion_reason":"Area figures describe different things (site, floor or data hall area). Shown per record, never summed.","display_value":"1,200,000 sq ft"},{"claim_id":"us-microsoft-mount-pleasant-campus--investment-1","record_id":"us-microsoft-mount-pleasant-campus","record_type":"project","metric":"investment","label":null,"metric_class":"investment","metric_type":"money","value_kind":"exact","value":4.7,"value_min":null,"value_max":null,"unit":"currency","unit_label":null,"scale_word":"billion","multiplier":1000000000,"currency":"USD","original_wording":"will have spent $4.7 billion between 2024 and 2028 locally on hyperscale construction in Wisconsin","scope":"campus","geography":null,"period":"2024-2028","asset_id":"us-microsoft-mount-pleasant-campus","claim_stage":"announced","delivery_state":"announced","delivery_evidence":null,"claim_date":"2026-06-23","date_basis":"stated","observed_on":"2026-10-18","qualification":"modelled","source_url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/","source_publisher":"Microsoft Source","source_published":"2026-06-23","last_checked":"2026-10-18","interpretation":"Local construction spend estimate, USD billions. Distinct from earlier headline investment figures.","components":[],"component_of":null,"source_aggregation_eligible":false,"claim_type":"reported","conflict_status":"none","kind":"metric","normalised":{"value":4700000000,"min":null,"max":null,"unit":"USD"},"rollup_class":"investment","rollup_eligible":false,"exclusion_reason":"Modelled estimate. Totals use reported figures only.","display_value":"USD 4.7 billion"}]}