Project record, campus

Stargate Norway (Kvandal, Narvik)

AnnouncedNorwayNordland

AI data centre planned by Nscale with Aker and OpenAI at Kvandal outside Narvik in northern Norway. The partners said it is planned to deliver 230 MW of capacity with an ambition to add 290 MW more, and that it is OpenAI's first data centre initiative in Europe under its OpenAI for Countries programme. The area has abundant hydropower, low local demand and limited transmission capacity.

Reported figures

Reported figures for Stargate Norway (Kvandal, Narvik)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
230 MW
Official source
Otherbasis unclear
Planned capacity. The release does not say whether this is IT load or grid connection
Source wording: "planned to deliver 230MW of capacity"
Planned
Stage stated in source: Planned
campus
31 Jul 2025
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.news.cision.com (opens in a new tab)
290 MW
Official source
Otherbasis unclear
Possible expansion on top of the 230 MW, stated as an ambition
Source wording: "ambitions to expand by an additional 290MW"
Planned
Stage stated in source: Planned
campus
31 Jul 2025
No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed.news.cision.com (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Power and grid

Hydropower region with low local electricity demand and limited transmission capacity, as described by the partners. news.cision.com (opens in a new tab)

Sources (1), last checked 19 Oct 2026
  1. Nscale, Aker and OpenAI to establish Stargate Norway (opens in a new tab), Aker ASA (Cision), published 31 Jul 2025, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.