Project record, campus
Data4 MIL02 campus (Vittuone, Milan)
Data4 announced a EUR 500 million campus called MIL02 at Vittuone west of Milan on a 77,000 square metre site, with four data centres and 100 MW in total. The first 15 MW data centre is planned for early 2027. Data4 expects to have 18 data centres in Italy on 28 hectares with around 300 MW in total once the build is complete, and plans direct connectivity between MIL02 and its existing campus.
Reported figures
| Figure | What it measures | Delivery state | Scope and date | Used in totals | Source |
|---|---|---|---|---|---|
| 100 MW Official source | Otherbasis unclear Campus total at full build. MW basis not stated Source wording: "100 MW" | Planned Stage stated in source: Planned | campus 2 Apr 2024 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | newswire.telecomramblings.com (opens in a new tab) |
| 15 MW Official source | Otherbasis unclear First building. MW basis not stated Source wording: "will have a capacity of 15 MW" | Planned Stage stated in source: Planned | campus 2 Apr 2024 | No. Basis unclear (not stated as IT, facility, grid or thermal). Never summed. | newswire.telecomramblings.com (opens in a new tab) |
| EUR 500 million Official source 500,000,000 EUR | Investment Investment in EUR millions Source wording: "500 million euro" | Announced Stage stated in source: Announced | campus 2 Apr 2024 | No. Marked not summable by research: Investment in EUR millions | newswire.telecomramblings.com (opens in a new tab) |
Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.
Sources (1), last checked 19 Oct 2026
- Data4 announces 500 million euro investment to develop a new Data Center campus in Milan of 100 MW (opens in a new tab), Data4 (press release via TR Newswire), published 2 Apr 2024, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.