Project record, campus

QTS Proyecto Rhodes data centre campus (Calatorao, Zaragoza)

PermittedSpainAragón

Proyecto Rhodes is a campus of eight data centre buildings on about 223 hectares at Calatorao promoted by QTS, part of Blackstone. The Government of Aragón granted partial final approval of its general interest plan at the end of September 2026. Europa Press reports an investment of up to EUR 13,471 million and first infrastructure operating in 2028. The environmental assessment for later stages is still pending.

Reported figures

Reported figures for QTS Proyecto Rhodes data centre campus (Calatorao, Zaragoza)
FigureWhat it measuresDelivery stateScope and dateUsed in totalsSource
up to EUR 13.47 billion
Third-party reported
Upper bound
13,471,000,000 EUR
Investment
Investment in EUR millions, upper bound
Source wording: "hasta 13.471 millones de euros"
Announced
Stage stated in source: Announced
campus
30 Sept 2026
No. Upper bound only ("up to"). Not added to totals.europapress.es (opens in a new tab)
650 MW
Third-party reported
Total facility power
Planned electrical capacity of the first phase as reported. Not IT load
Source wording: "650 megavatios de capacidad eléctrica prevista en su primera fase"
Planned
Stage stated in source: Planned
campus
30 Sept 2026
No. Marked not summable by research: Planned electrical capacity of the first phase as reported. Not IT loadeldiario.es (opens in a new tab)

Each figure is shown as reported, with its own definition. IT, facility, grid and thermal figures are never added together. Capacity definitions.

Power and grid

650 MW of electrical capacity planned in the first phase according to the project file, as reported by elDiario.es. The approval includes a substation. eldiario.es (opens in a new tab)

What changed

  1. 30 Sept 2026 Partial final approval of the general interest plan europapress.es (opens in a new tab)
Sources (3), last checked 19 Oct 2026
  1. Plan de Interés General de Aragón Proyecto Rhodes, campus data center en Calatorao (aprobación definitiva parcial) (opens in a new tab), Gobierno de Aragón, accessed 19 Oct 2026
  2. El Gobierno de Aragón aprueba el PIGA de Rhodes y avisa de que el Real Decreto de centros de datos lo puede frenar (opens in a new tab), Europa Press, published 30 Sept 2026, accessed 19 Oct 2026
  3. Luz verde a las obras para el campus de centros de datos de Blackstone en Calatorao (opens in a new tab), elDiario.es Aragón, published 30 Sept 2026, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.