Esc

↑↓ move Enter openFull search with filters

Esta sección aún no está traducida. El contenido siguiente se muestra en inglés, tal como se publicó. Leer la versión en inglés.

Last reviewed · How we check sources

Resources

Guides and checklists

Practical, source-backed guides for buyers, engineers and analysts.

Where to start: from first question to purchase

  1. UnderstandGuides on chip power, energy supply and IT equipment
  2. Ask the right questionsBuyer checklists for liquid cooling and critical power
  3. Explore and compareDC Explorer in 3D and supplier comparison
  4. EstimateCost benchmarks and a worksheet with visible assumptions
  5. Check the datesPolicy deadlines and data centre events

Explainers

  • Power explainer800 V DC power for AI racks, explainedWhat 800 V DC power for AI racks is, why NVIDIA says 54 V in-rack power hits limits above 200 kW, the copper and efficiency claims, and what is still maturing.
  • Cooling explainerDirect liquid cooling, explainedHow direct liquid cooling works: cold plates, the technology cooling loop, CDUs and facility water, ASHRAE W17 to W45 water classes, and single versus two-phase.
  • Rack explainerNVIDIA Kyber rack-scale systems, explainedWhat NVIDIA Kyber is: the MGX rack after Oberon, vertical compute blades, 144 GPUs per rack, 800 VDC power and liquid cooling. NVIDIA's own roadmap and dates.
  • Regulation explainerSecondary cooling loop regulationHow the CDU controls the secondary loop and the rules that apply.

All explainers · Policy deadline calendar · Critical power package boundaries · Liquid cooling retrofit RFI

Buyer checklists

Guides

guide

Capacity definitions: IT, facility, grid and thermal MW

Data centre capacity numbers mix very different things: IT load, facility power, grid connection, thermal cooling capacity and battery energy. This guide explains each measure, how they relate, and the roll-up rules CoolPower Index uses so that unlike numbers are never added together.

guide

CDU comparison guide

How to compare coolant distribution units fairly: which fields matter, why capacity only means something at a stated approach temperature, flow and fluid, and a table of published CDU data with every missing value marked not disclosed rather than guessed.

checklist

Cooling and power RFI checklist

A practical request-for-information checklist for data centre cooling and power equipment, covering supplier status, product shipping status, CDU and liquid cooling details, heat rejection, power and backup, and commercial terms, so bids can be compared on the same basis.

guide

Cooling technology selection guide

A plain guide to choosing between air, rear-door heat exchangers, direct-to-chip liquid cooling (single and two-phase) and immersion, and to matching heat rejection, water temperature and heat reuse options to rack density, site constraints and the policy context.

calendar

Data centre policy deadline calendar

An outline calendar of dated data centre policy milestones across the CoolPower Index seed markets, built from the site's sourced policy records: reporting deadlines, compliance dates and consultation closes, each linked to its policy record and official source.

Guide

How chip power drives rack density and cooling

Power, cooling and roadmap data for GPUs, AI accelerators, HBM and network silicon, from vendor sources.

Guide

Data centre power and water

Forecast electricity demand to 2030 and beyond, electricity and water by data centre type, how cooling changes both, a calculator and plant noise.

Guide

Energy supply pathways

Grid, on-site generation, storage, renewables and nuclear compared by delivery, firmness and timing.

Library

IT equipment that changes the facility

Power and cooling requirements of rack systems, servers and accelerators from vendor documentation.

Tools

Calendars

How deep each buyer checklist goes

Questions and sources in each buyer checklist

Counted from each checklist on CoolPower Index.

Show the data as a table
ChecklistQuestionsSources
Liquid-cooling retrofit: an interface-first RFI52
Critical power: compare package boundaries before prices52

Watch: liquid cooling in practice

Official videos from Schneider Electric and Vertiv's own YouTube channels. They load from YouTube only when you press play. Inclusion is editorial, not an endorsement.

AI Data Center Liquid Cooling: End-to-End High-Density Solutions | Schneider Electric Schneider Electric on YouTube. Watch on YouTube
NEXTDC Liquid Cooling Centre of Excellence: A collaborative AI infrastructure project Vertiv on YouTube. Watch on YouTube