In Sweden Svenska kraftnät puts data centre electricity use at about 3 TWh today, with 2050 scenarios from 9 to 41 TWh. The Brookfield plan for Strängnäs, up to SEK 95 billion and 750 MW, faced an unresolved power supply question in March 2026.
- Tracked project records
- 3
- Policy records
- 0
- Cloud regions
- 0
- Last checked
- 19 Oct 2026
Overview
In Borlänge, EcoDataCenter is building a campus on a former paper mill site with 250 MW at launch and potential for 600 MW, and Mistral AI will use it from 2027. Microsoft announced SEK 33.7 billion over two years in 2024 for its existing sites at Sandviken, Gävle and Staffanstorp, including about 20,000 GPUs.
Grid context
Svenska kraftnät scenarios for 2050 range widely, which shows how uncertain data centre demand is for grid planning.
Latest changes
- Project 16 Mar 2026 Brookfield AI data centre campus (Strängnäs)SVT reports power supply unresolved and other sites under study Related: Brookfield AI data centre campus (Strängnäs). svt.se (opens in a new tab)
Tracked projects
| Project | Level | Stage | Operator or developer | Latest change |
|---|---|---|---|---|
| Brookfield AI data centre campus (Strängnäs) | campus | Delayed | Brookfield | 16 Mar 2026: SVT reports power supply unresolved and other sites under study |
| EcoDataCenter 2 campus (Kvarnsveden, Borlänge) | campus | Under construction | EcoDataCenter | not disclosed |
| Microsoft Sweden Central data centres (Gävle, Sandviken, Staffanstorp) | campus | Operating | Microsoft | not disclosed |
Capacity in tracked public coverage
Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 3 published project records we track for Sweden. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.
None of the tracked project records for Sweden has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.
Figures not counted (5) and why
- Brookfield AI data centre campus (Strängnäs)
- Other 750 MW: Basis unclear (not stated as IT, facility, grid or thermal). Never summed.
- Investment up to SEK 95 billion: Upper bound only ("up to"). Not added to totals.
- EcoDataCenter 2 campus (Kvarnsveden, Borlänge)
- Grid connection 250 MW: Marked not summable by research: Power access at launch
- Grid connection up to 600 MW: Upper bound only ("up to"). Not added to totals.
- Microsoft Sweden Central data centres (Gävle, Sandviken, Staffanstorp)
- Investment SEK 33.7 billion: Marked not summable by research: SEK billions over two years, covers more than the data centres
Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.
Hyperscaler and AI cloud activity in Sweden
3 tracked projects in Sweden, of which 2 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Europe, Middle East and Africa (EMEA) region on the hyperscaler and cloud hub.
| Project | Stage | Operator, developer or owner | Hyperscaler or AI tenant | Announced | Expected |
|---|---|---|---|---|---|
| EcoDataCenter 2 campus (Kvarnsveden, Borlänge) Dalarna | Under construction | EcoDataCenter | Mistral AI (officially stated) | not stated | 2027 |
| Microsoft Sweden Central data centres (Gävle, Sandviken, Staffanstorp) Gävleborg and Skåne | Operating | Microsoft | not stated | 2024-06-03 | not stated |
Capacity, forecasts and market share: Sweden
Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.
Current capacity and pipeline
| Figure | What it measures | State | Period or as of | Source |
|---|---|---|---|---|
| about 3 TWh Official source | Electricity use Data centre electricity use in Sweden, Svenska kraftnät Source statement (paraphrased): "data centres about 3 TWh today" | Operational | today (as stated in the 2026 analysis) | Svenska kraftnät (opens in a new tab) Published 2026. Accessed 19 Oct 2026. |
Forecasts and scenarios
| Figure | What it measures | Period or as of | Source |
|---|---|---|---|
| 41 TWh Scenario | Electricity use Scenario: High electrification scenarios (HP and HF) Svenska kraftnät long-term scenario for data centre electricity use Source statement (paraphrased): "41 TWh in 2050 (HP and HF)" | 2050 | Svenska kraftnät (opens in a new tab) Published 2026. Accessed 19 Oct 2026. |
| 27 TWh Scenario | Electricity use Scenario: Middle scenario (MM) Svenska kraftnät long-term scenario for data centre electricity use Source statement (paraphrased): "27 TWh in 2050 (MM)" | 2050 | Svenska kraftnät (opens in a new tab) Published 2026. Accessed 19 Oct 2026. |
| 9 TWh Scenario | Electricity use Scenario: Low scenario (LF) Svenska kraftnät long-term scenario for data centre electricity use Source statement (paraphrased): "9 TWh in 2050 (LF)" | 2050 | Svenska kraftnät (opens in a new tab) Published 2026. Accessed 19 Oct 2026. |
Forecasts and scenarios are shown side by side and never averaged.
Cloud market share
Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.
Cloud regions in Sweden
A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.
No cloud regions recorded.
Policy timeline
No policy records published.
Operators and developers
- Brookfield Investor, Developer
- Microsoft Hyperscaler, Developer, Occupier
- EcoDataCenter Colocation owner, Developer
- Mistral AI Occupier
Sources (6), last checked 19 Oct 2026
- Långsiktig marknadsanalys 2026 (opens in a new tab), Svenska kraftnät, published 2026, accessed 19 Oct 2026
- Brookfield to advance AI infrastructure in Sweden through SEK 95 billion investment (opens in a new tab), Brookfield Asset Management, published 4 Jun 2025, accessed 19 Oct 2026
- Strängnäs kan mista delar av gigantiska AI-satsningen, Brookfield tittar på bredare lösningar (opens in a new tab), SVT Nyheter, published 16 Mar 2026, accessed 19 Oct 2026
- EcoDataCenter breaks ground on mega campus in Borlänge (opens in a new tab), EcoDataCenter, accessed 19 Oct 2026
- EcoDataCenter och Mistral AI bygger storskalig europeisk AI-infrastruktur i Borlänge (opens in a new tab), EcoDataCenter, published 11 Feb 2026, accessed 19 Oct 2026
- Microsoft tillkännager en investering på 33,7 miljarder kronor under två år i moln- och AI-infrastruktur (opens in a new tab), Microsoft Sverige, published 3 Jun 2024, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.