Operator profile
Open Access Data Centres (OADC)
Open Access Data Centres builds and runs data centres in Africa. In Lagos it lists a 24 MW data centre, LOS1. Techeconomy reported in July 2026 that OADC opted for an initial 6 MW phase that can grow to 24 MW and is looking at gas to power the site.
Footprint covered here
Project records on this site: OADC LOS1 (Lagos), under construction, 24 MW as stated.
Tracked projects
| Project | Role | Country | Stage |
|---|---|---|---|
| OADC LOS1 (Lagos) | Developer, Owner | Nigeria | Under construction |
Markets
Sources (2), last checked 19 Oct 2026
- OADC Lagos (LOS1) (opens in a new tab), Open Access Data Centres, accessed 19 Oct 2026
- EXCLUSIVE: OADC Explores Option of Using Gas to Power Data Centre in Nigeria (opens in a new tab), Techeconomy, published 14 Jul 2026, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.