Market profile

Netherlands

In the Netherlands the Dutch Data Center Association reports about 935 MW of operational colocation IT power in Q2 2026, up 6.6% in a year, and says grid congestion, permits and a lack of sites now limit growth. The cancelled Meta Zeewolde campus showed how local opposition can stop very large projects.

Tracked project records
5
Policy records
0
Cloud regions
0
Last checked
19 Oct 2026

Projects in Netherlands Policy timeline

Grid context

Grid congestion is named by the Dutch Data Center Association as a main limit on new capacity, together with permitting and site availability.

Latest changes

  1. Project 1 Jul 2022 Meta Zeewolde data centre (cancelled)Project officially cancelled Related: Meta Zeewolde data centre (cancelled). datacenterdynamics.com (opens in a new tab)

All changes

Tracked projects

ProjectLevelStageOperator or developerLatest change
Google Eemshaven data centre campus (Groningen)campusOperatingGooglenot disclosed
Google Groningen Westpoort data centre (fourth Dutch site)campusUnder constructionGooglenot disclosed
Google Middenmeer data centrecampusOperatingGooglenot disclosed
Google Winschoten data centre (third Dutch site)campusOperatingGooglenot disclosed
Meta Zeewolde data centre (cancelled)campusCancelledMeta Platforms1 Jul 2022: Project officially cancelled

Filter all projects by Netherlands

Capacity in tracked public coverage

Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 5 published project records we track for Netherlands. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.

None of the tracked project records for Netherlands has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.

Figures not counted (5) and why

Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.

Hyperscaler and AI cloud activity in Netherlands

5 tracked projects in Netherlands, of which 5 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Europe, Middle East and Africa (EMEA) region on the hyperscaler and cloud hub.

Hyperscaler and AI cloud projects in Netherlands
ProjectStageOperator, developer or ownerHyperscaler or AI tenantAnnouncedExpected
Google Eemshaven data centre campus (Groningen)
Groningen
OperatingGooglenot stated2014not stated
Google Groningen Westpoort data centre (fourth Dutch site)
Groningen
Under constructionGooglenot stated2024not stated
Google Middenmeer data centre
North Holland
OperatingGooglenot statednot statednot stated
Google Winschoten data centre (third Dutch site)
Groningen
OperatingGooglenot stated2024not stated
Meta Zeewolde data centre (cancelled)
Flevoland
CancelledMeta Platformsnot statednot statednot stated

Capacity, forecasts and market share: Netherlands

Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.

Current capacity and pipeline

Current capacity and pipeline, Netherlands
FigureWhat it measuresStatePeriod or as ofSource
about 935 MW
Third-party reported
IT power
Operational IT power of the Dutch colocation market only (hyperscale self-build not included), up 6.6% year on year
Source statement (paraphrased): "circa 935 MW operationeel IT-vermogen"
Operational2026 Q2Dutch Data Center Association (opens in a new tab)
Published 15 Oct 2026. Accessed 19 Oct 2026.

Forecasts and scenarios

Forecast: not publicly reported by a named publisher in a source we could check.

Dutch Data Center Association, Operational, 2026 Q2: about 935 MW. Bars are separate published figures and are not added together.Dutch Data Center Association: IT power, operational, 2026 Q2about 935 MW
MW. Solid bars: current. Lighter bars: pipeline. Dashed outline bars: forecasts or scenarios. A range is drawn from its low to its high end. The data table is above.

Cloud market share

Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.

Download these 1 figures as CSV All market figures (CSV)

Cloud regions in Netherlands

A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.

No cloud regions recorded.

Policy timeline

No policy records published.

Operators and developers

Sources (3), last checked 19 Oct 2026
  1. Nederlandse digitale economie versnelt naar recordhoogte, maar fysieke grenzen worden urgenter (opens in a new tab), Dutch Data Center Association, published 15 Oct 2026, accessed 19 Oct 2026
  2. Facebook parent Meta officially kills Zeewolde data center after pushback in the Netherlands (opens in a new tab), DatacenterDynamics, published 1 Jul 2022, accessed 19 Oct 2026
  3. Middenmeer, Netherlands data center location page (opens in a new tab), Google Data Centers, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.