Market profile

Japan

For Japan the IEA expects Japanese data centre electricity use to grow by about 15 TWh between 2024 and 2030. SoftBank plans an AI data centre of over 150 MW on the former Sharp Sakai plant site in Osaka.

Tracked project records
1
Policy records
0
Cloud regions
0
Last checked
19 Oct 2026

Projects in Japan Policy timeline

Overview

The SoftBank and Sharp memorandum of June 2024 covers about 440,000 square metres of the former Sakai LCD plant. SoftBank planned full operation in 2025 and later growth to over 400 MW. The status after the memorandum was not rechecked, so the project is shown as announced.

Grid context

OCCTO demand forecasts include data centres, but the data centre figures could not be read from the checked document, so none are shown.

Tracked projects

ProjectLevelStageOperator or developerLatest change
SoftBank AI data centre at the former Sharp Sakai plant (Osaka)campusAnnouncedSoftBanknot disclosed

Filter all projects by Japan

Capacity in tracked public coverage

Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 1 published project record we track for Japan. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.

None of the tracked project records for Japan has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.

Figures not counted (2) and why

Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.

Hyperscaler and AI cloud activity in Japan

1 tracked project in Japan, of which 0 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Asia Pacific (APAC) region on the hyperscaler and cloud hub.

Capacity, forecasts and market share: Japan

Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.

Current capacity and pipeline

Operational, under construction and planned capacity: not publicly reported in a source we could check.

Forecasts and scenarios

Published forecasts, Japan
FigureWhat it measuresPeriod or as ofSource
about 15 TWh
Forecast
Electricity use
IEA Base Case increase in Japan data centre electricity consumption (plus 80%)
Source statement (paraphrased): "in Japan by around 15 TWh (up 80%)"
2024 to 2030 (increase)International Energy Agency (opens in a new tab)
Published 10 Apr 2025. Accessed 19 Oct 2026.
International Energy Agency, forecast, 2024 to 2030 (increase): about 15 TWh. Bars are separate published figures and are not added together.International Energy Agency: Electricity use, forecast, 2024 to 2030 (increase)about 15 TWh
TWh. Solid bars: current. Lighter bars: pipeline. Dashed outline bars: forecasts or scenarios. A range is drawn from its low to its high end. The data table is above.

Cloud market share

Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.

Download these 1 figures as CSV All market figures (CSV)

Cloud regions in Japan

A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.

No cloud regions recorded.

Policy timeline

No policy records published.

Operators and developers

Sources (2), last checked 19 Oct 2026
  1. Energy and AI: energy demand from AI (opens in a new tab), International Energy Agency, published 10 Apr 2025, accessed 19 Oct 2026
  2. SoftBank and Sharp MoU on a large-scale AI data center at the Sharp Sakai Plant (opens in a new tab), SoftBank Corp., published 7 Jun 2024, accessed 19 Oct 2026

Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.