Data centre cooling and power explained

How a data centre gets rid of heat and where its power comes from, in plain English. Start with the path below, which follows a watt from the chip to the grid, or pick a topic. Each guide cites the standards body, regulator or company that published the facts.

Follow the heat: from the chip to the grid in six steps

  1. The chipWhere the heat startsGPU and memory power, per chip and per rack
  2. The rackPower into the rack800 V DC and rack-scale systems such as Kyber
  3. The cold plateLiquid takes the heatHow direct liquid cooling works
  4. The CDUThe secondary loopHow the CDU controls the loop, and the rules
  5. OutsideHeat, water and noiseDry coolers, cooling towers and what 1 GW needs
  6. The gridWhere the power comes fromGrid, on-site generation, batteries and nuclear

New to the jargon? Terms such as PUE, CDU and UPS are in the glossary, and the headline numbers are on statistics.

The guides at a glance

12

plain-English guides and explainers on this page

6

topics, from cooling and power to cost and resilience

6

steps from the chip to the grid, each linked to its guide

11

official sources cited in the 3 technology explainers alone

All guides, by topic

Cooling

  • Cooling explainerDirect liquid cooling, explainedHow direct liquid cooling works: cold plates, the technology cooling loop, CDUs and facility water, ASHRAE W17 to W45 water classes, and single versus two-phase.Evidence 5
  • Regulation explainerSecondary cooling loop regulationHow the CDU controls the secondary (TCS) loop and the rules that apply: ASHRAE classes, EU reporting, EnEfG, pressure equipment and F-gas rules.

Power and chips

  • Power explainer800 V DC power for AI racks, explainedWhat 800 V DC power for AI racks is, why NVIDIA says 54 V in-rack power hits limits above 200 kW, the copper and efficiency claims, and what is still maturing.Evidence 2
  • Rack explainerNVIDIA Kyber rack-scale systems, explainedWhat NVIDIA Kyber is: the MGX rack after Oberon, vertical compute blades, 144 GPUs per rack, 800 VDC power and liquid cooling. NVIDIA's own roadmap and dates.Evidence 4
  • Chip guideChip power, rack density and coolingWhy GPU and HBM power keeps rising, what it means per rack, and the specifications behind NVIDIA Vera Rubin and Kyber.
  • Energy guideEnergy supply pathwaysGrid connection, on-site generation, batteries and nuclear: the options for powering a data centre and what each needs.

Water and noise

  • Power and water guideData centre power and water, explainedHow 1 GW of IT load turns into grid supply, heat rejected and water use, with PUE and WUE by cooling method, a calculator and the noise of each heat rejection system.

Cost and money

  • Cost guideConstruction cost per MWPublished cost benchmarks for building a data centre by market, with a worksheet to test your own assumptions.
  • Money explainerEuropean electricity prices by countryMonthly wholesale power prices in the UK, Ireland, Germany, the Netherlands, France and the Nordics since 2019, and what 1 MW of constant load pays.

Resilience

Reference

  • ReferenceData centre glossaryPUE, CDU, UPS, cooling towers, PPAs and AI terms in plain English, each with a source.
  • ReferenceData centre statisticsHeadline figures on electricity, PUE, rack density, water and grid queues, each with its source and date.