Data centre heat reuse
Heat reuse exports data centre heat to district heating, buildings or industry, usually via plate heat exchangers and often heat pumps. Liquid cooling raises the heat grade. In Germany EnEfG section 11 sets energy reuse factor requirements for new data centres, so heat reuse is becoming a design and permitting question.
Also called: waste heat recovery, district heating, ERF, energy reuse factor, heat export
What it is
Warm facility water passes through a plate heat exchanger to a heat network. Where the network needs higher temperatures, heat pumps lift the temperature at an electricity cost.
Example
Alfa Laval describes HeatChain in Finland using AlfaQ plate heat exchangers in modular data boiler sites that feed district heating, with the company reporting 50 GWh of heat delivered in 2025. That is a company claim for a specific scheme, not a general benchmark.
Policy link
Germany's EnEfG section 11 sets energy reuse factor targets for new data centres by commissioning date (see policy record de-enefg-section-11-data-centres). EU data centre reporting under the EED includes reuse indicators (eu-eed-data-centre-reporting). Check current text and dates in those records.
Sourcing considerations
Heat offtake contracts, offtaker demand profile, temperature and reliability obligations, metering boundary for ERF, heat pump ownership, and what happens when the offtaker does not take heat.
Questions to ask suppliers
- Offtaker identity, temperature and seasonal demand
- ERF metering boundary and calculation method
- Heat pump need and who pays its electricity
- Backup heat rejection when offtake stops
- Contract term and liability
Suppliers with public evidence
Listed alphabetically. Inclusion means a public source shows the company offers products or services for this technology. It is not a ranking or endorsement. Compare these suppliers.
Projects using or planning it
Relevant policy
Sources (3), last checked 18 Oct 2026
- AlfaQ heat exchangers and district heating (HeatChain) (opens in a new tab), Alfa Laval, accessed 18 Oct 2026
- EnEfG section 11 (opens in a new tab), Bundesministerium der Justiz, accessed 18 Oct 2026
- Energy performance of data centres (opens in a new tab), European Commission, accessed 18 Oct 2026