Market profile
Mexico
In Mexico ODATA switched on its QR03 building with 72 MW of IT power for hyperscale customers in February 2026. Other large campus announcements could not be checked against an accessible source for this release.
- Tracked project records
- 1
- Policy records
- 0
- Cloud regions
- 0
- Last checked
- 19 Oct 2026
Overview
DCD describes QR03 in Querétaro as the first building of what it calls the largest data centre campus in Mexico, aimed at hyperscale customers for cloud and AI workloads. The 72 MW is IT power for that building only and is not a national figure.
Grid context
No public data centre grid or demand figure was checked.
Tracked projects
| Project | Level | Stage | Operator or developer | Latest change |
|---|---|---|---|---|
| ODATA QR03 (Querétaro) | campus | Operating | ODATA | not disclosed |
Capacity in tracked public coverage
Tracked public coverage, not a national total. Sums of reported, project-level figures from 0 of the 1 published project record we track for Mexico. Each metric and each delivery class is summed on its own and never added to another. Confirmed operating capacity never includes design or ultimate capacity. Delayed projects are never counted as under construction now. Campus and phase figures are not double counted. Ranges and upper bounds are not summed. Unknown values are not counted as zero.
None of the tracked project records for Mexico has a figure that can be summed yet. Figures with an unclear basis and undisclosed values are never added. Each project page lists its reported figures as published. Not disclosed is not zero.
Figures not counted (1) and why
- ODATA QR03 (Querétaro)
- IT power 72 MW: Marked not summable by research: IT power of the first building
Method: capacity rules. Company-wide investment, area figures and third-party market estimates are never included in these sums.
Hyperscaler and AI cloud activity in Mexico
1 tracked project in Mexico, of which 0 involve a hyperscaler or AI cloud as owner, operator, developer or a stated or reported tenant. Part of the Americas region on the hyperscaler and cloud hub.
Capacity, forecasts and market share: Mexico
Every number is shown as published, with its basis, date and source. Figures with different bases (IT power, grid connection, electricity use) or from different sources are never added or blended. Where no figure exists we say not publicly reported. CoolPower makes no forecasts of its own.
Current capacity and pipeline
Operational, under construction and planned capacity: not publicly reported in a source we could check.
Forecasts and scenarios
Forecast: not publicly reported by a named publisher in a source we could check.
Cloud market share
Provider market share: not publicly reported. No public provider market share by country was found except mainland China (Omdia via DCD). Every other country page shows not publicly reported.
No figures to download yet. All market figures (CSV)
Cloud regions in Mexico
A cloud region is a provider's service area. It is not a data centre campus and has no MW figure here.
No cloud regions recorded.
Policy timeline
No policy records published.
Operators and developers
- ODATA Colocation owner, Colocation operator
Sources (1), last checked 19 Oct 2026
- ODATA enciende QR03 y consolida el mayor campus de data centers de México para la era de la IA (opens in a new tab), DatacenterDynamics en español, published 23 Feb 2026, accessed 19 Oct 2026
Last checked 19 Oct 2026 by CoolPower Index research (automated, sourced). Report a correction.