US data centre power: what the grid charges, who is queuing and what is really connected
PJM capacity auction results by year, the ERCOT large-load queue and utilities' own data centre pipelines, in one place. For engineers sizing power, buyers and consultants judging timelines, and investors following the cost of capacity. Every figure is dated, sourced and labelled Live, Confirmed or Projected.
Not investment advice. Prices and pipelines come from grid operators, utilities and named publishers. Forecasts and plans are theirs, shown with their date. We make no forecasts or recommendations.
US data centre power in brief
PJM, the grid operator that serves Northern Virginia, cleared its capacity auction at the price cap for three delivery years in a row: US$325.00 per MW-day for June 2028 to May 2029, against US$28.92 for 2024/25.
The value of capacity cleared in PJM's auction rose from US$2.2bn for 2024/25 to US$16.4bn for 2028/29 (PJM's own figure). PJM notes this is not the total cost to consumers.
In Texas, large loads asking ERCOT to connect grew from 63 GW in December 2024 to about 474 GW by June 2026, about 90% of it data centres. That is more than five times ERCOT's record peak demand.
Requests are not demand. Of 9,456 MW of large loads approved to energise in ERCOT, the operator saw a peak of 4,132 MW actually in use in September 2026.
Utilities report their own pipelines on different definitions: Dominion over 54 GW of data centre capacity in contracting stages, AEP 84 GW of contracted load through 2031 and Southern Company 17 GW contracted. These are shown side by side, never added up.
Confirmed
US$325.00/MW-day
PJM capacity price for 2028/29, cleared at the cap
Live measured today, such as load actually in use.
Confirmed decided or signed, such as an auction result or a contract.
Projected asked for, planned or forecast, such as queue requests and pipelines.
US$ per MW-day
What PJM pays a power plant (or a demand response provider) to be available for one megawatt for one day. It is a price for capacity, not for energy used.
Cleared value (US$bn)
PJM's cleared megawatts times the clearing price. A guide to the size of the bill, not the total cost to consumers.
GW requested
What developers have asked a grid to connect. Many requests are duplicates or speculative, so this is not demand.
Contracted or in contracting
Each utility defines these stages itself, so pipelines from different utilities are shown side by side and never added up or ranked.
MW versus TWh
MW is power at a moment. TWh is energy used over a year.
PJM capacity auction results by year
PJM capacity auction clearing price by delivery year (US$ per MW-day) Confirmed · Auction result
Interactive chart loads here. The figures are also in the table below.
RTO-wide Base Residual Auction clearing price for unforced capacity (UCAP). From 2026/27 to 2028/29 the price cleared at a FERC-approved price cap, so the true market price would have been higher. PJM's own simulation without the cap and floor gives US$554.72 for 2028/29. Delivery years run June to May. Darker bars are years that cleared at the cap.
PJM capacity auction: value of cleared capacity by delivery year (US$bn) Confirmed · Auction result
Interactive chart loads here. The figures are also in the table below.
PJM's figure: cleared megawatts times the clearing price in each zone. PJM says it is not the total cost to consumers, because load hedged through self-supply or bilateral contracts does not pay the auction price. Its own simulation with no price cap or floor puts 2028/29 at US$29.7bn. Darker bars are years that cleared at the cap.
Texas (ERCOT): large loads asking to connect (GW requested) Projected · Connection requests
Interactive chart loads here. The figures are also in the table below.
Every point is ERCOT's own count of large-load interconnection requests (75 MW or more), as published by ERCOT or reported from its filings. Requests are not a forecast of demand: many are speculative or for the same project at several sites.
Published by ERCOT ERCOT's count as reported by a named outlet. Hover or tap a bar for its own source and date.
ERCOT Batch Zero: how the large-load requests were classified, September 2026 (GW requested) Projected · Conditional classification
Interactive chart loads here. The figures are also in the table below.
Batch Zero is ERCOT's one-time study of large loads that want to connect. Conditional classification issued 3 September 2026, final decisions due in December after the governor's audit. ERCOT's deck gives the studied total as both 125.4 GW (chart) and 127.9 GW (summary). Base load includes some loads that are already energised. The three groups are one set of submissions split by status, so they can be shown together.
ERCOT: approved to energise versus actually in use, September 2026 Live · Measured by ERCOT
ERCOT adds up each approved load's highest use in the month. It says this is how much approved load it believes is now operating. For scale, ERCOT set a September demand record of 86,647 MW on 12 September 2026.
Data centre load already online across Southern Company's system, with data centre electricity use up 49% in the first half of 2026. As of 30 Jul 2026.
US data centre electricity use in 2023, about 4.4% of US electricity (Lawrence Berkeley National Laboratory for the DOE). Its 2028 scenarios, 325 to 580 TWh, are forecasts. As of 2023.
Each utility reports its pipeline on its own definition and date, so these cards are not a ranking and are never added up. How much each utility plans to spend on the grid is compared in US utility capex plans, and the nuclear and gas power producers signing deals with data centres (Constellation, Vistra, Talen) in power producers' Q3 2026 results.
Projected · Pipeline in contracting stages
over 54 GW
Dominion Energy (Virginia (PJM)): Data centre capacity in various stages of contracting, including over 12 GW under signed electric service agreements. Over 6 GW was added since the end of 2025 (13%). As of 30 Oct 2026.
American Electric Power (11 states incl. Ohio, Texas, Virginia): Contracted load up 22% from 69 GW a quarter earlier, mainly SB Energy's 10.4 GW data centre campus in Piketon, Ohio. AEP has 14.4 GW of active requests for generation from its utilities. As of 28 Oct 2026.
Southern Company (Georgia, Alabama, Mississippi): Contracted large-load customers across 31 projects, with 8 GW more in late stages and a prospective pipeline above 75 GW. Over 1.2 GW of data centre load is already online. As of 30 Jul 2026.
Alberta (AESO) (Canada, for comparison): Data centre load requested against the first-stage grid room for large loads, which is fully allocated. As of 31 Oct 2026.
AEP five-year capital plan: previous versus new (US$bn) Company plan
Interactive chart loads here. The figures are also in the table below.
AEP's own plan as reported by Utility Dive from its third-quarter 2026 call on 28 October 2026. The new plan runs through 2031 and also includes about US$8bn for renewable energy. These are planned amounts, not money spent. AEP said the rise is driven by generation and transmission needed for contracted load, mostly data centres.
ERCOT and the State of Texas (3 Aug 2026): Governor Abbott ordered an audit of data centres and crypto mines in the queue. ERCOT has paused energising new large data centres until the audit and a community impact review are finished, with both reports due by 10 December 2026. ERCOT: Batch Zero Update (board item 14) (opens in a new tab)
What are the PJM capacity auction results by year?
PJM pays power plants to be ready for peak demand. That price shot up after 2024/25 and has since hit the agreed ceiling.
Why it matters The price rose about elevenfold in four years.
2024/25: around US$29 per MW per day
2025/26: around US$270
2026/27 to 2028/29: around US$325 to 333, at the cap
Source: PJM
How much does PJM's capacity auction cost?
About US$16bn a year for the next two years, up from around US$2bn.
Why it matters That is roughly seven times more, though PJM says it is not the full cost to households.
Around US$2.2bn (2024/25)
Around US$16.4bn (2027/28 and 2028/29)
Around US$30bn without the cap (simulation)
Source: PJM
How big is the ERCOT large load interconnection queue?
Huge. Requests to connect big users to the Texas grid reached around 474 GW, and about 9 in 10 are data centres.
Why it matters Only a fraction of these requests passed the first study.
Around 63 GW (December 2024)
Around 226 GW (November 2025)
Around 474 GW (June 2026)
Source: ERCOT
Why don't large-load requests turn into real demand?
Many requests are early bets. Developers apply for the same project in several places, before they have land, customers or money.
Why it matters In Texas, less than half the power approved for use was actually being drawn.
Around 9,500 MW approved
Around 4,100 MW actually used at peak (September 2026)
Source: ERCOT
How much electricity do US data centres use?
About 4 in every 100 units of US electricity in 2023, and that could double or triple by 2028.
Why it matters The 2028 figures are forecasts, not measurements.
176 TWh (2023), about 4.4%
Forecast: 325 to 580 TWh (2028)
Source: Lawrence Berkeley National Laboratory
Which utilities have the most data centre load under contract?
Dominion, AEP and Southern Company report the most, but each counts differently, so it is not a ranking.
Dominion: over 54 GW in contract talks
AEP: around 84 GW contracted to 2031
Southern Company: around 17 GW contracted
Source: Company reports
Coverage limits: this page covers PJM and ERCOT in detail, CAISO's new rules, three utilities that publish data centre pipelines, and Alberta for comparison. MISO, SPP, the Southeast outside Southern Company, the West and New York are not yet covered. Company logos come from Wikimedia Commons and are shown for identification only. They do not imply endorsement, and CoolPower Index is vendor-neutral. Flags: flag-icons (MIT licence). Charts: Apache ECharts (Apache 2.0). This is not investment advice. Related: North America briefing · Power and water forecasts · Markets & Investment · United States market profile · Energy supply pathways.