Where capacity is being built in Brazil, Mexico and Chile, how much grid power it is asking for, and the rules and money behind it. For engineers, buyers, consultants and investors. Every figure is dated, sourced and labelled Live, Confirmed or Projected.

Latin America in brief

  • Brazil is the giant of the region's pipeline: data centre projects have asked for 38 GW of grid access (Ministry of Mines and Energy, June 2026), and the grid operator ONS has accepted 7,040 MW of them. Requests are not capacity.
  • Brazil enacted the Redata tax regime on 15 September 2026, with conditions on clean power, water use and serving the domestic market. The rules that make it usable are still to come.
  • The biggest single build is Omnia's campus for ByteDance (TikTok) at Pecém, Ceará: 300 MW per phase, first module due in July 2027, and a court challenge from federal prosecutors.
  • Mexico is small and concentrated: 279 MW installed nationally, 72% of it in Querétaro, where 181 MW is under construction (MEXDC).
  • Chile's grid coordinator puts installed data centre capacity at about 398 MW in 2025 and about 1,381 MW by 2030 if identified projects are built. Santiago is almost full, with 4.3% vacancy (Cushman & Wakefield).

Flag of BrazilProjected

38 GW

of grid access requests from data centre projects in Brazil (June 2026)

Source: eixos (opens in a new tab)

Flag of BrazilConfirmed

7,040 MW

of data centre requests accepted by Brazil's grid operator ONS

Source: pv magazine Brasil (opens in a new tab)

Flag of MexicoLive

279 MW

installed data centre capacity in Mexico (MEXDC)

Source: El Economista (opens in a new tab)

Flag of ChileLive

about 398 MW

installed data centre capacity in Chile in 2025 (grid coordinator estimate)

Source: Coordinador Eléctrico Nacional (opens in a new tab)

Flag of ChileProjected

about 1,381 MW

in Chile by 2030 if identified projects are built (grid coordinator)

Source: Coordinador Eléctrico Nacional (opens in a new tab)

Understand the numbers

  • Live running today or measured for a past period (operational capacity, sites in operation, cloud regions in service).
  • Confirmed under construction, funded, formally committed, granted grid access or enacted in law. Not yet in service.
  • Projected connection requests, plans, targets, forecasts and challenges. They can change or not happen.
Exact figure types used on this page

Official figure · Grid operator estimate · Third-party estimate · Company statement · Under construction · Cloud region in service · Investment pledge · Grid access granted, not built · Connection requests · Adopted policy or law · Regulatory decision · Company target · Forecast · Reported setback. Hover or tap a badge to see the exact type. Grid connection requests, grid access already granted, installed capacity, capacity under construction and forecasts are different measures. They are never added together or drawn on one axis, and there is no cross-country capacity chart because no single publisher measures Brazil, Mexico and Chile the same way. MW is power, not energy used.

Flag of Brazil Brazil

Huge grid queue, a new tax regime and the TikTok campus at Pecém.

Projected · Connection requests

38 GW

Grid access requests from data centre projects, as reported by the Ministry of Mines and Energy (up from 28.5 GW in December 2025). Requests, not capacity. As of 1 Jun 2026.

Source: eixos: Sem Redata, pedidos de data centers chegam a 38 GW (opens in a new tab) Published 1 Jun 2026. Accessed 31 Oct 2026. Also: BNamericas: Brazil reaches 38GW in data center requests, US$28.7bn in new investments (Ministry of Mines and Energy figures) (opens in a new tab) Published 2 Jun 2026. Accessed 31 Oct 2026.

Confirmed · Adopted policy or law

Law 15,504/2026

The Redata tax regime for data centres, enacted on 15 September 2026. Qualifying projects must offer at least 10% of capacity to the domestic market, meet all power needs from renewable or low-emission sources and keep water use effectiveness at or below 0.05 L/kWh. The implementing regulation is still to come. As of 15 Sept 2026.

Source: Presidência da República (Planalto): Lei nº 15.504, de 2026 (Redata) (opens in a new tab) Published 15 Sept 2026. Accessed 31 Oct 2026. Also: Trench Rossi Watanabe: Brazil enacts Law no. 15,504/2026 creating the REDATA Tax Incentive Regime (opens in a new tab) Published 15 Sept 2026. Accessed 31 Oct 2026.

Projects, operators and all sources: Brazil market profile. Cooling and power suppliers: Cooling and CDUs · Chillers · Switchgear.

Flag of Mexico Mexico

Small today, and almost all of it in Querétaro.

Projects, operators and all sources: Mexico market profile. Mexico in the wider North American picture: US and North America briefing.

Flag of Chile Chile

Santiago is filling up, and the grid operator expects capacity to more than triple by 2030.

Chile: installed data centre capacity identified by the grid coordinator, 2025 estimate and 2026 to 2030 projects (MW) Projected · Forecast

One publisher, one measure: the Coordinador Eléctrico Nacional's cumulative installed capacity, from its long-term demand forecast published 7 October 2026 (figure 5-13). 2025 is its estimate of capacity in operation. 2026 to 2030 (dashed) add the projects it has identified in development, its best estimate at the report's cut-off date, so they are a forecast, not ours, and projects can slip or be cancelled. Data centre energy use in the same report rises from about 0.9 TWh in 2025 to 3.66 to 4.13 TWh a year by 2046, depending on the scenario.

Source: Coordinador Eléctrico Nacional: Proyección de Demanda de Largo Plazo del Sistema Eléctrico Nacional, periodo 2026-2046 (section 5.7.2, figure 5-13) (opens in a new tab) Published 7 Oct 2026. Accessed 31 Oct 2026.

Show the data as a table
YearInstalled capacityType
2025398 MWEstimate of capacity in operation (grid coordinator)
2026552 MWForecast: identified projects (grid coordinator)
2027642 MWForecast: identified projects (grid coordinator)
2028963 MWForecast: identified projects (grid coordinator)
20291,281 MWForecast: identified projects (grid coordinator)
20301,381 MWForecast: identified projects (grid coordinator)
Why Chile's data centre capacity figures differ: five counts side by side
SourceGeographyWhat it measuresDateFigure
Coordinador Eléctrico Nacional (grid coordinator) (opens in a new tab)Chile, whole countryInstalled data centre capacity, estimate2025about 398 MW
Cushman & Wakefield (opens in a new tab)SantiagoOperational capacitySecond half of 2025279 MW
GPS Property, via Emol (opens in a new tab)Santiago Metropolitan RegionInstalled capacity, 37 operating centresEnd of 2025258.5 MW
Colliers, via La Tercera (opens in a new tab)ChileInstalled capacity, 36 operating data centresPublished 22 Sep 2026255 MW
Government of Chile, National Data Centers Plan (opens in a new tab)ChileInstalled capacity when the plan was writtenPlan for 2024 to 2030198 MW

Each publisher counts a different area, date or definition, so these figures are never charted together or added up. The grid coordinator's national figure is the widest. Consultants count Santiago or commercial facilities only.

Confirmed · Investment pledge

more than US$4bn

AWS South America (Chile) Region, planned to open by the end of 2026 with three Availability Zones. AWS's Chile page still said "coming in 2026" when we checked on 31 Oct 2026. As of 7 May 2025.

Source: Amazon (press release): Amazon to Invest More Than $4 Billion to Launch Infrastructure Region in Chile (opens in a new tab) Published 7 May 2025. Accessed 31 Oct 2026. Also: AWS: AWS in Chile: a new AWS Region is coming to Chile in 2026 (opens in a new tab) Page checked 31 Oct 2026. Accessed 31 Oct 2026.

Projected · Regulatory decision

US$200m

Google's Cerrillos data centre: the environmental assessment service ruled on 16 Oct 2026 that the redesigned project, with 63 cooling units that use no water and 44 diesel backup generators (120.25 MW), does not need a full environmental impact review. Other permits are still needed. As of 19 Oct 2026.

Source: ADN Radio: Google logra luz verde para su Data Center en Cerrillos: no deberá ingresar a evaluación ambiental (opens in a new tab) Published 19 Oct 2026. Accessed 31 Oct 2026.

No Chile market profile yet. The figures above are the main record for now.

The money: hyperscaler pledges and big projects

Headline pledges by AWS and Microsoft, and the largest project budgets, are compared side by side with each figure's own period on Markets & Investment: Latin America. They cover different periods and are never added up. Not investment advice.

Watch: Latin American data centres

Official videos from Amazon Web Services and Scala Data Centers' own channels. They load from YouTube only when you press play.

Mexico (Central) Region is now open | Amazon Web Services Amazon Web Services on YouTube. Watch on YouTube
Institutional Video - Scala Data Centers Scala Data Centers on YouTube. Watch on YouTube

Common questions

How big is the Latin America data centre market?

Each country measures differently, so there is no one total. Brazil has the most sites, Mexico and Chile are smaller.

Why it matters Brazil has had requests for 38 GW of grid power for data centres, far more than is being built.

  • Brazil: around 200 data centres running, 38 GW of grid requests (June 2026)
  • Mexico: around 280 MW installed
  • Chile: around 400 MW installed (2025)

Source: Brazil Ministry of Mines and Energy, MEXDC, Chile grid coordinator

What is Brazil's Redata data centre law?

A Brazilian law from September 2026 that cuts federal taxes on data centre equipment, if the site uses clean power, saves water and serves Brazilian customers too.

Why it matters Water use effectiveness (WUE) means litres of water per unit of electricity used. The law sets a very low limit.

  • Law 15,504 of 15 September 2026
  • At least 10% of capacity for the home market
  • Water limit: 0.05 litres per kWh

Source: Brazilian federal law

Is TikTok building a data centre in Brazil?

Yes. A company called Omnia is building a large campus in north-east Brazil for ByteDance, which owns TikTok. Prosecutors want it paused until local Indigenous people are consulted.

  • 300 MW per phase, 200 MW for ByteDance
  • First phase: around R$50bn, started January 2026
  • First part due: July 2027

Source: Diário do Nordeste

When will the AWS Chile region launch?

AWS said its Chile cloud region would open by the end of 2026. When we checked on 31 October 2026, it still said 2026.

  • 3 availability zones (separate buildings)
  • More than US$4bn of investment

Source: AWS

Does Google's data centre in Chile use water for cooling?

Not in the new design. After a court case about groundwater, Google redesigned its Santiago project to use cooling units that need no water.

  • 63 water-free cooling units
  • Reviewed October 2026

Source: ADN Radio, Chile environmental assessment service

FAQ sources: BNamericas: Brazil reaches 38GW in data center requests, US$28.7bn in new investments (Ministry of Mines and Energy figures) (opens in a new tab); El Economista: Querétaro concentra 72% de la capacidad instalada de centros de datos (opens in a new tab); Coordinador Eléctrico Nacional: Proyección de Demanda de Largo Plazo del Sistema Eléctrico Nacional, periodo 2026-2046 (section 5.7.2, figure 5-13) (opens in a new tab); Presidência da República (Planalto): Lei nº 15.504, de 2026 (Redata) (opens in a new tab); Diário do Nordeste: Data center do TikTok no Ceará começa a operar em 2027, diz Omnia (opens in a new tab); Ministério Público Federal (Ceará): MPF e DPU vão à Justiça para impedir operação de data center no Complexo do Pecém (opens in a new tab); Amazon (press release): Amazon to Invest More Than $4 Billion to Launch Infrastructure Region in Chile (opens in a new tab); AWS: AWS in Chile: a new AWS Region is coming to Chile in 2026 (opens in a new tab); ADN Radio: Google logra luz verde para su Data Center en Cerrillos: no deberá ingresar a evaluación ambiental (opens in a new tab).

Coverage limits: this briefing covers Brazil, Mexico and Chile. Colombia, Argentina, Peru, Uruguay, Panama and Central America are not yet covered. Brazil publishes counts of sites and grid requests rather than an official national MW figure, so the measures differ by country and are labelled. Company logos come from Wikimedia Commons or Simple Icons and are shown for identification only. They do not imply endorsement, and CoolPower Index is vendor-neutral. Flags: flag-icons (MIT licence). Charts: Apache ECharts (Apache 2.0). This is not investment advice. Other regions: Regions · North America · Europe and UK · Middle East and Africa · Asia Pacific · China · Compare markets.