Esc

↑↓ move Enter openFull search with filters

Esta sección aún no está traducida. El contenido siguiente se muestra en inglés, tal como se publicó. Leer la versión en inglés.

Prefabricated Modular Infrastructure

Europe is now the most expensive region to build a data centre, Turner & Townsend says

What changed

The 2026-27 Data Centre Construction Cost Index covers 62 markets for a typical 60 MW design. Average costs in Europe and North America rose 13% year on year, double the global rate of 6%. Tokyo leads at US$18.28 per watt and Copenhagen, Oslo, Stockholm and Helsinki are all in the top ten. Over half of respondents named power as a major obstacle.

View original source (opens in a new tab)
Read the original: Turner & Townsend: Europe is now the most expensive region to build a data centre, Turner & Townsend says (opens in a new tab)
We summarise in our own words and link the source. Figures are as reported by the source and not independently verified. Report a correction.

Related index data

A supplier link means the company is named in the story or offers this kind of product. It does not mean a contract unless the story says so.

More in Prefabricated Modular Infrastructure