Esc

↑↓ move Enter openFull search with filters

Dieser Bereich ist noch nicht übersetzt. Der folgende Inhalt wird auf Englisch angezeigt, wie veröffentlicht. Englische Fassung lesen.

Gensets & On-site Power

Baker Hughes wins about 1.1 GW power and Chart dry cooler order from an unnamed US technology company

What changed

The power order, booked in Q3 2026, covers 34 Frame 5 gas turbines, nine NovaLT16 turbines, BRUSH generators and gears. Chart dry coolers for a closed-loop cooling system were booked in Q4 2026. The equipment supports AI training and inference infrastructure, and the customer was not disclosed.

View original source (opens in a new tab)
Read the original: Baker Hughes: Baker Hughes wins about 1.1 GW power and Chart dry cooler order from an unnamed US technology company (opens in a new tab)
We summarise in our own words and link the source. Figures are as reported by the source and not independently verified. Report a correction.

Related index data

A supplier link means the company is named in the story or offers this kind of product. It does not mean a contract unless the story says so.

Related on CoolPower Index: AI news.

More in Gensets & On-site Power